Site Report: King Salmon AS GW Zone 3 OT029

Site Name: King Salmon AS GW Zone 3 OT029
Address: North/South Bluffs, King Salmon, AK 99613
File Number: 2569.38.017
Hazard ID: 2630
Status: Active
Staff: Ginna Quesada, 9074515960 ginna.quesada@alaska.gov
Latitude: 58.704611
Longitude: -156.679972
Horizontal Datum:

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

OT029 Groundwater Zone 3 has 2 disposal areas known as North and South Bluffs with sporadic low level detections of contaminants in the groundwater, and the White Alice Communications Site (WACS) where PCBs remain in the soil between 1 and 2 mg/kg. Petroleum contaminated groundwater at or slightly above the groundwater cleanup levels has been noted at the White Alice Site; continued investigations are planned. The groundwater zones were established in areas with similar hydrological, geological, geographical, and contamination characteristics, and contain numerous Installation Restoration Program (IRP) sites within each zone. The IRP sites within Zone 3 include: LF005 South Bluff and Landfill #1; LF014 North Bluff; and OT010 White Alice Communication. A Final Record of Decision for the Bluff sites (dated April 2000) was signed by ADEC and the Air Force. AF point of contact: Charley Peyton, Project Manager, 611th CES/CEV 10471 20th Street Suite 338, Elmendorf AFB, AK 99506-2270; Telephone 907-552-9765. Latitude and longitude coordinates represent the approximate GW Zone polygon centroid.

Action Information

Action Date Action Description DEC Staff
9/15/1985 Preliminary Assessment Approved Phase I - Records Search and Site Prioritization Former Staff
6/15/1986 Update or Other Action Phase II - Task I Pre-Survey Report, Shemya Air Force Base and King Salmon Air Force Base Former Staff
6/15/1987 Update or Other Action Installation Restoration Plan, King Salmon Air Station, Stage 1, Final Technical report (dated August 1989) Former Staff
3/15/1988 Update or Other Action Installation Restoration Plan, King Salmon Air Station, Stage 2, Final Draft Technical report (dated October 3, 1990) Former Staff
6/30/1989 Update or Other Action (Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). CH2M Hill stage 2 workplan to assess 4 sites: North and South Barrel Dump Sites; Naknek River; and Eskimo Creek seeps. Remedial investigation and feasibility study occur in parallel. Former Staff
6/30/1989 Update or Other Action (Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). CH2M Hill QA/QC plan for various King Salmon Airport sites; the sites include the Eskimo Creek oil seep, North Barrel Dump, Naknek River seep, and the South Barrel Dump. A total of 17 sites were addressed by this QA/QC plan. Former Staff
8/29/1989 Update or Other Action (Old R:Base Action Code = SI - Site Investigation). CH2M Hill site investigation. The airport was originally constructed in the early 1940s to support the war effort. The airport was turned over to the State of Alaska in 1959. The State continues to operate the site with the Air Force as the major tenant. A White Alice site was activated in 1957. It was deactivated in 1979 and replaced with an Alascom Satellite earth terminal. Only a small portion of the site is owned by the State. The majority is on military land. In 1980, 340 military personnel resided at King Salmon Airport. The north and south barrel dump site, Eskimon Creek Seep and Naknek River seep sites were tested for over 146 constituents of concern. Of these, 39 potential contaminants of concern were identified. High concentrations of TPH were identified in shallow wells and soils at this site. Floating product (>1 foot) was identified at the Eskimo Creek Seepage Site. Lead and petroleum hydrocarbon contamination levels at this site pose a threat to fish and wildlife (page 126). No immediate environmental threat was identified at the Naknek River Seep (page 126). Both the north and south dump sites could pose a threat to fauna since the detection limits used in analyses were greater than the chronic aquatic organism toxicity. Remediation, based on stage 2 sampling, at both barrel dump sites could include: no action; restricting site access; preventing the migration of contaminants. Containment preferred remediation route. The Naknek River and Eskimo Creek seeps will receive further sampling to identify a specific remediation response. In general, based on further sampling results, the alternatives are: no action, which will not occur based on preliminary site investigation; recovery of floating product; treatment of shallow groundwater; excavation of contaminated soils; restrict site access; containment. Former Staff
2/9/1990 Site Added to Database PCBs and petroleum. Former Staff
7/26/1991 Notice of Violation Letter sent to Elmendorf AFB Chief of Environmental Contract and Planning Section. Previously agreed on work not proceeding as scheduled for site assessment and/or remediation. Violations of AS 46.03.710, AS 46.03.740, and numerous violations of multiple sections of Alaska Statutes Title 46. All workplans to be approved prior to any further sampling, clean-up or disposal activities. A written report including timelines to be sent to Manager of Contaminated Sites Ron Klein by 9/1/91 of actions Air Force is planned. The Air Force response letter is dated August 29, 1991. ADEC letter dated September 23, 1991 stated that terms of the NOV dated July 26, 1991 were satisfied. Louis Howard
8/9/1991 Site Number Identifier Changed Old# 90210904003 New# 90250904003 Western district now. Louis Howard
3/15/1992 Update or Other Action Report of Groundwater Monitoring Well Sampling and Analysis (dated July 31, 1992). Louis Howard
7/15/1992 Site Characterization Report Approved Remedial Investigation / Feasibility Study at Eleven Sites, final report (3 volumes, dated September 1993). Louis Howard
9/15/1992 Update or Other Action Comprehensive Site Investigation with September and October groundwater sampling programs. Louis Howard
10/15/1992 Update or Other Action Report of Groundwater Monitoring Well Sampling and Analysis (dated July 1993). Louis Howard
10/15/1992 Update or Other Action Groundwater Monitoring Performed October 1992 (dated April 7, 1993). Louis Howard
11/15/1993 Update or Other Action Supplemental Groundwater Sampling for Pesticide Contamination at North and South Barrel Bluffs LF14 and LF05 (dated April 7, 1994). Louis Howard
12/15/1993 Update or Other Action King Salmon Air Station, Analytical Results: Private Water Wells (dated March 1, 1994). Louis Howard
4/26/1994 Update or Other Action Final Environmental Assessment Drawdown at King Salmon Airport (dated and received in April 1994). Louis Howard
5/15/1994 Update or Other Action King Salmon Air Station, Analytical Results: Private Water Wells verification sampling program. Louis Howard
6/15/1994 Risk Assessment Report Approved Human Health and Ecological Risk Assessment (dated June 1995). FTA #1 and Lower and Upper Naknek Seeps were the only areas which posed a threat to human health. The Ecological Risk Assessment results indicated that chemicals in soil and water posed threats to Eskimo Creek, Refueler Shop, WACs, North/South Bluffs, Upper/Lower Naknek Seeps, and FTA #1. Louis Howard
6/30/1994 Update or Other Action Basewide Groundwater Sampling Program. Louis Howard
7/15/1994 Update or Other Action Trip Report, Groundwater Monitoring Event, King Salmon Air Station, September - October (dated June 14, 1995). This program was designed to supplement previous RI/FS efforts and to complete the RI/FS process on selected sites. In June and July 1994, a groundwater sampling program was initiated in which groundwater sampling of a representative network of base-wide monitoring wells took place. Louis Howard
6/15/1995 Update or Other Action Environmental Assessment, Interim Remedial Action for the North and South Barrel Bluffs. Louis Howard
6/16/1995 Site Ranked Using the AHRM Initial ranking. Action code added because it wasn't when the site was originally ranked. Louis Howard
8/29/1995 Update or Other Action Report, Installation Restoration Program, Remedial Investigation / Feasibility Study at 14 sites, Stage 3 Remedial Investigation studies conducted between October 1993 and December 1994 (final dated August 1995). Based on the results of the RI/FS and remedial actions completed prior to publication of the final RI/FS - the 2 Dry Wells, WACs, WAA#2, Road Oiling, and Landfill Number 2 sites did not require further investigation. Louis Howard
12/15/1995 Update or Other Action Final Engineering Economic Cost Analysis, North and South Barrel Bluffs, King Salmon Airport (dated December 1995). Louis Howard
