All Applications (115 items)  Show/Hide Results  Excel Download *
ID Owner Stationary Source Permit Writer Current Status/Next Step Received Received Complete Fees Paid Draft to Super Start Public Notice End Public Notice Final to Super Transmit to EPA Project Classification Total Elapsed Days Modeler Processing Status Contract Status
AQ0231TVP05A Trident Seafoods Akutan Seafood Processing Facility Klina, Joshua Awaiting EPA Response. 8/28/2024 2021|11|17 TV Renewal 669 Awaiting Applicant Response 05/02/2024 In-house
AQ0231MSS04A Trident Seafoods Akutan Seafood Processing Facility Klina, Joshua Drafting permit and TAR. 2022|02|24 2022|06|17 Minor Modification 18 AAC 50.508(6) 655 In Completeness Review 06/17/2022 In-house
AQ0231MSS03P Trident Seafoods Akutan Seafood Processing Facility Klina, Joshua Drafting 2024|10|10 Install Rain Cap on EU ID 30 274 Joshua Klina In-house
AQ0489TVP03A ConocoPhillips Alaska, Inc. Alpine Central Processing Facility Faber, Scott Pre-public notice review / Public notice 2020|07|31 2020|07|31 TV Renewal 0 Supervisor Review 12/08/2022 In-house
AQ0062TVP05A Hilcorp Alaska, LLC Anna Platform Rea, Jonathon Reviewing application 2024|10|18 TVP Renewal 266 In-house
AQ0062MSS02A Hilcorp Alaska, LLC Anna Platform Rea, Jonathon Reviewing application 2024|10|18 266 James Renovatio In-house
AQ0208TVP06A Alaska Electric Light & Power Auke Bay Standby Generation Station Faber, Scott Supervisor review / Public notice 2025|02|27 2025|02|27 TVP Renewal 134 In Completeness Review 02/27/2025 In-house
AQ0417TVP04A Savant Alaska LLC Badami Development Facility Boyden, Zachary 10/24/24 On Hold for OOOOb decision 2023|03|09 2023|03|10 2024|07|03 2024|08|02 Renewal 593 Public Notice End 08/02/2024 In-house
AQ0106TVP05A Chugach Electric Association Beluga River Power Plant Faber, Scott Supervisor review / Public notice 2025|01|02 2025|01|02 TVP Renewal 190 Supervisor Review 03/07/2025 In-house
AQ0942TVP02A Hilcorp Alaska, LLC Beluga River Unit Leibert, Adam Public Notice 2018|07|09 2024|02|06 2024|03|07 TVP Renewal 722 Public Notice End 03/07/2024 In-house
AQ0942MSS02P Hilcorp Alaska, LLC Beluga River Unit Leibert, Adam 2024|03|08 POGO Project 18 AAC 50.508(6) 490 Zachary Boyden In-house
AQ0086TVP05A Alaska Electric and Energy Cooperative Bernice Lake Combustion Turbine (BCT) Plant Hasan, Ibnul supervisor's review 2024|12|10 TV Renewal 213 In-house
AQ0064TVP05A Hilcorp Alaska, LLC Bruce Platform Saengsudham, Peter 3/20/25 Peter S. - Informal application complete. Drafting permit. 2025|01|21 2025|03|20 TVP Renewal 113 In Completeness Review 03/20/2025 In-house
AQ0166MSS02A Hilcorp North Slope, LLC Central Compressor Plant (CCP) Application, On Hold Permti on hold. EPA rejected proposed footnote revision. 2013|10|28 Revision of Terms and Conditions of AQ0166CPT04 0 In-house
AQ0166TVP02A Hilcorp North Slope, LLC Central Compressor Plant (CCP) Application, On Hold Working RTC and EPA/45 version. Footnote issue. 2008|03|06 2008|05|30 2008|07|23 2013|09|13 2013|10|29 2013|09|09 TVP Renewal 2230 Public Notice End 10/29/2013 In-house
AQ0166TVP01P Hilcorp North Slope, LLC Central Compressor Plant (CCP) Jones, David On hold - application is related to footnote issue. 2024|11|26 Update Table 5 - Emission Factors 0 In-house
AQ0270TVP01P Hilcorp North Slope, LLC Central Gas Facility (CGF) Jones, David 2020|04|21 Minor Modification 902 In-house
AQ0270TVP01P Hilcorp North Slope, LLC Central Gas Facility (CGF) Jones, David On hold - application is related to footnote issue. 2022|06|30 Admin Amendment 0 In-house
AQ0270TVP02A Hilcorp North Slope, LLC Central Gas Facility (CGF) Application, On Hold PN draft sent to JNU admin. Footnote issue. 2008|03|06 2008|05|06 2013|05|17 2013|08|29 2013|10|15 2013|08|27 TVP Renewal 2254 Public Notice End 10/15/2013 In-house
AQ0270MSS02A Hilcorp North Slope, LLC Central Gas Facility (CGF) Application, On Hold Permti on hold. EPA rejected proposed footnote revision. 2013|10|15 Minor Amendment 0 In-house
AQ0315TVP05A Aurora Energy LLC Chena Power Plant Leibert, Adam 2024|07|05 TVP Renewal 371 In-house
AQ0267TVP02A ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 Faber, Scott 5/7/2025 Updating permit documents 2007|11|19 2011|06|17 2012|11|29 2012|12|31 2011|06|27 TV Renewal 2423 Awaiting Applicant Response 07/03/2014 In-house
AQ0267TVP01P ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 Application, On Hold 3.13.23 On hold for footnote issue. 2019|09|24 CPF1 Minor Mod 2117 In-house
AQ0273TVP01P ConocoPhillips Alaska, Inc. CPF 2, Kuparuk Central Production Facility #2 Application, On Hold 3.13.23 On hold due to footnote issue 2018|01|22 non-applicability of NSPS Subpart Kb 2727 In-house
AQ0273TVP02A ConocoPhillips Alaska, Inc. CPF 2, Kuparuk Central Production Facility #2 Application, On Hold Footnote issue. 2007|06|25 Renewal 2570 Begin Work 04/04/2008 In-house
AQ0171TVP02A ConocoPhillips Alaska, Inc. CPF 3, Kuparuk Central Production Facility #3 Application, On Hold App Addendum for renewal application received. Footnote issue. 2007|07|03 2010|12|06 Renewal 2562 Draft to Super. 12/06/2010 In-house
AQ0171TVP01P ConocoPhillips Alaska, Inc. CPF 3, Kuparuk Central Production Facility #3 Application, On Hold include in renewal (on hold due to footnote issue) - see review notes 2018|01|22 non-applicability to NSPS Subpart Kb 2727 In-house
