AQ0082MSS06A |
Hilcorp Alaska, LLC |
Valdez Marine Terminal |
|
|
2024|10|03 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Tank Degassing Thermal Oxidizer |
|
10 |
|
|
In-house |
AQ0009MSS05A |
Hilcorp Alaska, LLC |
Steelhead Platform |
Application, On Hold |
Permit on hold due to BACT footnote issue. |
2014|08|19 |
0001|01|01 |
0001|01|01 |
2014|09|11 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Revise and Rescind changes to BACT limit footnotes from MSS04 |
18 AAC 50.508(6) |
846 |
|
Draft to Super. 09/11/2014 |
In-house |
AQ0058TVP03A |
Hilcorp Alaska, LLC |
Trading Bay |
Application, On Hold |
on hold pending EPA guidance for reclass of CISWI |
2018|02|16 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Initial |
|
79 |
|
|
In-house |
AQ0082MSS04A |
Hilcorp Alaska, LLC |
Valdez Marine Terminal |
Application, On Hold |
On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23) |
2019|02|06 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Revisions to construction permit 082CP05 |
18 AAC 50.508(6) |
1595 |
|
|
In-house |
AQ0082TVP03A |
Hilcorp Alaska, LLC |
Valdez Marine Terminal |
Application, On Hold |
On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23) |
2016|07|14 |
2016|07|14 |
0001|01|01 |
0001|01|01 |
2017|05|31 |
2017|06|30 |
0001|01|01 |
|
Renewal |
|
2532 |
|
Supervisor Review 07/18/2017 |
In-house |
AQ0082TVP03A |
Hilcorp Alaska, LLC |
Valdez Marine Terminal |
Application, On Hold |
On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23) |
2019|02|06 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
|
|
1595 |
|
|
In-house |
AQ0166MSS02A |
Hilcorp North Slope, LLC |
Central Compressor Plant (CCP) |
Application, On Hold |
Permti on hold. EPA rejected proposed footnote revision. |
2013|10|28 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Revision of Terms and Conditions of AQ0166CPT04 |
|
0 |
|
|
In-house |
AQ0166TVP02A |
Hilcorp North Slope, LLC |
Central Compressor Plant (CCP) |
Application, On Hold |
Working RTC and EPA/45 version. Footnote issue. |
2008|03|06 |
2008|05|30 |
0001|01|01 |
2008|07|23 |
2013|09|13 |
2013|10|29 |
2013|09|09 |
|
TVP Renewal |
|
5980 |
|
Public Notice End 10/29/2013 |
In-house |
AQ0167TVP03A |
Hilcorp North Slope, LLC |
Flow Station #1 (FS 1) |
Application, On Hold |
PN draft ready for supervisor review. No further work till the BACT full load issue is resolved.
Footnote issue. |
2017|04|19 |
2017|04|28 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Renewal |
|
2724 |
|
In Completeness Review 04/28/2017 |
In-house |
AQ0170TVP03A |
Hilcorp North Slope, LLC |
Seawater Injection Plant East (SIPE) |
Application, On Hold |
PN draft ready for supervisor review. No further work until the BACT full load issue is resolved. Footnote issue. |
2014|11|12 |
2014|11|12 |
0001|01|01 |
2015|10|23 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Renewal |
|
3623 |
|
Supervisor Review 10/23/2015 |
In-house |
AQ0171TVP01P |
ConocoPhillips Alaska, Inc. |
CPF 3, Kuparuk Central Production Facility #3 |
Application, On Hold |
include in renewal (on hold due to footnote issue) - see review notes |
2018|01|22 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
non-applicability to NSPS Subpart Kb |
|
2456 |
|
|
In-house |
AQ0171TVP02A |
ConocoPhillips Alaska, Inc. |
CPF 3, Kuparuk Central Production Facility #3 |
Application, On Hold |
App Addendum for renewal application received. Footnote issue. |
2007|07|03 |
0001|01|01 |
0001|01|01 |
2010|12|06 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Renewal |
|
6312 |
|
Draft to Super. 12/06/2010 |
In-house |
AQ0172TVP03A |
ConocoPhillips Alaska, Inc. |
Kuparuk Seawater Treatment Plant (STP) |
Application, On Hold |
BACT table contains footnotes on full load. No further work expected till footnote issue is resolved. |
2013|08|29 |
2013|09|20 |
0001|01|01 |
2014|08|28 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
4040 |
|
Draft to Super. 08/28/2014 |
In-house |
AQ0181TVP03A |
Hilcorp Alaska, LLC |
Endicott Production Facility (END) |
Application, On Hold |
BACT table contains footnote on full-load.