3/12/1996 Update or Other Action Interim Remedial Action, Final Record of Decision for North and South Barrel, King Salmon Airport, (dated March 1996). Proposed Plan, public meeting and comment period, and draft ROD accomplished in September 1995. Louis Howard
4/18/1996 Update or Other Action Background Sampling at Barrel Bluff Sites, King Salmon Airport (draft dated April 1996, no final received). Louis Howard
6/15/1996 Update or Other Action Final Installation-wide Environmental Baseline Survey. Louis Howard
6/15/1996 Update or Other Action Post Closure Monitoring Report, June/July 1996, North and South Barrel Bluff Sites (dated March 17, 1997). Monitoring included groundwater and surface water quality to establish baseline conditions. 11 monitoring wells and 16 well points were installed. Subsurface soil, surficial sediment, and surface water samples were collected from both bluffs, the adjacent wetlands, and King Salmon Creek during July and July 1996, and again in October 1996. Analytical results from the June/July sampling did not indicate widespread contamination. Similarly, the 2nd sampling round in October 1996 indicated relatively few water quality concerns. Louis Howard
6/15/1996 Update or Other Action Final Human Food Chain, Aquatic Biota, and Wetlands Evaluation workplan. Louis Howard
10/15/1996 Update or Other Action Post Closure Monitoring Report, October 1996, North and South Barrel Bluff Sites (dated March 27, 1997). Monitoring included groundwater and surface water quality to establish baseline conditions. Subsurface soil, surficial sediment, and surface water samples were collected from both bluffs, the adjacent wetlands, and King Salmon Creek during October 1996. Analytical results from the 1st sampling round (June/July 1996) did not indicate widespread contamination. Similarly, this 2nd sampling round in October 1996 indicated relatively few water quality concerns. Louis Howard
10/15/1996 Update or Other Action Final Field Report for Spring 1996, Human Food Chain, Aquatic Biota, and Wetlands Evaluation. Louis Howard
11/15/1996 Update or Other Action Aerial Photographic Analysis, King Salmon Airport Study Area. Prepared by EPA Region 10, Research and Development, Characterization, Research Division, TS-PIC-9710003S, dated November 1996. Gretchen Pikul
12/6/1996 Update or Other Action Community Relations Plan for King Salmon Airport and Naknek Recreation Camps 1 and 2 (draft dated December 1996, final dated May 1997). Gretchen Pikul
12/16/1996 Update or Other Action Three-Party Agreement for North and South Barrel Bluffs signed by EPA, ADEC, and Air Force. Gretchen Pikul
1/15/1997 Update or Other Action Preliminary Report, Human Food Chain, Aquatic Biota, and Wetlands Evaluation. Gretchen Pikul
2/24/1997 Update or Other Action Interim Remedial Action, South Barrel Bluff workplan and associated documents (final dated July 1996 and received on February 24, 1997). Gretchen Pikul
3/13/1997 Update or Other Action (Old R:Base Action Code = RIFS - Remedial Investigation / Feasibility Study). RIFS action added by Shannon and Wilson on 3/13/97, based on Relative Risk Evaluation Worksheet dated 9/8/95. Actual current phase is EE/CA. Pathway: Pathway to extensive wetlands. Contaminants are not reaching the stream. Receptors: Mammals and birds that live or feed in wetlands; also any subsistence user of wetlands. S&W-Miner
3/15/1997 Update or Other Action Feasibility Report (final revised) - dated March 1997. Preferred alternatives were identified for groundwater, wetlands, and soil in each 5 groundwater monitoring zones associated with the main base. Gretchen Pikul
3/20/1997 Update or Other Action King Salmon Wetlands Study Workplan (final dated March 17, 1997). Sampling conducted in Spring and Fall 1997 and 1998. Objective was to assess changes in environmental condition in the wetlands near North and South Barrel Bluffs over time by collecting sediment and surface water samples. Gretchen Pikul
4/7/1997 Update or Other Action Post Closure Monitoring Report, June/July 1996, North and South Barrel Bluff Sites, King Salmon Airport (draft dated November 1996, final dated March 1997, received April 1997). Gretchen Pikul
4/15/1997 Update or Other Action King Salmon Residential Well Sampling Report November 1996 Sampling Event (dated March 1997, received April 1997). Gretchen Pikul
5/6/1997 Update or Other Action Feasibility Study Screening Assessment (draft dated May 1997). Gretchen Pikul
5/29/1997 Update or Other Action Final Post Closure Monitoring Report, October 1996, North and South Barrel Bluff Sites, King Salmon Airport (dated May 1997). Gretchen Pikul
8/5/1997 Update or Other Action Management Action Plan report (draft dated December 1996, received March 1997, final dated June 1997, received August 1997). Gretchen Pikul
8/12/1997 Update or Other Action King Salmon Residential Well Sampling Report May 1997 Sampling Event (dated July 1997, received August 1997). Gretchen Pikul
3/25/1998 Update or Other Action King Salmon Residential Well Sampling Report November 1997 Sampling Event (dated and received March 1998). Gretchen Pikul
4/27/1998 Update or Other Action King Salmon, Naknek and South Naknek Native Villages Site Assessment Report (draft dated March 1998, received April 1998, no final received). Gretchen Pikul
5/13/1998 Update or Other Action Final workplans for Remedial Action at Barrel Bluffs (dated May 23, 1997). Gretchen Pikul
5/14/1998 Update or Other Action Workplan Remedial Action Barrel Bluffs and associated documents (draft dated April 1997, final dated May 1997, received May 1998). Gretchen Pikul
6/10/1998 Update or Other Action Sampling and Analysis Plan, North and South Barrel Bluffs (dated May 1998). Gretchen Pikul
6/10/1998 Update or Other Action Barrel Bluffs Cap Evaluation, King Salmon Airport (draft dated April 1998, final dated June 1998). Gretchen Pikul
7/7/1998 Update or Other Action Sampling Results from North Barrel Bluff (groundwater seep within the wetland near the intersection of the toe road and access road "B"), collection date May 30, 1998. Gretchen Pikul
7/15/1998 Update or Other Action ADEC Factsheet: Overview Environmental Cleanup at a Military Site in King Salmon, Alaska (dated July 1998). Gretchen Pikul
9/4/1998 Update or Other Action King Salmon Residential Well Sampling, August 1997 Sampling Event, Analytical Results and Data Evaluation (dated March 1998, received September 1998). Gretchen Pikul
11/27/1998 Update or Other Action Technical Memorandum Bluffs Monitoring 1998 Event 2, King Salmon Airport, July 27 - July 31, 1998 (received November 1998). Gretchen Pikul
12/2/1998 Update or Other Action Human Food Chain, Aquatic Biota, and Wetlands Evaluations, Technical Report (Volume I - Report Text and Tables, Volume II - Maps, Figures and Photographs, and Volume III - Analytical Laboratory Reports) (draft dated July 1997, final dated November 1998). Gretchen Pikul
1/10/1999 Interim Removal Action Approved Remedial Action Report, Interim Remedial Action for Bluffs, prepared by the Joint Venture (Nugget Construction and Bristol Environmental) Volumes I (text and response to comments), Volume II (photographic journal), Volume III (waste manifests and related disposal documents), Volume IV (field notes and soil compaction testing), Volume V (level II analysis results), Volume VI (chain of custody and analytical results, COC 1-12), Volume VII (chain of custody and analytical results, COC 13-19), Volume VIII (chain of custody and analytical results, COC 20-30, appendices 11-16). Final Remedial Action Report, North Barrel Bluffs (dated January 5, 1999). Gretchen Pikul
2/24/1999 Meeting or Teleconference Held Seattle meeting with trustees on fish study previous results and follow-on workplan. Gretchen Pikul
5/4/1999 Update or Other Action Sampling Results September 1997, King Salmon Wetlands Study (final dated April 1999). Gretchen Pikul
5/4/1999 Update or Other Action Initial Sampling Results June 1997 King Salmon Wetlands Study (dated April 12, 1999). Gretchen Pikul
5/12/1999 Update or Other Action Sampling Results June 1998 King Salmon Wetlands Study (draft dated April 1999). Gretchen Pikul
6/8/1999 Update or Other Action Final Focused Aquatic Biota Sampling workplan (dated May 1999). Gretchen Pikul
7/13/1999 Update or Other Action 1997 Final Monitoring Report North and South Bluffs, Volume 1 Report and Volume 2 (Appendix D Laboratory Analytical Results) draft dated December 1998; final dated June 1999; received July 1999 Gretchen Pikul
7/13/1999 Update or Other Action 1997 Monitoring Report, North and South Bluffs, King Salmon Airport (draft dated December 1998, final dated June 1999 and received July 13, 1999). Gretchen Pikul