AQ0265TVP04A Hilcorp North Slope, LLC Crude Oil Topping Unit (COTU) Faber, Scott Supervisor review of response to comments / EPA review 2023|07|03 2023|07|03 2024|07|10 2024|08|09 Crude Oil Topping Unit 739 Supervisor Review 10/09/2024 In-house
AQ0060TVP05A Hilcorp Alaska, LLC Dolly Varden Platform Saengsudham, Peter 6/26/25 Peter S. - First review 2024|10|18 2024|12|17 TVP Renewal 206 Supervisor Review 06/26/2025 In-house
AQ1552TVP01A ConocoPhillips Alaska, Inc. Doyon 26 Extended Reach Drilling (ERD) Rig Renovatio , James 2024|06|03 Doyon 26 Drill Rig POGO 403 In-house
AQ0237TVP04A Doyon Utilities, LLC DU-JBER-Electric, Gas, Drinking Water and Sanitary Services Boyden, Zachary 6/23/25 Permit writing 2025|05|29 TVP Renewal 43 In-house
AQ0264TVP03A US Air Force (Eielson) Eielson Air Force Base Boyden, Zachary 3/24/25 Permit Writing 2017|10|16 Renewal 2010 In-house
AQ0264MSS07A US Air Force (Eielson) Eielson Air Force Base Boyden, Zachary 3/24/25 Permit Writing 2025|02|21 2025 EAFB Minor Permit Rev. 140 In-house
AQ1086TVP02P Matanuska Electric Association, Inc Eklutna Generation Station Rea, Jonathon 2025|05|01 Integrated Review with AQ1086TVP03 Rev 1 71 In-house
AQ1086MSS03P Matanuska Electric Association, Inc Eklutna Generation Station Rea, Jonathon Permit assigned to Engineers. NEXT STEP: Application review. 2025|05|01 Eklutna Generation Station 71 Zachary Boyden In-house
AQ0181TVP03A Hilcorp Alaska, LLC Endicott Production Facility (END) Application, On Hold BACT table contains footnote on full-load. 2017|07|14 Renewal 0 In-house
AQ0167TVP03A Hilcorp North Slope, LLC Flow Station #1 (FS 1) Application, On Hold PN draft ready for supervisor review. No further work till the BACT full load issue is resolved. Footnote issue. 2017|04|19 2017|04|28 Renewal 0 In Completeness Review 04/28/2017 In-house
AQ0268TVP02A Hilcorp North Slope, LLC Flow Station #2 (FS 2) Application, On Hold Withdrawing from EPA/45 to solve PSD BACT. Footnote issue. 2008|06|11 2012|11|30 2013|05|20 2013|06|19 2013|05|08 TVP renewal 2218 Awaiting Applicant Response 04/16/2014 In-house
AQ0268TVP01P Hilcorp North Slope, LLC Flow Station #2 (FS 2) Jones, David 2022|06|30 Admin Amendment 0 In-house
AQ0269TVP01P Hilcorp North Slope, LLC Flow Station #3 (FS 3) Jones, David On hold - application is related to footnote issue. 2024|10|24 Update Table 5 - Emission Factors 0 In-house
AQ0269TVP02A Hilcorp North Slope, LLC Flow Station #3 (FS 3) Application, On Hold Withdrawing from EPA/45 to solve PSD BACT. Footnote issue. 2007|10|02 2009|02|18 2013|06|11 2013|07|11 2013|06|04 FS #3 TV Renewal 2471 Awaiting Applicant Response 04/16/2014 In-house
AQ0238TVP05A US Army (Fort Greely) Fort Greely Real Estate - Garrison Faber, Scott Supervisor review of draft permit. (6/10/2025) 2025|03|06 TVP Renewal 127 Supervisor Review 06/10/2025 In-house
AQ0236TVP05A US Army (Fort Wainwright) Fort Wainwright Rea, Jonathon 2024|12|10 TVP Renewal 213 In-house
AQ1121TVP03A Doyon Utilities, LLC Fort Wainwright (Privatized Emission Units) Application, On Hold withdrawn from EPA - permit on hold until we solve the serious SIP issue 2019|05|03 2021|04|22 2021|05|25 TVP Renewal 951 EPA Review End 12/13/2021 In-house
AQ1524CPT02A 8 Star Alaska LLC Gas Treatment Plant (GTP) Jones, David Application received 2025|02|10 Alaska LNG 151 James Renovatio In-house
AQ0182TVP02A Hilcorp North Slope, LLC Gathering Center #1 (GC 1) Application, On Hold Footnote issue. 2008|05|21 2009|04|28 2011|11|02 2012|04|19 2012|06|18 2012|04|09 TV Renewal 1897 Public Notice End 06/18/2012 In-house
AQ0182TVP01P Hilcorp North Slope, LLC Gathering Center #1 (GC 1) Jones, David 2019|04|23 Well Pad Disaggregation 1266 In-house
AQ0182TVP01P Hilcorp North Slope, LLC Gathering Center #1 (GC 1) Jones, David 2020|06|02 Minor Modification 860 In-house
AQ0182TVP01P Hilcorp North Slope, LLC Gathering Center #1 (GC 1) Jones, David 2022|06|30 Admin Amendment 0 In-house
AQ0183TVP01P Hilcorp North Slope, LLC Gathering Center #2 (GC 2) Jones, David *App amendment in attachments 5.19.20 2018|12|27 Minor Modification 1383 In-house
AQ0183TVP01P Hilcorp North Slope, LLC Gathering Center #2 (GC 2) Jones, David 2022|06|30 Admin Amendment 0 In-house
AQ0183TVP02A Hilcorp North Slope, LLC Gathering Center #2 (GC 2) Application, On Hold Footnote issue. 2008|05|28 2011|11|02 2012|04|19 2012|06|04 2012|04|09 TV Renewal 2232 Public Notice End 06/04/2012 In-house
AQ0184TVP01P Hilcorp North Slope, LLC Gathering Center #3 (GC 3) Jones, David 2019|08|14 Dissagregation of Well Pads 1153 In-house
AQ0184TVP01P Hilcorp North Slope, LLC Gathering Center #3 (GC 3) Jones, David App. Received 2020|06|09 Minor Modification 853 In-house
AQ0184TVP01P Hilcorp North Slope, LLC Gathering Center #3 (GC 3) Jones, David 2022|06|30 Admin Amendment 0 In-house
AQ0184TVP02A Hilcorp North Slope, LLC Gathering Center #3 (GC 3) Application, On Hold Working PN2 draft. Footnote issue. 2008|07|01 2008|08|07 2011|11|02 2012|04|19 2012|05|21 2012|04|09 TVP Renewal 2161 Public Notice End 05/21/2012 In-house
AQ0203TVP05A Chugach Electric Association George Sullivan Plant Two Hasan, Ibnul supervisor's review 2024|12|17 TVP Renewal 206 In-house
AQ0287TVP06A Copper Valley Electric Association Glennallen Diesel Plant Jurado, Victoria Initial staff assignment for completeness review and permit development 2025|06|05 TV Renewal 36 In-house
AQ0066TVP05A Hilcorp Alaska, LLC Granite Point Platform Hasan, Ibnul Started initial drafting 2025|04|16 TVP Renewal 86 In-house
AQ0069CPT02A Hilcorp Alaska, LLC Grayling Platform Faber, Scott 7/29/24 reviewing RFI response 2023|12|04 Fuel Gas H2S Increase 585 Zachary Boyden In-house