|
2017|07|14 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Renewal |
|
2648 |
|
|
In-house |
AQ0182TVP02A |
Hilcorp North Slope, LLC |
Gathering Center #1 (GC 1) |
Application, On Hold |
Footnote issue. |
2008|05|21 |
2009|04|28 |
0001|01|01 |
2011|11|02 |
2012|04|19 |
2012|06|18 |
2012|04|09 |
|
TV Renewal |
|
5647 |
|
Public Notice End 06/18/2012 |
In-house |
AQ0183TVP02A |
Hilcorp North Slope, LLC |
Gathering Center #2 (GC 2) |
Application, On Hold |
Footnote issue. |
2008|05|28 |
0001|01|01 |
0001|01|01 |
2011|11|02 |
2012|04|19 |
2012|06|04 |
2012|04|09 |
|
TV Renewal |
|
5982 |
|
Public Notice End 06/04/2012 |
In-house |
AQ0184TVP02A |
Hilcorp North Slope, LLC |
Gathering Center #3 (GC 3) |
Application, On Hold |
Working PN2 draft. Footnote issue. |
2008|07|01 |
2008|08|07 |
0001|01|01 |
2011|11|02 |
2012|04|19 |
2012|05|21 |
2012|04|09 |
|
TVP Renewal |
|
5911 |
|
Public Notice End 05/21/2012 |
In-house |
AQ0186TVP03P |
Hilcorp North Slope, LLC |
PBU Central Power Station (CPS) |
Application, On Hold |
Application to be withdrawn on or before the effective date of AQ0186TVP04 |
2017|11|03 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Update emissions unit inventory |
|
1502 |
|
|
In-house |
AQ0267TVP01P |
ConocoPhillips Alaska, Inc. |
CPF 1, Kuparuk Central Production Facility #1 |
Application, On Hold |
3.13.23 On hold for footnote issue. |
2019|09|24 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
CPF1 Minor Mod |
|
1846 |
|
|
In-house |
AQ0267TVP02A |
ConocoPhillips Alaska, Inc. |
CPF 1, Kuparuk Central Production Facility #1 |
Application, On Hold |
Submitted EPA objection counter-proposal to CPAI 070314. Awaiting response. Footnote issue. |
2007|11|19 |
0001|01|01 |
0001|01|01 |
2011|06|17 |
2012|11|29 |
2012|12|31 |
2011|06|27 |
|
TV Renewal |
|
6173 |
|
Awaiting Applicant Response 07/03/2014 |
In-house |
AQ0268TVP02A |
Hilcorp North Slope, LLC |
Flow Station #2 (FS 2) |
Application, On Hold |
Withdrawing from EPA/45 to solve PSD BACT. Footnote issue. |
2008|06|11 |
0001|01|01 |
0001|01|01 |
2012|11|30 |
2013|05|20 |
2013|06|19 |
2013|05|08 |
|
TVP renewal |
|
5968 |
|
Awaiting Applicant Response 04/16/2014 |
In-house |
AQ0269TVP02A |
Hilcorp North Slope, LLC |
Flow Station #3 (FS 3) |
Application, On Hold |
Withdrawing from EPA/45 to solve PSD BACT. Footnote issue. |
2007|10|02 |
0001|01|01 |
0001|01|01 |
2009|02|18 |
2013|06|11 |
2013|07|11 |
2013|06|04 |
|
FS #3 TV Renewal |
|
6221 |
|
Awaiting Applicant Response 04/16/2014 |
In-house |
AQ0270MSS02A |
Hilcorp North Slope, LLC |
Central Gas Facility (CGF) |
Application, On Hold |
Permti on hold. EPA rejected proposed footnote revision. |
2013|10|15 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Minor Amendment |
|
0 |
|
|
In-house |
AQ0270TVP02A |
Hilcorp North Slope, LLC |
Central Gas Facility (CGF) |
Application, On Hold |
PN draft sent to JNU admin.