7/29/1999 Proposed Plan Proposed Final Action Factsheet, North and South Barrel Bluffs. Gretchen Pikul
8/13/1999 Update or Other Action Sampling and Analysis Plan, North and South Bluffs (draft draft dated May 1998, draft dated May 1999, received June 1999, final dated July 1999, received August 13, 1999). Gretchen Pikul
8/26/1999 Update or Other Action Statistical Analysis of Sampling Events Revision of Post-Closure Monitoring Plan, North and South Bluffs (draft dated March 1999, final dated May 1999, received in August 1999). Gretchen Pikul
11/18/1999 Meeting or Teleconference Held Seattle meeting with trustees on focused fish study results and recommendations on 2000 field season workplan. Gretchen Pikul
12/2/1999 Update or Other Action Response to ADEC Draft Review Comments on King Salmon Wetlands Study, June 1998 Sampling Event; ADEC received on December 1, 1999 and sent out a response memorandum on December 2, 1999. Gretchen Pikul
12/9/1999 Update or Other Action Sampling Results June 1998 King Salmon Wetlands Study (draft dated April 1999; final dated December 9, 1999, received January 18, 2000). Gretchen Pikul
12/27/1999 Update or Other Action Operation, Monitoring and Maintenance Manual, North and South Barrel Bluffs (draft dated March 1999, ADEC comment letter dated April 1999, comment resolution meeting May 1999, draft final dated September 1999, received October 1999, ADEC comment letter dated December 1999). Gretchen Pikul
3/16/2000 Update or Other Action King Salmon Airport Restoration Advisory Board Orientation Manual (final dated April 1999 and received March 16, 2000). Gretchen Pikul
4/15/2000 Long Term Monitoring Established Final Record of Decision - April 2000. South Bluff (LF05) and North Bluff (LF14) decision to continue remedial activities of long-term monitoring of surface water and groundwater, operation, maintenance and monthly monitoring of South Bluff treatment system, monitoring and maintenance of caps, and ICs in land records and Base Master Plan. Gretchen Pikul
4/15/2000 Record of Decision Final Record of Decision - April 2000. South Bluff (LF05) and North Bluff (LF14) decision to continue remedial activities of long-term monitoring of surface water and groundwater, operation, maintenance and monthly monitoring of South Bluff treatment system, monitoring and maintenance of caps, and ICs in land records and Base Master Plan. Gretchen Pikul
7/12/2000 Update or Other Action OT029 Groundwater Zone 3 Operation, Maintenance, and Monitoring South Bluff Treatment System - Technical Report for May 2000 (dated May 2000 and received July 12). Gretchen Pikul
8/18/2000 Update or Other Action OT029 Groundwater Zone 3 Operation, Maintenance, and Monitoring South Bluff Treatment System - Monitoring Report for June 2000 (dated July 24 and received August 18). Gretchen Pikul
8/18/2000 Update or Other Action OT029 Groundwater Zone 3 Operation, Maintenance, and Monitoring South Bluff Treatment System - Monitoring Report for July 2000 (dated August 7 and received August 18). Gretchen Pikul
8/18/2000 Update or Other Action 1999 Monitoring Report, North and South Bluffs (draft dated January 2000; ADEC comment letter dated 2-23-00; final dated June 2000 and received on August 18, 2000. Gretchen Pikul
8/21/2000 Update or Other Action General Plan, 611th Air Support Group, Remote Alaska Sites, Volumes 1, 2, and 3 CD version only (dated March 2000 and received August 21). Portion of Bluffs IC established. Gretchen Pikul
8/21/2000 Update or Other Action General Plan, 611th Air Support Group, Remote Alaska Sites, Volumes 1, 2, and 3 CD version only (dated March 2000 and received August 21). Portion of Bluffs IC established. Gretchen Pikul
10/4/2000 Update or Other Action North and South Bluffs 2000 Monitoring Program workplan (draft dated June and received June 16; ADEC comment letter dated June 30; final dated July 17 and received October 4). Gretchen Pikul
10/4/2000 Update or Other Action Quality Program Plan - Operation, Maintenance and Monitoring of the South Barrel Bluff Treatment System (draft dated April 2000) received April 27, 2000 (final dated July 17, 2000) received October 4, 2000; ADEC comment letter dated May 4, 2000. Gretchen Pikul
10/6/2000 Update or Other Action 1998 Monitoring Report, North and South Bluffs, King Salmon Airport (draft dated April 1999; ADEC comment letter dated 2-23-00; final dated August 2000 and received October 6, 2000). Gretchen Pikul
10/26/2000 Update or Other Action OT029 Groundwater Zone 3 Operation, Maintenance, and Monitoring South Bluff Treatment System - Technical Report for August 2000 (dated September 29 and received October 26). Gretchen Pikul
10/26/2000 Update or Other Action OT029 Groundwater Zone 3 Operation, Maintenance, and Monitoring South Bluff Treatment System - Technical Report for September 2000 (dated October 16 and received October 26). ADEC comment letter for May through September sent on 11-14-00. Gretchen Pikul
11/30/2000 Institutional Control Record Established ICs established and includes notice on land plat with Bristol Bay Borrough and in Base Master Plan for debris/contaminants left in place, and restricted land use of excavation and installation of drinking water wells. Gretchen Pikul
4/25/2001 Meeting or Teleconference Held Meeting with Air Force, ADEC, and EPA at EPA Seattle office - April 23-25, 2001. Gretchen Pikul
5/10/2001 Update or Other Action King Salmon resident Matthew Niedermeyer letter (dated December 12, 2000) addressed to Governor's Office faxed to ADEC on February 12, 2001 for review and comment from several ADEC sections - final response letter from the Governor's Office dated May 10, 2001. Gretchen Pikul
6/27/2001 Update or Other Action Photographic Journal 2000 Monitoring Program (draft dated December 2000, final dated May 2001 and received June 27, 2001). Gretchen Pikul
9/26/2001 Update or Other Action Restoration Advisory Board Pocket Guide and Community Outreach Handbook (ADEC comment letter dated May 30, 2001; final dated September 2001). Gretchen Pikul
10/23/2001 Update or Other Action 2000 Monitoring Report, North and South Bluffs (draft dated February 2001; ADEC comment letter dated March 9, 2001; final received in October 2001). Gretchen Pikul
10/31/2001 Update or Other Action Letter Report - North and South Bluff July/August 2001 Monthly Inspection Report and Summary of July through October 2001 Maintenance Activities (dated October 31, 2001). Gretchen Pikul
11/28/2001 Update or Other Action Remedial Process Optimization Scoping Visit Report - June 26-28, 2001 (no draft received; final received September 26, 2001 - many comments and issues to be resolved; comment resolution meeting during EPA Seattle meetings November 28, 2001). Gretchen Pikul
11/28/2001 Update or Other Action Work Plan - Inspection and Maintenance Activities for North and South Bluffs - 2001 Monitoring Program (draft dated July 2, 2001 and received July 12, 2001; ADEC comment letter dated July 13, 2001; final dated November 28, 2001). Gretchen Pikul
11/29/2001 Meeting or Teleconference Held Meeting with Air Force, ADEC, and EPA at EPA Seattle office - November 26-29, 2001. Gretchen Pikul
12/7/2001 Update or Other Action Letter transmittal - Photographs for North and South Bluffs of August Maintenance Activities (dated November 19, 2001 and received December 7, 2001). Gretchen Pikul
12/13/2001 Update or Other Action Work Plans for 2001 Comprehensive Environmental Monitoring Projects at: North and South Bluffs (Zone 3); Naknek River Storage Area (Zone 4); Rapids Camp (Zone 6); Biovent and AS/SVE Monitoring at 6 Remediation Sites (4 in Zone 2, 1 at RAPCON - FT01, and 1 at MOGAS - SS19); and Soil Biocell Number 7 Cleanup Verification - (drafts dated and received in July 2001; ADEC comment letters dated July 2001; ADEC approval letters dated July and August 2001; final dated November 28, 2001 and received on December 13, 2001). Gretchen Pikul
1/8/2002 Update or Other Action Management Action Plan (draft dated January 2001; ADEC comment letter dated April 3, 2001; response to comments received June 11, 2001; comment resolution meeting on August 29, 2001; final report dated October 2001 and received on January 8, 2002; not all comments documented within the response to comments as being addressed are addressed within the final report; discussions with the Air Force continue on this issue). Gretchen Pikul
5/13/2002 Update or Other Action 2001 Monitoring Report - North and South Bluffs; draft dated January 2002 and received on February 15, 2002; ADEC comment letter dated March 13, 2002; comment resolution meeting on May 13, 2002; final report dated July 2002, 2002 and received on August 26, 2002. Gretchen Pikul