AQ0226TVP06A Alaska Power & Telephone Haines Power Generating Station Hasan, Ibnul supervisor's review 2025|01|23 TVP Renewal 169 In-house
AQ0173TVP04A Golden Valley Electric Association Healy Power Plant Klina, Joshua 2023|06|26 TVP Renewal 746 In-house
AQ0173MSS03A Golden Valley Electric Association Healy Power Plant Klina, Joshua 2025|04|03 Healy Power Plant 99 In-house
AQ0353TVP03A North Slope Borough Kaktovik Power Plant Rea, Jonathon Permit draft under review 2024|04|17 2024|04|25 TVP Renewal 365 In Completeness Review 04/25/2024 In-house
AQ0094MSS02A Hilcorp Alaska, LLC Kenai Gas Field 14-6 Pad Jones, David Public Notice 2024|09|16 2025|04|04 2025|06|30 2025|07|30 PSD Avoidance Limit Revision 86 Public Notice End 07/30/2025 In-house
AQ0094TVP04P Hilcorp Alaska, LLC Kenai Gas Field 14-6 Pad Jones, David Public Notice 2024|09|16 2025|04|04 2025|06|30 2025|07|30 Admin Amendment 86 Public Notice End 07/30/2025 In-house
AQ0090TVP04A Tesoro Alaska Company, LLC Kenai Liquefied Natural Gas (LNG) Plant Hirsch, Brian 2024|04|23 TVP Renewal 444 In-house
AQ0035TVP03P Tesoro Alaska Company, LLC Kenai Refinery Saengsudham, Peter Start of EPA 45-day Review 5/29/2025 - Documents uploaded to CDX 2024|11|19 P-719C Engine Replacement 210 EPA Review End 07/14/2025 In-house
AQ0035TVP03P Tesoro Alaska Company, LLC Kenai Refinery Hirsch, Brian 2025|06|24 TVP Revision 3 17 In-house
AQ0172TVP03A ConocoPhillips Alaska, Inc. Kuparuk Seawater Treatment Plant (STP) Application, On Hold BACT table contains footnotes on full load. No further work expected till footnote issue is resolved. 2013|08|29 2013|09|20 2014|08|28 TVP Renewal 291 Draft to Super. 08/28/2014 In-house
AQ0209TVP06A Alaska Electric Light & Power Lemon Creek Standby Generation Station Hasan, Ibnul Public Notice 2025|02|27 2025|06|24 2025|07|24 TVP Renewal 134 Public Notice End 07/24/2025 In-house
AQ1727TVP01A Harvest Alaska, LLC Liquefied Natural Gas (LNG) Facility Prudhoe Bay Unit Unassigned, Permit Application 2025|07|07 Initial TVP 4 In-house
AQ0272TVP03A Hilcorp North Slope, LLC Lisburne Production Center (LPC) Application, On Hold Sent draft PN permit to supervisor for review 11/1/16. Held up by footnote issues 2016|08|01 2016|08|01 Renewal 0 In Completeness Review 08/01/2016 In-house
AQ0272MSS04A Hilcorp North Slope, LLC Lisburne Production Center (LPC) Saengsudham, Peter 7/2/25 Peter S. - First supervisor review 2024|07|02 Power Export Project 18 AAC 50.508(6) 374 James Renovatio Supervisor Review 07/02/2025 In-house
AQ0881TVP01A Hilcorp Alaska, LLC MGS Onshore Facility Application, On Hold on hold pending EPA guidance for reclass of CISWI 7/12/2021 MWJ: see " Hold Periods (2) Notes" 2018|02|16 Initial for incinerator 79 In-house
AQ1527TVP01P Hilcorp Alaska, LLC Milne Point L-Pad Hasan, Ibnul Permit assigned to Engineer. NEXT STEP: Application review. 2025|04|28 Integrated Review with AQ1527MSS03 Rev 1 74 In-house
AQ1527MSS03P Hilcorp Alaska, LLC Milne Point L-Pad Hasan, Ibnul Permit assigned to Engineer. NEXT STEP: Application review. 2025|04|28 Milne Point Unit L-Pad 74 In-house
AQ1559TVP02A Hilcorp Alaska, LLC Milne Point Unit C-Pad Rea, Jonathon 2025|02|10 TVP Renewal 151 In-house
AQ0067TVP04A Hilcorp Alaska, LLC Monopod Platform Klina, Joshua Received comments from Hilcorp for technical review. 2024|01|30 2024|01|30 TVP Renewal 365 In Completeness Review 01/30/2024 In-house
AQ0325MSS03A US Ecology Alaska LLC (Formerly NRC Alaska) Moose Creek Facility Hasan, Ibnul Permit assigned to Engineer. NEXT STEP: Application review. 2025|04|28 Moose Creek Facility 74 In-house
AQ1328ORL01A Mustang Holding LLC Mustang Pad Saengsudham, Peter 4/7/25 Peter S. - Awaiting signed ORL. 5/1/25 Peter S. - Currently under PL2 of annual limit of 500,000 gal (between the C9s and C15s) 2024|02|23 2024|03|05 2024|02|26 2024|04|29 2024|05|29 ORL 18 AAC 50.225 71 Awaiting Applicant Response 03/25/2025 In-house
AQ1564TVP01A Oil Search Alaska, LLC, a Subsidiary of Santos Limited Nanushuk Drillsite B Saengsudham, Peter 12/19/24 Peter S. - Amendment received. Integration of EU IDs 101 and 111. 2024|02|12 2024|04|18 Initial TVP 419 Awaiting Applicant Response 12/03/2024 In-house
AQ1661TVP01A Oil Search Alaska, LLC, a Subsidiary of Santos Limited Nanushuk Operations Pad Boyden, Zachary 6/9/25 Supervisor review 2023|11|10 Nanushuk Ops Pad - Title V Permit 276 Supervisor Review 06/09/2025 In-house
AQ0923TVP03A Hilcorp Alaska, LLC Nikaitchuq Development Faber, Scott Pre-PN technical review 2024|07|22 TVP Renewal 354 Supervisor Review 11/19/2024 In-house
AQ0110TVP05A Golden Valley Electric Association North Pole Power Plant Leibert, Adam 2024|10|03 TVP Renewal 281 In-house
AQ0503TVP04A Hilcorp Alaska, LLC Northstar Production Facility (NOR) Boyden, Zachary Permit writing 7/1/25 2024|12|05 TVP Renewal 218 In-house
AQ0180TVP05A Kodiak Electric Association Nyman Power Plant Rea, Jonathon Out for technical review 2023|12|14 2024|02|08 TVP Renewal 516 In Completeness Review 02/08/2024 In-house
AQ0221TVP05A Cordova Electric Cooperative Orca Power Plant Saengsudham, Peter 6/13/2025 Peter S. - Revising to incorporate MSS06. 2024|06|12 2024|07|26 TV Renewal 350 Supervisor Review 04/03/2025 In-house
AQ0186TVP04A Hilcorp North Slope, LLC PBU Central Power Station (CPS) Faber, Scott Supervisor review of response to comments 2021|08|09 2024|03|08 2024|04|08 TVP Renewal 1432 Supervisor Review 06/20/2024 In-house