Footnote issue. |
2008|03|06 |
2008|05|06 |
0001|01|01 |
2013|05|17 |
2013|08|29 |
2013|10|15 |
2013|08|27 |
|
TVP Renewal |
|
6004 |
|
Public Notice End 10/15/2013 |
In-house |
AQ0271TVP03A |
Hilcorp North Slope, LLC |
Prudhoe Seawater Treatment Plant |
Application, On Hold |
footnote issue |
2017|04|14 |
2017|04|14 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Renewal |
|
2739 |
|
In Completeness Review 04/14/2017 |
In-house |
AQ0272TVP03A |
Hilcorp North Slope, LLC |
Lisburne Production Center (LPC) |
Application, On Hold |
Sent draft PN permit to supervisor for review 11/1/16. Held up by footnote issues |
2016|08|01 |
2016|08|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Renewal |
|
2995 |
|
In Completeness Review 08/01/2016 |
In-house |
AQ0273TVP01P |
ConocoPhillips Alaska, Inc. |
CPF 2, Kuparuk Central Production Facility #2 |
Application, On Hold |
3.13.23 On hold due to footnote issue |
2018|01|22 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
non-applicability of NSPS Subpart Kb |
|
2456 |
|
|
In-house |
AQ0273TVP02A |
ConocoPhillips Alaska, Inc. |
CPF 2, Kuparuk Central Production Facility #2 |
Application, On Hold |
Footnote issue. |
2007|06|25 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Renewal |
|
6320 |
|
Begin Work 04/04/2008 |
In-house |
AQ0881TVP01A |
Hilcorp Alaska, LLC |
MGS Onshore Facility |
Application, On Hold |
on hold pending EPA guidance for reclass of CISWI
7/12/2021 MWJ: see " Hold Periods (2) Notes" |
2018|02|16 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Initial for incinerator |
|
79 |
|
|
In-house |
AQ1121TVP03A |
Doyon Utilities, LLC |
Fort Wainwright (Privatized Emission Units) |
Application, On Hold |
withdrawn from EPA - permit on hold until we solve the serious SIP issue |
2019|05|03 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2021|04|22 |
2021|05|25 |
0001|01|01 |
|
TVP Renewal |
|
951 |
|
EPA Review End 12/13/2021 |
In-house |
AQ0264TVP03A |
US Air Force (Eielson) |
Eielson Air Force Base |
Boyden, Zachary |
on hold waiting for minor permit application for permit hygiene |
2017|10|16 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Renewal |
|
1870 |
|
|
In-house |
AQ0307MSS05A |
US Air Force, PACAF Regional Support Center |
Eareckson Air Station, Shemya Island |
Boyden, Zachary |
Response to Comments 3/19/24 |
2020|07|28 |
2020|07|28 |
0001|01|01 |
0001|01|01 |
2024|02|15 |
2024|03|18 |
0001|01|01 |
|
Minor Permit Revision |
18 AAC 50.508(6) |
814 |
|
Public Notice End 03/18/2024 |
In-house |
AQ0307TVP04A |
US Air Force, PACAF Regional Support Center |
Eareckson Air Station, Shemya Island |
Boyden, Zachary |
Response to Comments 3/19/24 |
2020|07|28 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2024|02|15 |
2024|03|18 |
0001|01|01 |
|
TV Renewal |
|
1371 |
|
Public Notice End 03/18/2024 |
In-house |
AQ0417TVP04A |
Savant Alaska LLC |
Badami Development Facility |
Boyden, Zachary |
8.6.24 Response to Comments |
2023|03|09 |
2023|03|10 |
0001|01|01 |
0001|01|01 |
2024|07|03 |
2024|08|02 |
0001|01|01 |
|
Renewal |
|
583 |
|
Public Notice End 08/02/2024 |
In-house |
AQ0741TVP04A |
Cook Inlet Energy, LLC |
Kustatan Production Facility |
Boyden, Zachary |
9/17/24 Supervisor Review before EPA |
2021|09|30 |
2021|11|29 |
0001|01|01 |
0001|01|01 |
2024|07|31 |
2024|08|30 |
0001|01|01 |
|
TVP Renewal |
|
1049 |
|
Supervisor Review 09/17/2024 |
In-house |
AQ1071TVP04A |
Missile Defense Agency/DFW |
