Skip to content Skip to content

Site Report: USCG Cape Hinchinbrook Lighthouse

Site Name: USCG Cape Hinchinbrook Lighthouse
Address: Cape Hinchinbrook, SW Corn. Hinchinbrook Is., Cordova, AK 99574
File Number: 2215.38.021
Hazard ID: 2444
Status: Active
Staff: Sophia Bracio, 9074511682 sophia.bracio@alaska.gov
Latitude: 60.237340
Longitude: -146.646650
Horizontal Datum:NAD83

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Numerous fuel spills and leaks, improper disposal of batteries, liquid waste drums, and other items has caused the release of significant levels of metals and petroleum products, especially at the drum and battery sites. POLs, metals, 27 ppm PCBs. These problems are attributed to poor housekeeping of residences since 1974. The Forest Service owns the property and the Coast Guard operates the facility. updated 2/7/2022.

Action Information

Action Date Action Description DEC Staff
4/19/1995 Site Added to Database POLs, metals, 27 ppm PCBs. Mike Krieber
5/2/1995 Preliminary Assessment Approved (Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). Reviewed a preliminary site assessment / summary report. Mike Krieber
11/21/1995 Site Ranked Using the AHRM Initial ranking. Kent Patrick-Riley
4/16/2001 Site Number Identifier Changed Workplan changed from 01 to 09 due to metals and PCBs. Former Staff
3/10/2003 Update or Other Action Reviewed file and database. Sent letter requesting copies of any additional reports, site assessments, work plans, etc. in order to be able to determine current project status for closure or NFA. Donald Seagren
5/12/2004 Update or Other Action After reviewing file, send e-mail requesting project status update. Donald Seagren
5/12/2004 Update or Other Action Requested status update. USCG funding fell through for 04, hoping for funding in 05. Donald Seagren
5/12/2004 Update or Other Action File number assigned and entered into the Fileroom DB and CS DB. Alyce Hughey
10/1/2007 Site Characterization Workplan Approved Limited site characterization workplan approved this date. Samples will be collected in order to gain information to better direct the 2008 Phase III EDDA. Fieldwork will occur this week. Anne Marie Palmieri
3/28/2008 Exposure Tracking Model Ranking Initial ranking with ETM completed. Anne Marie Palmieri
9/2/2008 Site Characterization Workplan Approved Site characterization report approved this date. Soil samples for lead, DRO, PCBs and PAHs will be collected. Anne Marie Palmieri

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details

Requirements

Description Details

There are no documents for this site report.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close