AQ0186TVP03P Hilcorp North Slope, LLC PBU Central Power Station (CPS) Application, On Hold Application to be withdrawn on or before the effective date of AQ0186TVP04 2017|11|03 Update emissions unit inventory 1502 In-house
AQ1683TVP01A Oil Search Alaska, LLC, a Subsidiary of Santos Limited Pikka Development Nanushuk Processing Facility (NPF) Klina, Joshua 2024|12|19 Nanushuk Processing Facility 204 In-house
AQ0084TVP05A Hilcorp Alaska, LLC Platform A Leibert, Adam 2023|12|14 TVP Renewal 575 In-house
AQ0486TVP04A Providence Health System Providence Alaska Medical Center Faber, Scott Supervisor review / Public notice 2024|01|31 TVP Renewal 508 Supervisor Review 02/04/2025 In-house
AQ0274TVP03A Hilcorp North Slope, LLC Prudhoe Bay Operations Center / Main Construction Camp (PBOC/MCC) Faber, Scott Supervisor review of Response to Comments / EPA review 2015|06|26 2015|06|26 2023|08|02 2023|09|01 Renewal 0 Supervisor Review 12/08/2023 In-house
AQ0271TVP03A Hilcorp North Slope, LLC Prudhoe Seawater Treatment Plant Application, On Hold footnote issue 2017|04|14 2017|04|14 Renewal 0 In Completeness Review 04/14/2017 In-house
AQ0290TVP04A Teck Alaska, Inc. (Teck) Red Dog Mine Leibert, Adam 2024|07|23 TVP Renewal 353 In-house
AQ0290MSS16A Teck Alaska, Inc. (Teck) Red Dog Mine Boyden, Zachary 6/23/25 Permit writing 2025|05|19 Rescind MI-3 & MD-11 Limits 53 In-house
AQ0232TVP05A Trident Seafoods Sand Point Facility Klina, Joshua Writing pre-PN draft. 2024|09|30 2024|09|30 TVP Renewal 284 In Completeness Review 09/30/2024 In-house
AQ0170TVP03A Hilcorp North Slope, LLC Seawater Injection Plant East (SIPE) Application, On Hold PN draft ready for supervisor review. No further work until the BACT full load issue is resolved. Footnote issue. 2014|11|12 2014|11|12 2015|10|23 Renewal 0 Supervisor Review 10/23/2015 In-house
AQ0210TVP05A Nome Joint Utility System Snake River Power Plant Klina, Joshua 2024|12|23 TVP Renewal 200 In-house
AQ1938MSS01A Hilcorp Alaska, LLC Spurr Platform Unassigned, Permit Application 2025|07|02 Spartan 151 Drilling Project 9 James Renovatio In-house
AQ0319TVP05A City of Saint Paul St. Paul Power Plant Saengsudham, Peter 1/7/25 Peter S. - First draft under review. 3/6/25 Peter S. - Waiting potential addendum for Title V renewal. 2024|09|16 2024|11|05 TVP Renewal 248 Supervisor Review 01/07/2025 In-house
AQ0009MSS05A Hilcorp Alaska, LLC Steelhead Platform Application, On Hold Permit on hold due to BACT footnote issue. 2014|08|19 2014|09|11 Revise and Rescind changes to BACT limit footnotes from MSS04 18 AAC 50.508(6) 846 Draft to Super. 09/11/2014 In-house
AQ0009TVP05A Hilcorp Alaska, LLC Steelhead Platform Klina, Joshua Updating draft after supervisor's review 2024|07|24 2024|07|24 TVP Renewal 352 Awaiting Applicant Response 11/08/2024 In-house
AQ0059TVP04A Hilcorp Alaska, LLC Swanson River Field Jones, David 2025|01|06 TVP Renewal 186 In-house
AQ0058TVP03A Hilcorp Alaska, LLC Trading Bay Application, On Hold on hold pending EPA guidance for reclass of CISWI 2018|02|16 Initial 79 In-house
AQ0091TVP03A Hilcorp Alaska, LLC Tyonek Platform Saengsudham, Peter 5/13/25 Peter S. - Reviewing comments and drafting RTC. 2013|09|27 2013|10|08 2025|04|11 2025|05|12 TVP Renewal 3911 Public Notice End 05/12/2025 In-house
AQ0091MSS03P Hilcorp Alaska, LLC Tyonek Platform Saengsudham, Peter 5/13/25 Peter S. - Reviewing comments and drafting RTC. 2022|12|21 2025|04|11 2025|05|12 Crane Replacement Project 18 AAC 50.508(6) 881 Public Notice End 05/12/2025 In-house
AQ0241TVP06A Westward Seafoods, Inc. Unalaska Seafood Processing Facility Rea, Jonathon Drafting permit 2024|09|04 TVP Renewal 310 In-house
AQ0316TVP03P University of Alaska University of Alaska Fairbanks Campus Jones, David 2024|07|30 PM2.5 Nonattainment Area BACT Requirements 346 In-house
AQ0082TVP03A Alyeska Pipeline Service Company Valdez Marine Terminal Application, On Hold On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23) 2016|07|14 2016|07|14 2017|05|31 2017|06|30 Renewal 2532 Supervisor Review 07/18/2017 In-house
AQ0082TVP03A Alyeska Pipeline Service Company Valdez Marine Terminal Application, On Hold On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23) 2019|02|06 1595 In-house
AQ0082MSS04A Alyeska Pipeline Service Company Valdez Marine Terminal Application, On Hold On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23) 2019|02|06 Revisions to construction permit 082CP05 18 AAC 50.508(6) 1595 In-house
AQ0082MSS06A Alyeska Pipeline Service Company Valdez Marine Terminal Faber, Scott 4/16/2025 Supervisor review of response to comments 2024|10|03 2025|02|20 2025|03|24 Tank Degassing Thermal Oxidizer 18 AAC 50.508(5) 281 Public Notice End 03/24/2025 In-house
AQ1865MSS01P ABC ZZZ 2025|06|18 Test - PTE Calc 23 In-house

Title I Applications Only (23 items)  Show/Hide Results  Excel Download *
Owner Stationary Source ID Project Classification Received Received Complete Fees Paid Total Elapsed Days Start Public Notice End Public Notice Engineer Modeler Processing Status Contract Status Current Status/Next Step
Trident Seafoods Akutan Seafood Processing Facility AQ0231MSS03P Install Rain Cap on EU ID 30 2024|10|10 274 Joshua Klina Joshua Klina In-house Drafting
Hilcorp Alaska, LLC Tyonek Platform AQ0091MSS03P Crane Replacement Project 18 AAC 50.508(6) 2022|12|21 881 2025|04|11 2025|05|12 Peter Saengsudham Public Notice End 5/12/2025 In-house 5/13/25 Peter S. - Reviewing comments and drafting RTC.