7/17/2002 Meeting or Teleconference Held ADEC participated in the Phase II Remedial Process Optimization (RPO) meetings in King Salmon. Gretchen Pikul
1/28/2003 GIS Position Updated Updated Quadrangle, Latitude, Longitude, Section, Township, and Range fields using TopoZone.com and site maps. Former Staff
2/26/2003 Update or Other Action 2002 Monitoring Report - North and South Bluffs; draft dated and received on February 6, 2003; ADEC comment letter dated February 26, 2003. Gretchen Pikul
5/19/2003 Update or Other Action Work Plans for 2002 Comprehensive Environmental Monitoring Projects at: North and South Bluffs (Groundwater Zone - OT029), Naknek River Storage Area (Groundwater Zone 4 - OT030), Rapids Camp (Groundwater Zone - OT032), Main Base Area (Groundwater Zone - OT027), and Biovent and AS/SVE Monitoring at 6 Remediation Sites (8 draft work plans, ADEC comment letters, Air Force Comment Response, and comment resolution meetings in August and September 2002, Bluffs work plan dated March 2002; finals dated April 30, 2003 and received on May 19, 2003). Gretchen Pikul
5/28/2003 Update or Other Action 2002/2003 Monthly Reports South Bluff Treatment System Volume 1 - monitoring data from September 2002 through January 2003. Gretchen Pikul
6/6/2003 Update or Other Action Transmittal of the King Salmon OT029 Groundwater Zone 3 North and South Bluffs May 2003 Landfill Cap and Security Fence Monthly Inspection Report (dated June 4, 2003 and received on June 16, 2003). Gretchen Pikul
7/3/2003 Update or Other Action 2002 King Salmon Air Station Monitoring Point Inventory CD (dated June 25 and received on July 3, 2003). Gretchen Pikul
9/2/2003 Update or Other Action 2002/2003 Annual Report - Operation, Maintenance, and Monitoring South Bluff Treatment System (Groundwater Zone 3 - OT029) (draft dated June 30, 2003; ADEC approval letter dated August 20; final dated August 25 and received on September 2). Gretchen Pikul
4/5/2004 Update or Other Action 2003 Monitoring Report North Bluff (LF014) and South Bluff (LF005); ADEC received draft on March 23, 2004 (dated March 26); ADEC comment letter dated April 5, 2004. Gretchen Pikul
4/22/2004 Update or Other Action 2003/2004 Work Plan Addendum - Operation, Maintenance, and Monitoring South Bluff Treatment System (Groundwater Zone 3 - OT029) (draft dated and received July 11; ADEC comment letter dated July 28; final received April 22, 2004). Gretchen Pikul
4/22/2004 Update or Other Action Work Plan Addendum, 2003 Monitoring Program - North Bluff (LF014) and South Bluff (LF005) (Groundwater Zone 3 - OT029) (draft dated and received July 11; ADEC comment letter dated July 25; final received April 22, 2004). Gretchen Pikul
4/22/2004 Update or Other Action Field Sampling Plan Addendum 2003 Environmental Restoration Program at Main Base Area (Groundwater Zone 1 - OT027), North and South Bluffs (Groundwater Zone 3 - OT029), Naknek River Storage Area (Groundwater Zone 4 - OT030), Rapids Camp Landfill (Groundwater Zone 6 - OT032), Red Fox Creek (Groundwater Zone 5 - OT031), and Bioventing Operations at Six Remediation Sites (draft dated and received in July 2003; ADEC comment letter dated July 28, 2003; final received April 22, 2004). Gretchen Pikul
4/22/2004 Update or Other Action Quality Assurance Project Plan for Sites: Main Base Area (Groundwater Zone 1 – OT027), North and South Bluffs (Groundwater Zone 3 – OT029), Naknek River Storage Area (Groundwater Zone 4 – OT030), Rapids Camp Landfill (Groundwater Zone 6 – OT032), Red Fox Creek (Groundwater Zone 5 – OT031), and Bioventing Operations at Six Remediation Sites (draft dated July 30 and received August 1, 2003; ADEC conditional approval letter dated Ausut 8, 2003; final received April 22, 2004). Gretchen Pikul
6/8/2004 Update or Other Action Fact Sheet for King Salmon Air Station Environmental Restoration Project; draft fact sheet received and ADEC comments sent on April 16; Air Force Comment Response received on May 25; final dated and received in June 2004. Gretchen Pikul
7/20/2004 Update or Other Action Implementation of Remedial Process Optimization (RPO) Recommendations Work Plan; draft dated and received in June 2004; ADEC comment letter dated June 28, 2004; Comment Response on July 9; comment resolution meeting on July 19; final received on July 20 (some errors are present – see Comment Response in work plan jacket for details). Gretchen Pikul
7/22/2004 Update or Other Action Summer 2004 Environmental Newsletter received on July 22, 2004. Gretchen Pikul
8/10/2004 Update or Other Action 2004 Work Plan and Addendum: 2004 Field Sampling Plan Addendum; draft dated July 30 and received on August 3, 2004; ADEC comment letter dated August 10, 2004; AND 2004 Quality Assurance Project Plan; draft dated July 28, 2004 and received on August 3; ADEC approval letter dated August 9, 2004. Gretchen Pikul
9/13/2004 Update or Other Action King Salmon RPO Field Activities Update -Technical Memorandum, dated and received on September 13, 2004 via e-mail from Manish Joshi (Earth Tech). This memo presents a summary of the field activities completed in July/August 2004, and outlines the upcoming October 2004 field activities. Gretchen Pikul
9/24/2004 Update or Other Action March 2004 Monthly Operations and Maintenance Technical Memo - OT029 Groundwater Zone 3 South Bluff Treatment System; dated September 24, 2004; received September 24, 2004 Jeff Norberg
10/1/2004 Update or Other Action July 2004 Monthly Operations and Maintenance Technical Memo - OT029 Groundwater Zone 3 South Bluff Treatment System; dated September 29, 2004; received October 1, 2004 Jeff Norberg
10/15/2004 Update or Other Action August 2004 Monthly Operations and Maintenance Technical Memo - OT029 Groundwater Zone 3 South Bluff Treatment System; dated October 15, 2004; received October 15, 2004 Jeff Norberg
11/15/2004 Meeting or Teleconference Held Remedial Process Optimization (RPO) team met with Air Force, ADEC, and EPA at at contractor's office in San Antonio TX - November 8-12, 2004. The primary purpose of this meeting was to evaluate the current status of cleanup efforts at the King Salmon AS and draft the RPO report due in March 2005. Jeff Norberg
11/23/2004 Update or Other Action Final 2003-2004 Annual Report Operations, Maintenance, and Monitoring - OT029 Groundwater Zone 3 South Bluff Treatment System; dated October 31, 2004; received November 23, 2004 Jeff Norberg
1/31/2005 Update or Other Action October 2004 Monthly Operations and Maintenance Technical Memo - OT029 Groundwater Zone 3 South Bluff Treatment System; dated January 20, 2005; received January 31, 2005 Jeff Norberg
2/4/2005 Update or Other Action November 2004 Monthly Operations and Maintenance Technical Memo - OT029 Groundwater Zone 3 South Bluff Treatment System; dated January 31, 2005; received February 4, 2005 Jeff Norberg
2/28/2005 Update or Other Action January 2005 and December 2004 Monthly Operations and Maintenance Technical Memo - OT029 Groundwater Zone 3 South Bluff Treatment System; dated February 24, 2005; received February 28, 2005 Jeff Norberg
4/6/2005 Update or Other Action September 2004 Monthly Operations and Maintenance Technical Memo - OT029 Groundwater Zone 3 South Bluff Treatment System; dated April 4, 2005; received April 6, 2005 Jeff Norberg
4/7/2005 Update or Other Action February 2005 Monthly Operations and Maintenance Technical Memo - OT029 Groundwater Zone 3 South Bluff Treatment System; dated April 7, 2005; received April 7, 2005 Jeff Norberg
5/18/2005 Update or Other Action March 2005 Monthly Operations and Maintenance Technical Memo - OT029 Groundwater Zone 3 South Bluff Treatment System; dated May 12, 2005; received May 18, 2005 Jeff Norberg
5/23/2005 Update or Other Action April 2005 Monthly Operations and Maintenance Technical Memo - OT029 Groundwater Zone 3 South Bluff Treatment System; dated May 20, 2005; received May 23, 2005 Jeff Norberg
7/22/2005 Update or Other Action May 2005 Monthly Operations and Maintenance Technical Memo - OT029 Groundwater Zone 3 South Bluff Treatment System; dated July 21, 2005; received July 22, 2005; no exceedences Jeff Norberg
7/27/2005 Update or Other Action 2005 South Bluff Treatment System Mothballing Workplan; received June 15, 2005; ADEC approval letter July 27. Jeff Norberg
10/25/2005 Update or Other Action Work Plan - Inspection and Maintenance Activities for North Bluff (LF014) and South Bluff (LF005) for 2005 Monitoring Program; draft dated June 30, 2005 received July 5; ADEC comment letter Aug 31; comment resolution meeting September 7; ADEC approval letter issued October 25, 2005. Jeff Norberg