Fort Greely Missile Defense Complex (See Notes) |
Boyden, Zachary |
Supervisor Review before EPA-45 Day 9/18/24 |
2024|05|07 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2024|08|16 |
2024|09|16 |
0001|01|01 |
|
TVP Renewal |
|
159 |
|
Supervisor Review 09/18/2024 |
In-house |
AQ1661TVP01A |
Oil Search Alaska, LLC, a Subsidiary of Santos Limited |
Nanushuk Operations Pad |
Boyden, Zachary |
Drafting Permit 6/3/24 |
2023|11|10 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Nanushuk Ops Pad - Title V Permit |
|
33 |
|
Awaiting Applicant Response 05/10/2024 |
In-house |
AQ1859MSS01A |
ConocoPhillips Alaska, Inc. |
Willow Central Facility (WCF) |
Boyden, Zachary |
Need update RO |
2024|08|22 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Willow Central Facility (WCF) |
|
52 |
Zachary Boyden |
|
In-house |
AQ0069CPT02A |
Hilcorp Alaska, LLC |
Grayling Platform |
Faber, Scott |
7/29/24 reviewing RFI response |
2023|12|04 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Fuel Gas H2S Increase |
|
314 |
Zachary Boyden |
|
In-house |
AQ0186TVP04A |
Hilcorp North Slope, LLC |
PBU Central Power Station (CPS) |
Faber, Scott |
Supervisor review of response to comments |
2021|08|09 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2024|03|08 |
2024|04|08 |
0001|01|01 |
|
TVP Renewal |
|
1161 |
|
Supervisor Review 06/20/2024 |
In-house |
AQ0200TVP03A |
Hilcorp Alaska, LLC |
Milne Point Production Facility (MPU) |
Faber, Scott |
Addition of NSPS Subpart OOOOa requirements / EPA review |
2017|06|19 |
2017|06|19 |
0001|01|01 |
0001|01|01 |
2019|08|02 |
2019|09|03 |
0001|01|01 |
|
Renewal |
|
2673 |
|
Public Notice End 09/03/2019 |
In-house |
AQ0265TVP04A |
Hilcorp North Slope, LLC |
Crude Oil Topping Unit (COTU) |
Faber, Scott |
Supervisor review of response to comments / EPA review |
2023|07|03 |
2023|07|03 |
0001|01|01 |
0001|01|01 |
2024|07|10 |
2024|08|09 |
0001|01|01 |
|
Crude Oil Topping Unit |
|
468 |
|
Supervisor Review 10/09/2024 |
In-house |
AQ0274TVP03A |
Hilcorp North Slope, LLC |
Prudhoe Bay Operations Center / Main Construction Camp (PBOC/MCC) |
Faber, Scott |
Supervisor review of Response to Comments / EPA review |
2015|06|26 |
2015|06|26 |
0001|01|01 |
0001|01|01 |
2023|08|02 |
2023|09|01 |
0001|01|01 |
|
Renewal |
|
3397 |
|
Supervisor Review 12/08/2023 |
In-house |
AQ0486TVP04A |
Providence Health System |
Providence Alaska Medical Center |
Faber, Scott |
Drafting permit and statement of basis |
2024|01|31 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
256 |
|
|
In-house |
AQ0489TVP03A |
ConocoPhillips Alaska, Inc. |
Alpine Central Processing Facility |
Faber, Scott |
Pre-public notice review / Public notice |
2020|07|31 |
2020|07|31 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TV Renewal |
|
1535 |
|
Supervisor Review 12/08/2022 |
In-house |
AQ0923TVP03A |
Eni US Operating Co. Inc. |
Nikaitchuq Development |
Faber, Scott |
Drafting permit and statement of basis |
2024|07|22 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
83 |
|
|
In-house |
AQ1081TVP04A |
Carlisle Construction Materials dba Insulfoam |
Insulfoam Facility |
Faber, Scott |
8/28/24: EPA 45-day review |
2024|04|05 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2024|07|03 |
2024|08|02 |
0001|01|01 |
|
TVP Renewal |
|
191 |
|
EPA Review End 10/12/2024 |
In-house |
AQ1552TVP01A |
ConocoPhillips Alaska, Inc. |
Doyon 26 Extended Reach Drilling (ERD) Rig |
Jack, Jesse |
|