Hilcorp North Slope, LLC Central Compressor Plant (CCP) AQ0166MSS02A Revision of Terms and Conditions of AQ0166CPT04 2013|10|28 0 On Hold Application In-house Permti on hold. EPA rejected proposed footnote revision.
Hilcorp North Slope, LLC Central Gas Facility (CGF) AQ0270MSS02A Minor Amendment 2013|10|15 0 On Hold Application In-house Permti on hold. EPA rejected proposed footnote revision.
Hilcorp Alaska, LLC Steelhead Platform AQ0009MSS05A Revise and Rescind changes to BACT limit footnotes from MSS04 18 AAC 50.508(6) 2014|08|19 846 On Hold Application Draft To Super 9/11/2014 In-house Permit on hold due to BACT footnote issue.
Matanuska Electric Association, Inc Eklutna Generation Station AQ1086MSS03P Eklutna Generation Station 2025|05|01 71 Jonathon Rea Zachary Boyden In-house Permit assigned to Engineers. NEXT STEP: Application review.
Alyeska Pipeline Service Company Valdez Marine Terminal AQ0082MSS04A Revisions to construction permit 082CP05 18 AAC 50.508(6) 2019|02|06 1595 On Hold Application In-house On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23)
Hilcorp Alaska, LLC Milne Point L-Pad AQ1527MSS03P Milne Point Unit L-Pad 2025|04|28 74 Ibnul Hasan In-house Permit assigned to Engineer. NEXT STEP: Application review.
Hilcorp Alaska, LLC Beluga River Unit AQ0942MSS02P POGO Project 18 AAC 50.508(6) 2024|03|08 490 Adam Leibert Zachary Boyden In-house
Trident Seafoods Akutan Seafood Processing Facility AQ0231MSS04A Minor Modification 18 AAC 50.508(6) 2022|02|24 2022|06|17 655 Joshua Klina In-house Drafting permit and TAR.
Hilcorp Alaska, LLC Grayling Platform AQ0069CPT02A Fuel Gas H2S Increase 2023|12|04 585 Scott Faber Zachary Boyden In-house 7/29/24 reviewing RFI response
Mustang Holding LLC Mustang Pad AQ1328ORL01A ORL 18 AAC 50.225 2024|02|23 2024|03|05 2024|02|26 77 2024|04|29 2024|05|29 Peter Saengsudham Public Notice End 5/29/2024 In-house 4/7/25 Peter S. - Awaiting signed ORL. 5/1/25 Peter S. - Currently under PL2 of annual limit of 500,000 gal (between the C9s and C15s)
Hilcorp North Slope, LLC Lisburne Production Center (LPC) AQ0272MSS04A Power Export Project 18 AAC 50.508(6) 2024|07|02 374 Peter Saengsudham James Renovatio In-house 7/2/25 Peter S. - First supervisor review
Hilcorp Alaska, LLC Kenai Gas Field 14-6 Pad AQ0094MSS02A PSD Avoidance Limit Revision 2024|09|16 2025|04|04 98 2025|06|30 2025|07|30 David Jones Public Notice End 7/30/2025 In-house Public Notice
Alyeska Pipeline Service Company Valdez Marine Terminal AQ0082MSS06A Tank Degassing Thermal Oxidizer 18 AAC 50.508(5) 2024|10|03 281 2025|02|20 2025|03|24 Scott Faber Public Notice End 3/24/2025 In-house 4/16/2025 Supervisor review of response to comments
Hilcorp Alaska, LLC Anna Platform AQ0062MSS02A 2024|10|18 266 Jonathon Rea James Renovatio In-house Reviewing application
8 Star Alaska LLC Gas Treatment Plant (GTP) AQ1524CPT02A Alaska LNG 2025|02|10 151 David Jones James Renovatio In-house Application received
US Air Force (Eielson) Eielson Air Force Base AQ0264MSS07A 2025 EAFB Minor Permit Rev. 2025|02|21 140 Zachary Boyden In-house 3/24/25 Permit Writing
Golden Valley Electric Association Healy Power Plant AQ0173MSS03A Healy Power Plant 2025|04|03 99 Joshua Klina In-house
US Ecology Alaska LLC (Formerly NRC Alaska) Moose Creek Facility AQ0325MSS03A Moose Creek Facility 2025|04|28 74 Ibnul Hasan In-house Permit assigned to Engineer. NEXT STEP: Application review.