10/25/2005 Update or Other Action Field Sampling Plan Addendum - 2005 Environmental Restoration Program; draft dated August 15, 2005 received August 18; ADEC comment letter September 1; comment resolution meeting held September 7; ADEC approval letter issued October 25. Jeff Norberg
10/25/2005 Update or Other Action Quality Assurance Project Plan; draft dated August 31 and received on September 1, 2005; ADEC comment letter dated September 6; response to comment resolution meeting held September 7; ADEC approval letter dated October 25, 2005. Jeff Norberg
11/7/2005 Update or Other Action Post-Closure Operation, Maintenance, and Monitoring Plan for Environmental Restoration Program Sites - North Bluff (LF014) and South Bluff (LF005) Groundwater Zone 3 (OT029); draft dated October 2005 received October 7; ADEC approval letter issued November 7, 2005. Jeff Norberg
6/16/2006 Update or Other Action Implementation of Remedial Process Optimization (RPO) Recommendations Report; draft dated March 2005 received March 30, 2005; ADEC comment letter dated May 16, 2005; Air Force Comment Response and ADEC approval letter issued on May 20, 2005; final dated June 2006 received on June 16, 2006. Jeff Norberg
10/3/2006 Update or Other Action First Five-Year Review – Groundwater Zones 1-4 and 6; draft dated October 2005 received November 8, 2005; ADEC comment letter dated December 7, 2005; revised draft dated January 2006 received January 31, 2006; ADEC comment letter dated July 6; Air Force Comment Response received on August 27; ADEC approval letter dated August 29; Final received October 3, 2006. Jeff Norberg
10/16/2006 Update or Other Action 2005/2006 Annual Report – Operation, Maintenance, and Monitoring South Bluff Treatment System (Groundwater Zone 3 – OT029); draft dated September 12, 2006 received on September 15; ADEC comment and conditional approval letter issued October 3, 2006; Comment Response dated October 6, 2006; Final received October 14. Jeff Norberg
10/19/2006 Update or Other Action Explanation of Significant Difference for Environmental Restoration Program Sites - North Bluff (LF014), South Bluff (LF005), and Groundwater Zone 2 (OT029); draft received June 16, 2005; meeting with Air Force to discuss draft July 25; ADEC comment letter July 27; resolution meetings, draft revisions, and 611th Air Force legal review until Nov 2005; received draft final November 30, 2005; ADEC issued concurrence letter dated December 5, 2005; draft final document submitted to PACAF for review and signature after which final document will be submitted to ADEC for final signature (At last notice ESD is still pending with PACAF). Jeff Norberg
11/1/2006 Update or Other Action 2004/2005 Annual Report – Operation, Maintenance, and Monitoring South Bluff Treatment System (Groundwater Zone 3 – OT029); draft dated June 29, 2005; ADEC Comment letter issued March 1, 2006; Comment Response dated October 13, 2006; ADEC approval letter dated October 25; Final received November 1, 2006. Jeff Norberg
11/13/2006 Update or Other Action 2004 Monitoring Report - North Bluff (LF014) and South Bluff (LF005); draft dated June 10, 2005 received June 14; ADEC comment letter September 2; received Comment Response October 13, 2006; ADEC approval letter issued October 25, 2006; Final dated October 31, 2006 received November 13. Jeff Norberg
1/26/2007 Update or Other Action File number issued 2569.38.017. Melissa Burger
3/9/2007 Update or Other Action September 2006 Quarterly Operations & Maintenance Technical Memo South Bluff Treatment System King Salmon OT029 Groundwater Zone 3, dated March 9, 2007 Jeff Norberg
3/9/2007 Update or Other Action December 2006 Quarterly Operations & Maintenance Technical Memo South Bluff Treatment System King Salmon OT029 Groundwater Zone 3, dated March 9, 2007 Jeff Norberg
6/7/2007 Update or Other Action 2006 Monitoring Report - North Bluff (LF014) and South Bluff (LF005); draft dated June 1, 2007 received June 7; Jeff Norberg
7/10/2007 Update or Other Action March 2007 Quarterly Operations & Maintenance Technical Memo South Bluff Treatment System King Salmon OT029 Groundwater Zone 3, dated July 10, 2007 Jeff Norberg
1/25/2008 Update or Other Action September 2007 Quarterly Operations & Maintenance Technical Memo South Bluff Treatment System King Salmon OT029 Groundwater Zone 3, dated January 15, 2007, recieved on January 22, 2008. Jonathan Schick
4/15/2008 Site Visit ADEC staff conducted a site visit to a large number of pertinent sites at King Salmon Air Station over a 3 day visit. Sites were inspected for any visible evidence of contamination and potential sampling locations. ADEC staff was accompanied to all of the sites by the Project managers from the USAF and thier contractors. A RAB meeting was held during the site visit. Jonathan Schick
4/15/2008 Update or Other Action ADEC staff participated in a Restoration Advisory Board meeting at the King Salmon Air Station. Community members are encouraged to attend and view a presentation of the most recent sampling program where data is available. Main topics discussed were the TCE plume that is in Groundwater Zone 1 where a treatibility study is being conducted to see the possible influence of adding an enhanced in-situ bioremediation product that is engineered to break down chlorinated solvents. The other main topic discussed was the results from the basewide monitoring event at all of the Groundwater Zones from 2007. Jonathan Schick
4/21/2008 Exposure Tracking Model Ranking Initial ranking with ETM completed. Jonathan Schick
10/21/2008 Site Visit ADEC staff took part in a site visit to a number of pertinent sites at King Salmon Air Station over a 2 day visit. Sites, especially the pending Multi Site Inspection sites, were inspected for any visible evidence of contamination and potential sampling locations as the work plans are still being formulated. ADEC staff was accompanied to all of the sites by the Project managers from the USAF and thier contractors. A Restoration Advisory Board meeting was held during the site visit. The topics discussed included the most recent basewide monitoring program, a discussion of the Multi-SIte inspection project, an update on the status of the Groundwater Zone 5 Records of Decision, and a brief discussion concerning the TCE treatibility Study in Groundwater Zone 1. The next RAB meeting has been tentatively scheduled for April 21, 2009. Jonathan Schick
10/22/2008 Document, Report, or Work plan Review - other ADEC recieved a copy of the Draft 2007 Comprehensive Environmental Monitoring Report covering Groundwater Zones 1, 2, 3, 4, and RAPCON and Red Fox Creek. It is dated October 2008 and is under review by the State. Jonathan Schick
4/21/2009 Update or Other Action ADEC staff conducted a site visit to pertinent sites at King Salmon Air Station over a 2 day visit. Sites were inspected for any visible evidence of contamination and to become more familiar with the layout and topography of the area. ADEC staff was accompanied to all of the sites by the Project manager from the USAF and thier contractors. A Restoration Advisory Board meeting was held during the site visit. The topics discussed included the most recent basewide monitoring program, a discussion of the Multi-Site inspection project which is entering Phase II this summer, an update on the status of the Groundwater Zone 5 Records of Decision, and a brief discussion concerning the TCE treatibility Study in Groundwater Zone 1. The next RAB meeting has been tentatively scheduled for October, 2009. Jonathan Schick
10/26/2009 Site Visit ADEC staff traveled to King Salmon with the new RPM for the King Salmon Air Station to tour the sites and look at the excavations that were completed during the 2009 field season. Several sites were inspected and overall the sites appeared to be secured with orange snow fencing and visqueen covering the stockpiles to prevent ponding and migration of contaminants. While in King Salmon staff attended and participated in a Restoration Advisory Board Meeting to meet with the public of King Salmon and discuss the results from the latest round of base-wide sampling and to discuss the progress of the excavations that were conducted during the summer. Jonathan Schick
10/26/2009 Site Visit ADEC staff traveled to King Salmon with the new RPM for the King Salmon Air Station to tour the sites and look at the excavations that were completed during the 2009 field season. Several sites were inspected and overall the sites appeared to be secured with orange snow fencing and visqueen covering the stockpiles to prevent ponding and migration of contaminants. While in King Salmon staff attended and participated in a Restoration Advisory Board Meeting to meet with the public of King Salmon and discuss the results from the latest round of base-wide sampling and to discuss the progress of the excavations that were conducted during the summer. Jonathan Schick