2024|06|03 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Doyon 26 Drill Rig POGO |
|
132 |
|
|
In-house |
AQ0090TVP04A |
Tesoro Alaska Company, LLC |
Kenai Liquefied Natural Gas (LNG) Plant |
Jones, David |
|
2024|04|23 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
173 |
|
|
In-house |
AQ0094MSS02A |
Hilcorp Alaska, LLC |
Kenai Gas Field 14-6 Pad |
Jones, David |
|
2024|09|16 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
PSD Limit Revision |
|
27 |
|
|
In-house |
AQ0094TVP04P |
Hilcorp Alaska, LLC |
Kenai Gas Field 14-6 Pad |
Jones, David |
|
2024|09|16 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Admin Amendment |
|
27 |
|
|
In-house |
AQ0109MSS01P |
Golden Valley Electric Association |
Zehnder Facility |
Jones, David |
|
2024|08|29 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2024|09|20 |
2024|10|22 |
0001|01|01 |
|
FNSB PM2.5 Serious SIP |
|
45 |
|
Public Notice End 10/22/2024 |
In-house |
AQ0182TVP01P |
Hilcorp North Slope, LLC |
Gathering Center #1 (GC 1) |
Jones, David |
|
2020|06|02 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Minor Modification |
|
860 |
|
|
In-house |
AQ0182TVP01P |
Hilcorp North Slope, LLC |
Gathering Center #1 (GC 1) |
Jones, David |
|
2022|06|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Admin Amendment |
|
0 |
|
|
In-house |
AQ0182TVP01P |
Hilcorp North Slope, LLC |
Gathering Center #1 (GC 1) |
Jones, David |
|
2019|04|23 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Well Pad Disaggregation |
|
1266 |
|
|
In-house |
AQ0183TVP01P |
Hilcorp North Slope, LLC |
Gathering Center #2 (GC 2) |
Jones, David |
*App amendment in attachments 5.19.20 |
2018|12|27 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Minor Modification |
|
1383 |
|
|
In-house |
AQ0183TVP01P |
Hilcorp North Slope, LLC |
Gathering Center #2 (GC 2) |
Jones, David |
|
2022|06|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Admin Amendment |
|
0 |
|
|
In-house |
AQ0184TVP01P |
Hilcorp North Slope, LLC |
Gathering Center #3 (GC 3) |
Jones, David |
|
2022|06|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Admin Amendment |
|
0 |
|
|
In-house |
AQ0184TVP01P |
Hilcorp North Slope, LLC |
Gathering Center #3 (GC 3) |
Jones, David |
App. Received |
2020|06|09 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Minor Modification |
|
853 |
|
|
In-house |
AQ0184TVP01P |
Hilcorp North Slope, LLC |
Gathering Center #3 (GC 3) |
Jones, David |
|
2019|08|14 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Dissagregation of Well Pads |
|
1153 |
|
|
In-house |
AQ0268TVP01P |
Hilcorp North Slope, LLC |
Flow Station #2 (FS 2) |
Jones, David |
|
2022|06|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Admin Amendment |
|
0 |
|
|
In-house |
AQ0270TVP01P |
Hilcorp North Slope, LLC |
Central Gas Facility (CGF) |
Jones, David |
|
2022|06|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Admin Amendment |
|
0 |
|
|
In-house |
AQ0270TVP01P |
Hilcorp North Slope, LLC |
Central Gas Facility (CGF) |
Jones, David |
|
2020|04|21 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Minor Modification |
|
902 |
|
|
In-house |
AQ0316MSS08P |
University of Alaska |
Fairbanks Campus Power Plant |
Jones, David |
|
2024|07|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2024|09|23 |
2024|10|25 |
0001|01|01 |
|
PM2.5 Nonattainment Area BACT Requirements |
|
75 |
|
Public Notice End 10/25/2024 |
In-house |
AQ0316TVP03P |
University of Alaska |
Fairbanks Campus Power Plant |