Teck Alaska, Inc. (Teck) Red Dog Mine AQ0290MSS16A Rescind MI-3 & MD-11 Limits 2025|05|19 53 Zachary Boyden In-house 6/23/25 Permit writing
ABC ZZZ AQ1865MSS01P Test - PTE Calc 2025|06|18 23 In-house
Hilcorp Alaska, LLC Spurr Platform AQ1938MSS01A Spartan 151 Drilling Project 2025|07|02 9 Permit Application Unassigned James Renovatio In-house


Title V Applications Only (92 items)  Show/Hide Results  Excel Download *
Source ID ID Owner Stationary Source Received Received Complete Fees Paid Begin Work Draft to Super Start Public Notice End Public Notice Final to Super Transmit to EPA Facility Inspector PRT Assignment Comment
166 AQ0166TVP01P Hilcorp North Slope, LLC Central Compressor Plant (CCP) 2024|11|26 Robert Blume David Jones On hold - application is related to footnote issue.
270 AQ0270TVP01P Hilcorp North Slope, LLC Central Gas Facility (CGF) 2020|04|21 Nicholas Hansen David Jones
270 AQ0270TVP01P Hilcorp North Slope, LLC Central Gas Facility (CGF) 2022|06|30 Nicholas Hansen David Jones On hold - application is related to footnote issue.
268 AQ0268TVP01P Hilcorp North Slope, LLC Flow Station #2 (FS 2) 2022|06|30 Nicholas Hansen David Jones
269 AQ0269TVP01P Hilcorp North Slope, LLC Flow Station #3 (FS 3) 2024|10|24 Nicholas Hansen David Jones On hold - application is related to footnote issue.
182 AQ0182TVP01P Hilcorp North Slope, LLC Gathering Center #1 (GC 1) 2019|04|23 Shane Serrano David Jones
182 AQ0182TVP01P Hilcorp North Slope, LLC Gathering Center #1 (GC 1) 2020|06|02 Shane Serrano David Jones
182 AQ0182TVP01P Hilcorp North Slope, LLC Gathering Center #1 (GC 1) 2022|06|30 Shane Serrano David Jones
183 AQ0183TVP01P Hilcorp North Slope, LLC Gathering Center #2 (GC 2) 2018|12|27 Andrew Mohrmann David Jones *App amendment in attachments 5.19.20
183 AQ0183TVP01P Hilcorp North Slope, LLC Gathering Center #2 (GC 2) 2022|06|30 Andrew Mohrmann David Jones
184 AQ0184TVP01P Hilcorp North Slope, LLC Gathering Center #3 (GC 3) 2019|08|14 Shane Serrano David Jones
184 AQ0184TVP01P Hilcorp North Slope, LLC Gathering Center #3 (GC 3) 2020|06|09 Shane Serrano David Jones App. Received
184 AQ0184TVP01P Hilcorp North Slope, LLC Gathering Center #3 (GC 3) 2022|06|30 Shane Serrano David Jones
267 AQ0267TVP01P ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 2019|09|24 Caitlin Hawthorne On Hold Application 3.13.23 On hold for footnote issue.
273 AQ0273TVP01P ConocoPhillips Alaska, Inc. CPF 2, Kuparuk Central Production Facility #2 2018|01|22 Caitlin Hawthorne On Hold Application 3.13.23 On hold due to footnote issue
171 AQ0171TVP01P ConocoPhillips Alaska, Inc. CPF 3, Kuparuk Central Production Facility #3 2018|01|22 Caitlin Hawthorne On Hold Application include in renewal (on hold due to footnote issue) - see review notes
273 AQ0273TVP02A ConocoPhillips Alaska, Inc. CPF 2, Kuparuk Central Production Facility #2 2007|06|25 2008|04|04 Caitlin Hawthorne On Hold Application Footnote issue.
171 AQ0171TVP02A ConocoPhillips Alaska, Inc. CPF 3, Kuparuk Central Production Facility #3 2007|07|03 2008|04|04 2010|12|06 Caitlin Hawthorne On Hold Application App Addendum for renewal application received. Footnote issue.
269 AQ0269TVP02A Hilcorp North Slope, LLC Flow Station #3 (FS 3) 2007|10|02 2008|06|18 2009|02|18 2013|06|11 2013|07|11 2013|06|04 Nicholas Hansen On Hold Application Withdrawing from EPA/45 to solve PSD BACT. Footnote issue.
267 AQ0267TVP02A ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 2007|11|19 2008|04|04 2011|06|17 2012|11|29 2012|12|31 2011|06|27 Caitlin Hawthorne Scott Faber 5/7/2025 Updating permit documents
166 AQ0166TVP02A Hilcorp North Slope, LLC Central Compressor Plant (CCP) 2008|03|06 2008|05|30 2008|07|23 2013|09|13 2013|10|29 2013|09|09 Robert Blume On Hold Application Working RTC and EPA/45 version. Footnote issue.
270 AQ0270TVP02A Hilcorp North Slope, LLC Central Gas Facility (CGF) 2008|03|06 2008|05|06 2008|05|20 2013|05|17 2013|08|29 2013|10|15 2013|08|27 Nicholas Hansen On Hold Application PN draft sent to JNU admin. Footnote issue.
182 AQ0182TVP02A Hilcorp North Slope, LLC Gathering Center #1 (GC 1) 2008|05|21 2009|04|28 2009|07|29 2011|11|02 2012|04|19 2012|06|18 2012|04|09 Shane Serrano On Hold Application Footnote issue.
183 AQ0183TVP02A Hilcorp North Slope, LLC Gathering Center #2 (GC 2) 2008|05|28 2009|07|29 2011|11|02 2012|04|19 2012|06|04 2012|04|09 Andrew Mohrmann On Hold Application Footnote issue.
268 AQ0268TVP02A Hilcorp North Slope, LLC Flow Station #2 (FS 2) 2008|06|11 2009|08|04 2012|11|30 2013|05|20 2013|06|19 2013|05|08 Nicholas Hansen On Hold Application Withdrawing from EPA/45 to solve PSD BACT. Footnote issue.
184 AQ0184TVP02A Hilcorp North Slope, LLC Gathering Center #3 (GC 3) 2008|07|01 2008|08|07 2009|07|29 2011|11|02 2012|04|19 2012|05|21 2012|04|09 Shane Serrano On Hold Application Working PN2 draft. Footnote issue.
316 AQ0316TVP03P University of Alaska University of Alaska Fairbanks Campus 2024|07|30 Caitlin Hawthorne David Jones
172 AQ0172TVP03A ConocoPhillips Alaska, Inc. Kuparuk Seawater Treatment Plant (STP) 2013|08|29 2013|09|20 2013|10|14 2014|08|28 Caitlin Hawthorne On Hold Application BACT table contains footnotes on full load. No further work expected till footnote issue is resolved.