7/28/2010 Update or Other Action ADEC staff recieved the draft versions of the 2009 Long-Term Monitoring Report for the Comprehensive Environmental Monitoring Program for basewide groundwater monitoring. The sample collection and analysis from groundwater, surfacewater and sediment samples from Groundwater Zones 1 through 5. Jonathan Schick
7/28/2010 Update or Other Action ADEC staff recieved the draft versions of the 2009 Long-Term Monitoring Report for the Comprehensive Environmental Monitoring Program for basewide groundwater monitoring. The sample collection and analysis from groundwater, surfacewater and sediment samples from Groundwater Zones 1 through 5. Jonathan Schick
9/8/2010 Update or Other Action ADEC staff submitted comments to the USAF summarizing concerns and edits on the 2009 Comprehensive Environmental Monitoring Report. The report detailed sampling groundwater, surfacewater and sediment at the 5 main groundwater zones at King Salmon Air Station. ADEC's main concerns were regarding the high DRO levels in Groundwater Zone 1 which showed a substantial increase in concentration since the 2008 sampling event, and the differentiation between Remedial Action Objectives as called out in the Records of Decision for these sites and the established ADEC cleanup levels in 18 AAC 75. Jonathan Schick
10/20/2010 Update or Other Action ADEC staff conducted a site visit to pertinent sites at King Salmon Air Station over a 2 day visit. Sites were inspected for any visible evidence of contamination and to observe some of the work that is being conducted to remove POL impacted soils and PCB impacted soils at OT010. ADEC staff was accompanied to all of the sites by the Project manager from the USAF and thier contractors. A Restoration Advisory Board meeting was held during the site visit. The topics discussed included the most recent basewide monitoring program, remedial action cleanup programs, and management of the IDW and soil in the biocells set up to add oxygen to the soil matrix to aid the degradation of the petroleum hydrocarbons. The next RAB meeting is scheduled for April 2011. Jonathan Schick
1/5/2011 Update or Other Action Contaminated Sites Staff recieved the Final Version of the Work Plans for Comprehensive Environemtnal Monitoring across all of the groundwater zones at King Salmon Air Station including RAPCON/Red Fox Creek. Surface water and sediment sampling was scheduled to be conducted in several of the areas of concern as well as the analysis of groundwater samples. The Work Plan is dated August 2010. Jonathan Schick
1/5/2011 Update or Other Action Contaminated Sites Staff recieved the Final Version of the Work Plans for Comprehensive Environemtnal Monitoring across all of the groundwater zones at King Salmon Air Station including RAPCON/Red Fox Creek. Surface water and sediment sampling was scheduled to be conducted in several of the areas of concern as well as the analysis of groundwater samples. The Work Plan is dated August 2010. Jonathan Schick
2/22/2011 Update or Other Action Contaminated Sites Staff recieved a Final Version of the 2009 COmprehensive ENvironmental Monitoring Report covering groundwater and surfacewater sampling from Zones 1 through 5 at King Salmon. Comments on the Draft version were addressed and incorporated in the Final Version. Jonathan Schick
3/31/2011 Document, Report, or Work plan Review - other Contaminated Sites Staff recieved the Draft Report for Comprehensive Environemental Monitoring for all of the groundwater zone sites across King Salmon. The report details the collection and analysis of groundwater and surface water samples all over the King Salmon Airport footprint as related to numerous IRP sites. Jonathan Schick
3/31/2011 Document, Report, or Work plan Review - other Contaminated Sites Staff recieved the Draft version of the 2010 Comprehensive Environmental Monitoring Report for groundwater and surface water sampling at all of the zones at the King Salmon Air Station. The report was dated March 2011. Jonathan Schick
4/14/2011 Update or Other Action Contaminated Sites Staff recieved a Draft Work Plan for Well Decommissioning and Repair at all of the Groundwater Zones at King Salmon. Jonathan Schick
5/9/2011 Update or Other Action Contaminated Sites Staff submitted a comment letter to the USAF regarding the Draft Work Plan for Monitoring Well Decommissioning and Repair at all of the Groundwater Zones in King Salmon. Our main concerns were regarding improving the protectiveness of the decontamination of the equipment between wells to prevent cross contamination. Also regarding the treatment and disposal of any investigation derived waste water including the water generated during the decontamination of equipment. Jonathan Schick
5/25/2011 Update or Other Action ADEC Contaminated Sites Staff recieved the Draft WOrk Plans for 2011 Comprehensive Environmental Monitoring Projects for Groundwater Zones 1 through 4 and inclding RAPCON and Red Fox Creek sites. Jonathan Schick
5/25/2011 Update or Other Action ADEC Contaminated Sites Staff recieved the Draft WOrk Plans for 2011 Comprehensive Environmental Monitoring Projects for Groundwater Zones 1 through 4 and inclding RAPCON and Red Fox Creek sites. Jonathan Schick
5/25/2011 Update or Other Action ADEC Contaminated Sites Staff recieved the Draft WOrk Plans for 2011 Comprehensive Environmental Monitoring Projects for Groundwater Zones 1 through 4 and inclding RAPCON and Red Fox Creek sites. Jonathan Schick
5/25/2011 Document, Report, or Work plan Review - other Contaminated Sites Staff recieved the March 2011 Quartely Monitoring Letter Report for the South Bluffs Treatment System at King Salmon dated May 12, 2011. The report details the monitoring from the third quarter operation of the treatment systemfor the 2010 contract year. The samples were analyzed for a wide range of contaminants and DRO, Barium Silver and Iron were detected, all below regulatory limits for the site. Jonathan Schick
6/6/2011 Update or Other Action Contaminated Sites Staff submitted comments to the US Air Force Remedial Project Manager regarding the 2011 Work plans for Comprehensive Environmental Monitoring Projects for Groundwater Zones 1-4 and RAPCON and Red Fox Creek. Our concerns were regarding several drums that have been stored within the bioremediation cells and also the need for an Explanation of Significant Differences for the South Bluffs Treatment System. Jonathan Schick
6/23/2011 Update or Other Action Contaminated Sites Staff recieved the Final Version of the Work Plan for Monitoring Well Decommissioning and Repair for all sites across King Salmon Air Station. The Comments from the Draft Version of the Plan were addressed in the response to comments and in the Final Version of the document. Jonathan Schick
6/23/2011 Update or Other Action Contaminated Sites Staff recieved the Final Version of the Work Plan for Monitoring Well Decommissioning and Repair for all sites across King Salmon Air Station. The Comments from the Draft Version of the Plan were addressed in the response to comments and in the Final Version of the document. Jonathan Schick
8/26/2011 Document, Report, or Work plan Review - other Contaminated Sites Staff recieved a FInal version of the Monitoring Well Decommissioning and Repair Report for King Salmon. The report detailed the monitoring wells throughout the King Salmon area that were either decommissioned and removed, or repaired for future work. Jonathan Schick
11/3/2011 Document, Report, or Work plan Review - other Contaminated Sites Staff submitted a comment letter to the Air Force's Remedial Project Manager with comments on the Draft 2010 Comprehensive Environmental Monitoring Projects. The comments were in regards to the need to complete Five-Year Reviews for several of the Groundwater Zones thus requiring a large scale review of the data from all of these sites from the past 5 years and beyond. Other comments were regarding the report's presentation of some histroic data and the concern about the exceedance of iron in the surface water at the South Bluffs Treatment facility. Jonathan Schick
11/3/2011 Document, Report, or Work plan Review - other Contamianted Sites Staff submitted comments to the US Air Force Remedial Project Manager on the Draft 2010 Comprehensive Environmental Monitoring Report. The report covered the groundwater and surface water sampling at each of the 5 groundwater zones at King Salmon Air Station. THe main issues with the report was the inconsistencies with the work plan regarding the number and location of wells to sample. Jonathan Schick