Jones, David |
|
2024|07|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
PM2.5 Nonattainment Area BACT Requirements |
|
75 |
|
|
In-house |
AQ0009TVP05A |
Hilcorp Alaska, LLC |
Steelhead Platform |
Klina, Joshua |
|
2024|07|24 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
81 |
|
|
In-house |
AQ0067TVP04A |
Hilcorp Alaska, LLC |
Monopod Platform |
Klina, Joshua |
Application Review |
2024|01|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
257 |
|
Awaiting Applicant Response 08/05/2024 |
In-house |
AQ0173TVP04A |
Golden Valley Electric Association |
Healy Power Plant |
Klina, Joshua |
|
2023|06|26 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
475 |
|
|
In-house |
AQ0231MSS04A |
Trident Seafoods |
Akutan Seafood Processing Facility |
Klina, Joshua |
Drafting permit and TAR. |
2022|02|24 |
2022|06|17 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Minor Modification |
18 AAC 50.508(6) |
655 |
|
In Completeness Review 06/17/2022 |
In-house |
AQ0231MSS05A |
Trident Seafoods |
Akutan Seafood Processing Facility |
Klina, Joshua |
|
2024|10|10 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Minor Modification |
|
3 |
Joshua Klina |
|
In-house |
AQ0231TVP05A |
Trident Seafoods |
Akutan Seafood Processing Facility |
Klina, Joshua |
Drafting permit and SOB |
2021|11|17 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TV Renewal |
|
669 |
|
Awaiting Applicant Response 05/02/2024 |
In-house |
AQ0232TVP05A |
Trident Seafoods |
Sand Point Facility |
Klina, Joshua |
|
2024|09|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
13 |
|
|
In-house |
AQ0608ORL02A |
Safety Waste Incineration |
Medical Waste Incinerator, Wasilla |
Klina, Joshua |
Fees paid |
2024|08|23 |
0001|01|01 |
2024|08|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Medical incinerator |
|
51 |
|
|
In-house |
AQ1651MSS02A |
Oil Search Alaska, LLC, a Subsidiary of Santos Limited |
Seawater Treatment Plant |
Klina, Joshua |
|
2024|08|21 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Pikka Development Project |
18 AAC 50.502(c)(3),18 AAC 50.508(5),18 AAC 50.508(6) |
53 |
James Renovatio |
|
In-house |
AQ1854MSS01A |
Hilcorp North Slope, LLC |
Omega Pad |
Klina, Joshua |
Out on PN, to end 9/3/2024 |
2023|12|18 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2024|08|01 |
2024|09|03 |
0001|01|01 |
|
Omega Pad |
18 AAC 50.502(c)(1) |
300 |
Joshua Klina |
Public Notice End 09/03/2024 |
In-house |
AQ0053MSS05A |
Fairbanks Gold Mining Inc |
Fort Knox Mine |
Leibert, Adam |
|
2024|02|13 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Revision Permit Under 18 AAC 50.508(6) |
|
243 |
|
|
In-house |
AQ0053TVP04P |
Fairbanks Gold Mining Inc |
Fort Knox Mine |
Leibert, Adam |
|
2024|05|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
EU Replacements & Reinstatement |
|
165 |
|
|
In-house |
AQ0084TVP05A |
Hilcorp Alaska, LLC |
Platform A |
Leibert, Adam |
|
2023|12|14 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
304 |
|
|
In-house |
AQ0110MSS01P |
Golden Valley Electric Association |
North Pole Power Plant |
Leibert, Adam |
|
2023|12|15 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2024|09|20 |
2024|10|22 |
0001|01|01 |
|
Serious PM2.5 SIP |
|
303 |
David Jones |
Public Notice End 10/22/2024 |
In-house |
AQ0110TVP04P |
Golden Valley Electric Association |
North Pole Power Plant |
Leibert, Adam |
|
2023|12|15 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Serious PM2.5 SIP |