91 AQ0091TVP03A Hilcorp Alaska, LLC Tyonek Platform 2013|09|27 2013|10|08 2025|04|11 2025|05|12 Andrew Mohrmann Peter Saengsudham 5/13/25 Peter S. - Reviewing comments and drafting RTC.
170 AQ0170TVP03A Hilcorp North Slope, LLC Seawater Injection Plant East (SIPE) 2014|11|12 2014|11|12 2015|08|06 2015|10|23 Samantha Hoover On Hold Application PN draft ready for supervisor review. No further work until the BACT full load issue is resolved. Footnote issue.
186 AQ0186TVP03P Hilcorp North Slope, LLC PBU Central Power Station (CPS) 2017|11|03 Samantha Hoover On Hold Application Application to be withdrawn on or before the effective date of AQ0186TVP04
274 AQ0274TVP03A Hilcorp North Slope, LLC Prudhoe Bay Operations Center / Main Construction Camp (PBOC/MCC) 2015|06|26 2015|06|26 2016|01|14 2023|08|02 2023|09|01 Daniela Fawcett Scott Faber Supervisor review of Response to Comments / EPA review
82 AQ0082TVP03A Alyeska Pipeline Service Company Valdez Marine Terminal 2016|07|14 2016|07|14 2017|05|31 2017|06|30 Breanna Howard On Hold Application On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23)
82 AQ0082TVP03A Alyeska Pipeline Service Company Valdez Marine Terminal 2019|02|06 Breanna Howard On Hold Application On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23)
272 AQ0272TVP03A Hilcorp North Slope, LLC Lisburne Production Center (LPC) 2016|08|01 2016|08|01 Shane Serrano On Hold Application Sent draft PN permit to supervisor for review 11/1/16. Held up by footnote issues
35 AQ0035TVP03P Tesoro Alaska Company, LLC Kenai Refinery 2024|11|19 2025|05|28 Breanna Howard Peter Saengsudham Start of EPA 45-day Review 5/29/2025 - Documents uploaded to CDX
35 AQ0035TVP03P Tesoro Alaska Company, LLC Kenai Refinery 2025|06|24 Breanna Howard Brian Hirsch
271 AQ0271TVP03A Hilcorp North Slope, LLC Prudhoe Seawater Treatment Plant 2017|04|14 2017|04|14 Mandy Leach On Hold Application footnote issue
167 AQ0167TVP03A Hilcorp North Slope, LLC Flow Station #1 (FS 1) 2017|04|19 2017|04|28 Daniela Fawcett On Hold Application PN draft ready for supervisor review. No further work till the BACT full load issue is resolved. Footnote issue.
181 AQ0181TVP03A Hilcorp Alaska, LLC Endicott Production Facility (END) 2017|07|14 Robert Blume On Hold Application BACT table contains footnote on full-load.
264 AQ0264TVP03A US Air Force (Eielson) Eielson Air Force Base 2017|10|16 Elizabeth Chiesa Zachary Boyden 3/24/25 Permit Writing
58 AQ0058TVP03A Hilcorp Alaska, LLC Trading Bay 2018|02|16 Andrew Mohrmann On Hold Application on hold pending EPA guidance for reclass of CISWI
881 AQ0881TVP01A Hilcorp Alaska, LLC MGS Onshore Facility 2018|02|16 Monique Witsel Jacoby On Hold Application on hold pending EPA guidance for reclass of CISWI 7/12/2021 MWJ: see " Hold Periods (2) Notes"
942 AQ0942TVP02A Hilcorp Alaska, LLC Beluga River Unit 2018|07|09 2024|02|06 2024|03|07 Daniela Fawcett Adam Leibert Public Notice
94 AQ0094TVP04P Hilcorp Alaska, LLC Kenai Gas Field 14-6 Pad 2024|09|16 2025|04|04 2025|06|30 2025|07|30 Daniela Fawcett David Jones Public Notice
1527 AQ1527TVP01P Hilcorp Alaska, LLC Milne Point L-Pad 2025|04|28 Breanna Howard Ibnul Hasan Permit assigned to Engineer. NEXT STEP: Application review.
1121 AQ1121TVP03A Doyon Utilities, LLC Fort Wainwright (Privatized Emission Units) 2019|05|03 2021|04|22 2021|05|25 2021|10|29 Mandy Leach On Hold Application withdrawn from EPA - permit on hold until we solve the serious SIP issue
489 AQ0489TVP03A ConocoPhillips Alaska, Inc. Alpine Central Processing Facility 2020|07|31 2020|07|31 Caitlin Hawthorne Scott Faber Pre-public notice review / Public notice
1086 AQ1086TVP02P Matanuska Electric Association, Inc Eklutna Generation Station 2025|05|01 Daniela Fawcett Jonathon Rea
186 AQ0186TVP04A Hilcorp North Slope, LLC PBU Central Power Station (CPS) 2021|08|09 2024|03|08 2024|04|08 Samantha Hoover Scott Faber Supervisor review of response to comments
231 AQ0231TVP05A Trident Seafoods Akutan Seafood Processing Facility 2021|11|17 Rachel McKenna Joshua Klina Awaiting EPA Response. 8/28/2024
417 AQ0417TVP04A Savant Alaska LLC Badami Development Facility 2023|03|09 2023|03|10 2024|07|03 2024|08|02 Breanna Howard Zachary Boyden 10/24/24 On Hold for OOOOb decision
173 AQ0173TVP04A Golden Valley Electric Association Healy Power Plant 2023|06|26 Robert Blume Joshua Klina
265 AQ0265TVP04A Hilcorp North Slope, LLC Crude Oil Topping Unit (COTU) 2023|07|03 2023|07|03 2024|07|10 2024|08|09 Samantha Hoover Scott Faber Supervisor review of response to comments / EPA review
1661 AQ1661TVP01A Oil Search Alaska, LLC, a Subsidiary of Santos Limited Nanushuk Operations Pad 2023|11|10 Robert Blume Zachary Boyden 6/9/25 Supervisor review
180 AQ0180TVP05A Kodiak Electric Association Nyman Power Plant 2023|12|14 2024|02|08 Shane Serrano Jonathon Rea Out for technical review
84 AQ0084TVP05A Hilcorp Alaska, LLC Platform A 2023|12|14 Andrew Mohrmann Adam Leibert
486 AQ0486TVP04A Providence Health System Providence Alaska Medical Center 2024|01|31 Daniela Fawcett Scott Faber Supervisor review / Public notice
67 AQ0067TVP04A Hilcorp Alaska, LLC Monopod Platform 2024|01|30 2024|01|30 Nicholas Hansen Joshua Klina Received comments from Hilcorp for technical review.