12/4/2011 Document, Report, or Work plan Review - other Contaminated Sites Staff recieved Responses to our comments on the Draft 2010 Comprehensive Environmental Monitoring Report for the 5 groundwater zones at King Salmon. The majority of the responses were acceptable but there were several technical issues that will still need to be resolved before the report can be finalized. Jonathan Schick
12/4/2011 Update or Other Action Contaminated Sites Staff recieved responses to our comments from November 3 and a revised Final Version of the 2010 Comprehensive Environmental Monitoring Report. The responses were not adequate and further review of the comments and the document are required. Jonathan Schick
12/9/2011 Document, Report, or Work plan Review - other Contaminated Sites Staff submitted a letter to the Air Force's Remedial Project manager with regards to the responses to our comments on the 2010 Comprehensive Environmental Monitoring Report. The responses did not address ADEC's concerns about the need for 5-Year Reviews for several of the sites, or our concern about the elevated levels of iron in the surface water at the South Bluffs Treatment Facility. Jonathan Schick
12/9/2011 Document, Report, or Work plan Review - other Contaminated Sites Staff submitted a letter to the US Air Force Remedial Project Manager regarding the remaining technical issues with the Draft 2010 Comprehensive Environmental Monitoring Report. The issues should be amended before the report can be finalized. Jonathan Schick
1/19/2012 Document, Report, or Work plan Review - other Contaminated Sites Staff recieved a revised version of the 2010 Comprehensive Environmental Monitoring Report. The revisions incorporated the requested amendments from the draft and the report should be finalized. Jonathan Schick
3/20/2012 Document, Report, or Work plan Review - other Contaminated Sites Staff recieved the Draft Work Plan for Preliminary Assessments/Site Inspections for Cape Newenham, Cape Lisburne, Indian Mountain, Tatalina LRRS, and King Salmon Air Station. Jonathan Schick
4/3/2012 Meeting or Teleconference Held Contaminated Sites Staff met with members of the Remedial Project team from the US Air Force and their consultants and discussed the comments on the Draft Work Plan for Preliminary Assessments/Site Inspections for Cape Newenham, Cape Lisburne, Indian Mountain, Tatalina LRRS, Eareckson Air Station, and King Salmon Air Station. The main concerns were that the work plans were developed without input on the scope of work from the regulator and that the limited scope did not allow for sampling of the necessary constituents to properly characterize sites where fuels were not the only concern. Jonathan Schick
5/14/2012 Document, Report, or Work plan Review - other Contaminated Sites Staff recieved the Final versions of the Work Plan for Preliminary Assessments/Site Inspections for Cape Newenham, Cape Lisburne, Indian Mountain, Tatalina LRRS, and King Salmon Air Station. Jonathan Schick
5/24/2012 Document, Report, or Work plan Review - other Contaminated Sites Staff recieved the Final Version of the 2010 Comprehensive Environmental Monitoring Report dated May 2012 for King Salmon Air Station that covers the groundwater and surface water monitoring at each of the 5 groundwater zones at the Air Station. Jonathan Schick
9/4/2013 Document, Report, or Work plan Review - other Submit approval letter to US Air Force for "Final Work Plans 2013 Comprehensive Environmental Monitoring” King Salmon Airport, Alaska. The Final work plans identify the groundwater monitoring and Institutional Control monitoring requirements for Groundwater Zones 1, 2, 3, 4, 5, 6, and 7. Sampling is scheduled to begin this week. The plan identifies annual inspection and maintenance activities that need to be conducted at the north and south bluffs landfill. The report documents the reduction in sample frequency to coincide with the next 5-year review. Guy Warren
9/17/2013 Document, Report, or Work plan Review - other Submit approval letter to US Air Force for the Final 2012 Comprehensive Environmental Monitoring Report for King Salmon Airport. Project activities for Zone 3 included ground water and surface water sampling. Sample results were consistent with last year. Recommendations for Zone 3 include reducing sample frequency at the South Bluff Treatment System (SBTS), reduce monitoring frequency at several wells, discontinuation of sampling at individual residence, and addition of IC inspections. Discontinuation of sampling is appropriate as sample results have not exceeded end point criteria since 2004. Guy Warren
3/20/2014 CERCLA ROD Periodic Review Received Final "Second Five Year Review for Groundwater Zones 2, 3, and 4". Three issues were identified for Zone 3. Issues will be addressed in upcoming CEM work plan. Guy Warren
7/10/2014 Update or Other Action Submit approval letter to US Air Force for the Final 2013 Comprehensive Environmental Monitoring Report for King Salmon Airport. Project activities for Zone 3 included annual inspection of "slopes, vegetation, erosion-control features, culverts, down-drains, toe roads, and access roads" for the North and South Bluff, snow-fence repair, and Institutional Control Inspections. Some minor maintenance was performed. Additional repairs are required to re-align several gabions located along King Salmon Creek. Guy Warren
8/28/2014 Document, Report, or Work plan Review - other Submit approval letter to US Air Force for "Final Work Plans 2014 Comprehensive Environmental Monitoring” King Salmon Airport, Alaska. The Final work plans identify the groundwater monitoring and Institutional Control monitoring requirements for Groundwater Zones 1, 2, 3, 4, 5, 6, and 7 as well as maintenance at the bio-cells. The plan identifies annual inspection and maintenance activities that need to be conducted at the north and south bluffs landfill and inspection and maintenance of the SBTS (all part of GW Zone 3). Sampling of 4 monitoring wells, 6 well points, and surface water is also included for GW Zone 3. Guy Warren
2/10/2016 Document, Report, or Work plan Review - other Submit approval letter for Final 2014 Long Term Monitoring Report for King Salmon Divert. Groundwater and surface water samples were collected from multiple locations. An IC inspection was conducted. Sampling has been reduced to once every 5 years to coincide with the five year review. Guy Warren
4/11/2016 Update or Other Action Submit approval letter for Final 2015 Long Term Monitoring Report for King Salmon Divert. Groundwater, surface water and treatment system samples were collected from multiple locations and an IC inspection was conducted. Although sampling was reduced to once every five years in 2014, sampling was conducted in 2015. One South Bluff well point exceeded the ADEC cleanup criteria for the pesticide Aldrin in the primary sample, but was not detected in the duplicate sample. Pesticides will be sampled at monitoring well SWP-10 in 2016; all other wells and parameters will be measured in 2019. Guy Warren
12/15/2016 Update or Other Action The AF is currently preparing an ESD for Zone 3. The draft document is presently in USAF legal review and should be provided to ADEC in the near future. Holly Weiss-Racine
2/17/2017 Update or Other Action RA-Operations & GW Monitoring report draft received for review and comment. Samples were also analyzed for VOCs, pesticides, PCBs, lead, and total organic carbon. All the samples were ND for pesticides and PCBs. TOC ranged from 5.4-9.0 mg/L. One sample was collected from the South Bluff Treatment System lift station in November after the pumps were replaced. GRO was detected in the sample (0.016 mg/L) as well as the trip blank (0.017 mg/L. There were no observations of drinking water wells or excavations out of compliance with institutional controls. See site file for additional information. Louis Howard
