Skip to content Skip to content

Site Report: FIA - Larry's Flying Service - Block 100 Lot 12A

Site Name: FIA - Larry's Flying Service - Block 100 Lot 12A
Address: 3822 University Ave. S.; Block 100, Lot 12A, Fairbanks, AK 99709
File Number: 100.26.201
Hazard ID: 25513
Status: Active
Staff: Livia Bracker, 9072697695 livia.bracker@alaska.gov
Latitude: 64.809460
Longitude: -147.851120
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Two 3,000-gallon underground storage tanks (USTs) (DEC Tank IDs 1 and 2) were removed on August 20, 2009. Tanks were reported to contain aviation gasoline and potentially kerosene at some time. Contamination was found in soil at the bottom of the excavation above cleanup levels for gasoline range organics (GRO) and toluene, however, laboratory analysis used the wrong methods therefore the detection limits were extremely high and exceeded some DEC cleanup levels. The report is incomplete; it is missing sample locations. Sampling for all contaminants of concern per the UST Procedures Manual and soil screening were not performed. The UST Program has requested that a complete site characterization be sent to the Contaminated Sites Program.

Action Information

Action Date Action Description DEC Staff
5/20/2010 Site Added to Database A new site has been added to the database Mitzi Read
5/20/2010 Leaking Underground Storage Tank Release Confirmed - Petroleum LUST site created in CSP database for source area Two 3,000-Gal Avgas USTs - DEC Tank IDs 1 & 2, 78884 Mitzi Read
5/25/2010 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 78884 name: Two 3,000-Gal Avgas USTs - DEC Tank IDs 1 & 2 Mitzi Read
4/14/2011 Update or Other Action DEC requested an update and a status of the work plan for a release investigation that was supposed to be submitted during the summer of 2010 per a meeting with the RP and consultant in May 2010. Tamara Cardona-Marek
8/13/2015 Meeting or Teleconference Held ADEC met with Larry Chenaille of Larry's Flying Service and Fairbanks Airport environmental manager Rebekah Wenger to discuss the requirements at the site. Mr. Chenaille agreed to seek an environmental consultant to help complete the required sampling and cleanup if necessary. Robert Burgess
10/5/2015 Update or Other Action ADEC project manager received a request from Lyle Gresehover of Alaska Resources and Environmental Services to wait until next field season to perform environmental assessment work at the site. ADEC agreed to a date of March 31, 2016 for a work plan describing work to be completed no later than June 30, 2016. Robert Burgess
1/4/2016 Update or Other Action Received work plan for site characterization from Alaska Resources and Environmental Services (ARES). Robert Burgess
3/18/2016 Document, Report, or Work plan Review - other DEC provided comments to the work plan submitted in January. Comments included a request for a groundwater sample and for 10% of samples to be analyzed for lead scavengers per requirements in the Field Sampling Guidance. Robert Burgess
3/31/2016 Leaking Underground Storage Tank Cleanup Initiated - Petroleum Administrative action addition for grant reporting purposes Evonne Reese
4/21/2017 Document, Report, or Work plan Review - other DEC reviewed the Phase 1 environmental assessment report submitted by ARES on behalf of Warbelow's Air. The report establishes known environmental conditions at the site and makes recommendations for characterization and cleanup work as well as property management. Robert Burgess
1/11/2018 Document, Report, or Work plan Review - other Reviewed the Phase II ESA received on November 30, 2017. Provided the contractor (ARES) with recommendations for groundwater characterization at the UST area. Michael Hooper
1/29/2018 Document, Report, or Work plan Review - other Reviewed and approved workplan dated January 19, 2018 for groundwater characterization at the UST area. Mailed letter with workplan approval and recommendations for coordinating with EPA on investigating and closing the hangar floor drains. Michael Hooper
3/21/2018 Offsite Soil or Groundwater Disposal Approved Approved soil and groundwater transport for disposal at OIT. Soil and groundwater waste resulted from recent monitoring well installation. Michael Hooper
5/18/2018 Update or Other Action Received a groundwater monitoring report for work which happened February. Michael Hooper
7/3/2018 Update or Other Action Received amendment to May 18, 2018 groundwater monitoring report with better groundwater flow direction data. Michael Hooper
7/13/2018 Document, Report, or Work plan Review - other Sent letter requesting further delineation of groundwater contamination. Michael Hooper
8/21/2018 Meeting or Teleconference Held Met with RP, contractor, and former leaseholder to discuss groundwater characterization at this site. Michael Hooper
5/15/2019 Document, Report, or Work plan Review - other Reviewed and approved workplan for additional monitoring well installation on the property boundary with installation of a sentinel well on the FIA greenbelt. Michael Hooper
1/7/2020 Site Characterization Report Approved Reviewed groundwater monitoring report and sent letter recommending additional groundwater monitoring on a semi-annual basis. Michael Hooper

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details

Requirements

Description Details

There are no documents for this site report.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close