1564 AQ1564TVP01A Oil Search Alaska, LLC, a Subsidiary of Santos Limited Nanushuk Drillsite B 2024|02|12 2024|04|18 Robert Blume Peter Saengsudham 12/19/24 Peter S. - Amendment received. Integration of EU IDs 101 and 111.
353 AQ0353TVP03A North Slope Borough Kaktovik Power Plant 2024|04|17 2024|04|25 Elizabeth Chiesa Jonathon Rea Permit draft under review
90 AQ0090TVP04A Tesoro Alaska Company, LLC Kenai Liquefied Natural Gas (LNG) Plant 2024|04|23 Breanna Howard Brian Hirsch
221 AQ0221TVP05A Cordova Electric Cooperative Orca Power Plant 2024|06|12 2024|07|26 Shane Serrano Peter Saengsudham 6/13/2025 Peter S. - Revising to incorporate MSS06.
315 AQ0315TVP05A Aurora Energy LLC Chena Power Plant 2024|07|05 Robert Blume Adam Leibert
923 AQ0923TVP03A Hilcorp Alaska, LLC Nikaitchuq Development 2024|07|22 Mandy Leach Scott Faber Pre-PN technical review
290 AQ0290TVP04A Teck Alaska, Inc. (Teck) Red Dog Mine 2024|07|23 Robert Blume Adam Leibert
9 AQ0009TVP05A Hilcorp Alaska, LLC Steelhead Platform 2024|07|24 2024|07|24 Andrew Mohrmann Joshua Klina Updating draft after supervisor's review
1552 AQ1552TVP01A ConocoPhillips Alaska, Inc. Doyon 26 Extended Reach Drilling (ERD) Rig 2024|06|03 Caitlin Hawthorne James Renovatio
241 AQ0241TVP06A Westward Seafoods, Inc. Unalaska Seafood Processing Facility 2024|09|04 Breanna Howard Jonathon Rea Drafting permit
319 AQ0319TVP05A City of Saint Paul St. Paul Power Plant 2024|09|16 2024|11|05 Daniela Fawcett Peter Saengsudham 1/7/25 Peter S. - First draft under review. 3/6/25 Peter S. - Waiting potential addendum for Title V renewal.
232 AQ0232TVP05A Trident Seafoods Sand Point Facility 2024|09|30 2024|09|30 Andrew Mohrmann Joshua Klina Writing pre-PN draft.
110 AQ0110TVP05A Golden Valley Electric Association North Pole Power Plant 2024|10|03 Caitlin Hawthorne Adam Leibert
62 AQ0062TVP05A Hilcorp Alaska, LLC Anna Platform 2024|10|18 Nicholas Hansen Jonathon Rea Reviewing application
60 AQ0060TVP05A Hilcorp Alaska, LLC Dolly Varden Platform 2024|10|18 2024|12|17 Nicholas Hansen Peter Saengsudham 6/26/25 Peter S. - First review
503 AQ0503TVP04A Hilcorp Alaska, LLC Northstar Production Facility (NOR) 2024|12|05 Robert Blume Zachary Boyden Permit writing 7/1/25
236 AQ0236TVP05A US Army (Fort Wainwright) Fort Wainwright 2024|12|10 Mandy Leach Jonathon Rea
86 AQ0086TVP05A Alaska Electric and Energy Cooperative Bernice Lake Combustion Turbine (BCT) Plant 2024|12|10 Shane Serrano Ibnul Hasan supervisor's review
203 AQ0203TVP05A Chugach Electric Association George Sullivan Plant Two 2024|12|17 Daniela Fawcett Ibnul Hasan supervisor's review
1683 AQ1683TVP01A Oil Search Alaska, LLC, a Subsidiary of Santos Limited Pikka Development Nanushuk Processing Facility (NPF) 2024|12|19 Mandy Leach Joshua Klina
210 AQ0210TVP05A Nome Joint Utility System Snake River Power Plant 2024|12|23 Robert Blume Joshua Klina
106 AQ0106TVP05A Chugach Electric Association Beluga River Power Plant 2025|01|02 2025|01|02 Daniela Fawcett Scott Faber Supervisor review / Public notice
59 AQ0059TVP04A Hilcorp Alaska, LLC Swanson River Field 2025|01|06 Nicholas Hansen David Jones
64 AQ0064TVP05A Hilcorp Alaska, LLC Bruce Platform 2025|01|21 2025|03|20 Andrew Mohrmann Peter Saengsudham 3/20/25 Peter S. - Informal application complete. Drafting permit.
226 AQ0226TVP06A Alaska Power & Telephone Haines Power Generating Station 2025|01|23 Monique Witsel Jacoby Ibnul Hasan supervisor's review
1559 AQ1559TVP02A Hilcorp Alaska, LLC Milne Point Unit C-Pad 2025|02|10 Daniela Fawcett Jonathon Rea
208 AQ0208TVP06A Alaska Electric Light & Power Auke Bay Standby Generation Station 2025|02|27 2025|02|27 Monique Witsel Jacoby Scott Faber Supervisor review / Public notice
209 AQ0209TVP06A Alaska Electric Light & Power Lemon Creek Standby Generation Station 2025|02|27 2025|06|24 2025|07|24 Monique Witsel Jacoby Ibnul Hasan Public Notice
238 AQ0238TVP05A US Army (Fort Greely) Fort Greely Real Estate - Garrison 2025|03|06 Mandy Leach Scott Faber Supervisor review of draft permit. (6/10/2025)
66 AQ0066TVP05A Hilcorp Alaska, LLC Granite Point Platform 2025|04|16 Nicholas Hansen Ibnul Hasan Started initial drafting
237 AQ0237TVP04A Doyon Utilities, LLC DU-JBER-Electric, Gas, Drinking Water and Sanitary Services 2025|05|29 Breanna Howard Zachary Boyden 6/23/25 Permit writing
287 AQ0287TVP06A Copper Valley Electric Association Glennallen Diesel Plant 2025|06|05 Shane Serrano Victoria Jurado Initial staff assignment for completeness review and permit development
1727 AQ1727TVP01A Harvest Alaska, LLC Liquefied Natural Gas (LNG) Facility Prudhoe Bay Unit 2025|07|07 Daniela Fawcett Permit Application Unassigned



*PLEASE NOTE: Download files are in the .xlsx format (Microsoft Office Excel version 2007 and above). If you do not have Office 2007 (or newer), Microsoft offers a free Excel viewer.
Click to search Google for the free Microsoft Excel Viewer (results open in a new window).