|
303 |
David Jones |
|
In-house |
AQ0290TVP04A |
Teck Alaska, Inc. (Teck) |
Red Dog Mine |
Leibert, Adam |
|
2024|07|23 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
82 |
|
|
In-house |
AQ0315MSS02P |
Aurora Energy LLC |
Chena Power Plant |
Leibert, Adam |
|
2024|07|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2024|09|20 |
2024|10|22 |
0001|01|01 |
|
PM2.5 Nonattainment Area BACT Requirements |
|
75 |
David Jones |
Public Notice End 10/22/2024 |
In-house |
AQ0315TVP05A |
Aurora Energy LLC |
Chena Power Plant |
Leibert, Adam |
|
2024|07|05 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
100 |
|
|
In-house |
AQ0942MSS02P |
Hilcorp Alaska, LLC |
Beluga River Unit |
Leibert, Adam |
|
2024|03|08 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
POGO Project |
18 AAC 50.508(6) |
219 |
Zachary Boyden |
|
In-house |
AQ0942TVP02A |
Hilcorp Alaska, LLC |
Beluga River Unit |
Leibert, Adam |
Public Notice |
2018|07|09 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2024|02|06 |
2024|03|07 |
0001|01|01 |
|
TVP Renewal |
|
451 |
|
Public Notice End 03/07/2024 |
In-house |
AQ0079TVP05A |
Alyeska Pipeline Service Company |
PS #09, TAPS Pump Station |
Rea, Jonathon |
Public Notice ended, comments received |
2024|01|16 |
2024|02|21 |
0001|01|01 |
0001|01|01 |
2024|08|16 |
2024|09|16 |
0001|01|01 |
|
TVP Renewal |
|
228 |
|
Public Notice End 09/16/2024 |
In-house |
AQ0180TVP05A |
Kodiak Electric Association |
Nyman Power Plant |
Rea, Jonathon |
Completeness determination sent; draft started |
2023|12|14 |
2024|02|08 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
248 |
|
In Completeness Review 02/08/2024 |
In-house |
AQ0181MSS10P |
Hilcorp Alaska, LLC |
Endicott Production Facility (END) |
Rea, Jonathon |
pre-PN Prelim draft back from review, cleaning up for PN |
2023|11|07 |
2023|12|20 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
H2S Limit Increase |
18 AAC 50.508(6) |
281 |
James Renovatio |
In Completeness Review 12/20/2023 |
In-house |
AQ0241TVP06A |
Alyeska Seafoods Inc. |
Unalaska Seafood Processing Facility |
Rea, Jonathon |
|
2024|09|04 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
39 |
|
|
In-house |
AQ0353TVP03A |
North Slope Borough |
Kaktovik Power Plant |
Rea, Jonathon |
Drafting Permit |
2024|04|17 |
2024|04|25 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
171 |
|
In Completeness Review 04/25/2024 |
In-house |
AQ1121MSS04P |
Doyon Utilities, LLC |
Fort Wainwright (Privatized Emission Units) |
Rea, Jonathon |
Public Notice Started |
2024|07|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2024|09|23 |
2024|10|25 |
0001|01|01 |
|
PM2.5 Nonattainment Area BACT Requirements |
|
75 |
David Jones |
Public Notice End 10/25/2024 |
In-house |
AQ1616MSS02A |
Peak Gold LLC |
Manh Choh Project (formerly Tetlin) |
Rea, Jonathon |
|
2024|09|26 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Manh Choh Project |
|
17 |
|
|
In-house |
AQ0088TVP05A |
UniSea, Inc. |
Dutch Harbor Seafood Processing Plant |
Saengsudham, Peter |
10/1/2024 Peter S. - Sent to EPA 45-day. Review starts 10/2/2024. |
2021|09|10 |
2023|03|07 |
0001|01|01 |
0001|01|01 |
2024|07|18 |
2024|08|19 |
0001|01|01 |
|
TVP Renewal |
|
558 |
|
EPA Review End 11/14/2024 |
In-house |
AQ0091MSS03P |
Hilcorp Alaska, LLC |
Tyonek Platform |
Saengsudham, Peter |
9/5/2024 Peter S. - Completed technical review by Hilcorp. Begin review of suggested revisions/edits. |
2022|12|21 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Crane Replacement Project |
18 AAC 50.508(6) |
610 |
|
|
In-house |
AQ0091TVP03A |
Hilcorp Alaska, LLC |
Tyonek Platform |
Saengsudham, Peter |
9/5/2024 Peter S. - Completed technical review by Hilcorp. Begin review of suggested revisions/edits. |
2013|09|27 |
2013|10|08 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
3640 |
|
In Completeness Review 10/08/2013 |
In-house |
AQ0221MSS06A |
Cordova Electric Cooperative |
Orca Power Plant |
Saengsudham, Peter |
9/23/24 Peter S. - Application received on 9/20. |
2024|09|20 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Revise MSS05 |
|
23 |
|
|
In-house |
AQ0221TVP05A |
Cordova Electric Cooperative |
Orca Power Plant |
Saengsudham, Peter |
9/23/2024 Peter S. - MSS06 application received. Awaiting Title V addendum. |
2024|06|12 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TV Renewal |
|
123 |
|
|
In-house |
AQ0236MSS03P |
US Army (Fort Wainwright) |
Fort Wainwright |
Saengsudham, Peter |
9/20/24 Peter S. - Out for PN, ends 10/22/24 |
2024|07|30 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
2024|09|20 |
2024|10|22 |
0001|01|01 |
|
PM2.5 Nonattainment Area BACT Requirements |
|
75 |
David Jones |
Public Notice End 10/22/2024 |
In-house |
AQ0272MSS03A |
Hilcorp North Slope, LLC |
Lisburne Production Center (LPC) |
Saengsudham, Peter |
10/1/2024 Peter S. - Addendum with pre-PN technical review received. Reviewing.
|
2024|06|18 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Rich Gas Compressor Project |
18 AAC 50.508(5) |
79 |
|
|
In-house |
AQ0272MSS04A |
Hilcorp North Slope, LLC |
Lisburne Production Center (LPC) |
Saengsudham, Peter |
7/3/24 Peter S. - Initial review of application. |
2024|07|02 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Power Export Project |
18 AAC 50.508(6) |
103 |
James Renovatio |
|
In-house |
AQ0319TVP05A |
City of Saint Paul |
St. Paul Power Plant |
Saengsudham, Peter |
10/4/24 Peter S. - Initial review of application |
2024|09|16 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
27 |
|
|
In-house |
AQ0406TVP03A |
Northern Star (Pogo) LLC |
Pogo Mine |
Saengsudham, Peter |
10/10/24 Peter S. - Pre-PN review received from applicant (10/9/24), reviewing suggested edits. |
2021|12|06 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TV Renewal |
|
1042 |
|
|
In-house |
AQ1328ORL01A |
Mustang Holding LLC |
Mustang Pad |
Saengsudham, Peter |
6/7/24 Peter S. - Final pkg sent for signature. Awaiting signed ORL cover page. Expected signed sometime around end of October/early November. |
2024|02|23 |
2024|03|05 |
2024|02|26 |
0001|01|01 |
2024|04|29 |
2024|05|29 |
0001|01|01 |
|
ORL |
18 AAC 50.225 |
71 |
|
Public Notice End 05/29/2024 |
In-house |
AQ1564TVP01A |
Oil Search Alaska, LLC, a Subsidiary of Santos Limited |
Nanushuk Drillsite B |
Saengsudham, Peter |
9/30/24 Peter S. - Application addendum for Title V to incorporate MSS03 received.
10/2/24 Peter S. - Revisions of AQ1564MSS03 in planning stage. Anticipating pre-application meeting for AQ1564MSS03 Rev. 1. |
2024|02|12 |
2024|04|18 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
Initial TVP |
|
166 |
|
In Completeness Review 04/18/2024 |
In-house |
AQ0110TVP05A |
Golden Valley Electric Association |
North Pole Power Plant |
Unassigned, Permit Application |
|
2024|10|03 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
0001|01|01 |
|
TVP Renewal |
|
10 |
|
|
In-house |