3/13/2017 Document, Report, or Work plan Review - other Staff provided comments on the RA-O LTM report. Text references Draft and Unsigned RODs. These are not official documents and all references should be removed. Please remove references to Draft and Unsigned RODs, reference default ADEC cleanup levels and include information on the forthcoming RODs for Zones 3, 5, and 7. Section 1.10 Typo at the end of the second to last sentence in first paragraph. “…and the Quality Assurance Project Plan (QAPP) (Paug-Vik, 2005.” Add end parenthesis after year. Is 2005 the last time the QAPP was updated for this project? I did not see a QAPP that was attached to the 2015 LTM work plans. If in fact this is the last QAPP update it will need to be updated and included with the 2016 LTM work plans. Section 4.0 Include information about the forthcoming ROD for Zone 3. Section 4.5 Please revise recommendation to begin planning for repair/replacement of the gabions. It is hard to evaluate since no photos of the gabions are included in the document. However, since this was a finding the last two years the Air Force should begin planning for repairs. Please include photos. Please include recommendations to repair/replace fencing or establish a new long-term solution to restrict access at the North Bluff Site. See site file for additional information. Louis Howard
8/4/2017 Document, Report, or Work plan Review - other ADEC received a pre-Draft Remedial Action-Construction Naknek River Tidal Zone (Site SS012) Soil Excavation, Transport and Disposal, FT001 Work Plan ON 7/11/2017 and a response letter with comments table was sent out on 8/4/2017. The Work Plan proposed objectives 1) interceptor trench construction and soil treatment w ORC to remove the free product south of MW-57 at lower Naknek River site; 2) soil excavation up to 50 bcy from site SA039-DR16; 3) up to 15 drums sampling stored within the biocells and landfarm area, and offsite disposal; 4) gabion repairs along South Barrel Bluff. Linda (Qi) Liu
8/10/2017 Document, Report, or Work plan Review - other ADEC received a draft Work Plan, Field Sampling Plan & QAPP for 2017 Long Term Management at all seven groundwater zones at King Salmon Divert on 8/4/2017. Response letter with comments was sent out on 8/10/2017. Major work at GWZ3 includes: annual fence and landfill cap inspections, annual cap maintenance, & annual South Bluff Treatment System (SBTS) inspection, maintenance and quarterly monitoring. Quarterly monitoring will be conducted by collecting one influent sample from the lift station or the piping leading to the leach field and analyzing for VOCs, EDB, 1,2,3-TCP, DRO, GRO, PAHs, Pesticides, PCBs & Metals. Linda (Qi) Liu
9/5/2017 Update or Other Action ADEC received and approved final Work Plans, FSP and HSP for 2017 Long-term Management dated September 2017. Linda (Qi) Liu
10/24/2017 Cleanup Plan Approved ADEC received and approved final Work Plan for Remedial Action-Construction Naknek River Tidal Zone (Site SS012) Soil Excavation, Transport and Disposal, FT001 (dated September 2017). Linda (Qi) Liu
5/7/2018 CERCLA PA 'Final Preliminary Assessment Report for Perfluorinated Compounds, King Salmon Divert, March 2018'. The purpose of this PA Report is to identify locations at King Salmon Divert where PFAS may have been released into the environment based on AFFF use and storage and to provide an initial assessment of possible migration pathways and receptors. Areas recommended for further investigation include: FTA 1, FTA 2, FTA 4, Red Fox Creek, and Landfarm and Landfarm Holding Ponds. Areas recommended for initiation of SI include: Building 160, Former Building 152, Building 300, Spray Test Area, Building 617, and Eskimo Creek. Areas recommended for closure with no further investigation include: RAPCON of FTA 1, 1980 Fairchild C-119 Flying Boxcar Crash, 1985 Douglas DC-3 Crash, Buildings 150, 601, 603, and 647, Building 645, and Biocells. Sammi Castle
5/15/2018 Document, Report, or Work plan Review - other ADEC approves the 'Final 2017 Five-Year Review, King Salmon Divert, Naknek Recreation Camp I, Naknek Recreation Camp II, Alaska, November 2017' in a letter dated May 15, 2018. Land Use Controls have not been fully implemented at any groundwater zones at King Salmon Divert. Recommendations include: finalizing the decision document for Zone 7, determine the extent of drinking water wells at Lake Camp (number of wells, depth of wells, and groundwater gradient), and fully implement LUCs by updating public land records for non-USAF owned properties. The next five-year review will be completed in 2022. Sammi Castle
9/20/2018 Update or Other Action PFAS notification letter sent to King Salmon Air Station on this date. This letter advises the Air Force of ADEC's new technical memorandum, Action Levels for PFAS in Water and Guidance on Sampling Groundwater and Drinking Water. The tech memo establishes drinking water action levels for six PFAS compounds when detected in groundwater or surface water used for drinking. Future sampling must include results for all six UCMR3 compounds in accordance with this tech memo. Sammi Castle
10/3/2018 Document, Report, or Work plan Review - other ADEC approved the Final 2017 Long Term Management Report for the King Salmon Divert on this date. Zone 1 recommendations include continuation of monitoring with no changes. Petroleum hydrocarbons and TCE were detected above cleanup levels in groundwater in Zone 2; recommendations include continued monitoring and updating cleanup levels in next 5 Year Review. In Zone 3, low levels of TCE and benzene were detected in the March 2018 SBTS sample, and gabions in King Salmon Creek are being pulled out of alignment; recommendations include reducing sampling at the North and South Bluffs to once every five years. In Zone 4, petroleum hydrocarbons were detected above cleanup levels in the A-aquifer but below cleanup levels in the B-aquifer; recommended that monitoring should continue due to drinking water wells and other sensitive receptors lying downgradient of this site. Monitoring will continue in Zone 5 without changes. Inspections of the Rapids Camp and Landfill were conducted in Zone 6; there were no observations of noncompliance at the landfill. Two of eight wells in Zone 7 exceeded RAO for DRO; 2015 soil samples from three LF01 locations indicated DRO contaminated soil above cleanup levels - this should be excavated and treated. Sammi Castle
10/19/2018 Document, Report, or Work plan Review - other South Bluff Treatment System Reports for June 2018 and July 2018 submitted on this date. Influent sample taken on June 6, 2018 detected GRO, TCE, chloroform, arsenic, barium, and chromium. All detections were below regulatory limits. Influent sample taken on July 31, 2018 detected TCE PCE, and barium. All detections below regulatory limits. Sammi Castle
11/21/2018 Document, Report, or Work plan Review - other Approval letter sent for 2018 Remedial Action Operations & Land Use Control Inspections Work Plan. This work plan outlines annual monitoring to be conducted at the King Salmon Air Station during November-December 2018. Sammi Castle
3/29/2019 Document, Report, or Work plan Review - other ADEC received the Draft 2018 Remedial Action Operations & Land Use Control Inspections, dated March 2019. This report presents analytical and field data collected during the 2018 field season from six groundwater zones, and the institutional controls inspection at Groundwater Zone 6. ADEC submitted comments to the Air Force in a letter on April 19, 2019. Sammi Castle
4/29/2019 Document, Report, or Work plan Review - other ADEC received the Draft Uniform Federal Policy - Quality Assurance Project Plan for Site Inspections of Aqueous Film-Forming Foam Areas, dated April 2019. The purpose of the SI for King Salmon Divert is to evaluate whether a release of AFFF-derived PFAS has occurred to groundwater, soil (shallow and subsurface), surface water, and sediment as a result of historical AFFF use at 11 of the KSD AFFF areas: Building 160, Former Building 152, Building 300, Spray Test Area, Building 617, Eskimo Creek, Red Fox Creek, the Fire Training Areas (FT001, FT002, FT004), and the Former Landfarm and Holding Ponds. ADEC submitted comments on the draft work plan in a letter to the Air Force dated May 17, 2019. Sammi Castle
7/10/2019 Document, Report, or Work plan Review - other ADEC approved the Final 2018 Remedial Action Operations & Land Use Control Inspections, dated May 2019, in a letter to the Air Force on this date. Sammi Castle
8/2/2019 Document, Report, or Work plan Review - other ADEC approved the Final Uniform Federal Policy - Quality Assurance Project Plan for Site Inspections of Aqueous Film-Forming Foam Areas, King Salmon Divert, dated July 2019, in a letter to the Air Force on this date. Sammi Castle
9/10/2019 Document, Report, or Work plan Review - other ADEC received the Draft Work Plans, 2019-2022 Remedial Action Operations & Land Use Control Inspections, dated September 2019. ADEC submitted comments to the Air Force in a letter dated October 9, 2019. Sammi Castle
10/25/2019 Document, Report, or Work plan Review - other ADEC approved the Final Work Plans, 2019-2022 Remedial Action Operations & Land Use Control Inspections, dated October 2019, in a letter dated October 28, 2019. Sammi Castle
6/22/2020 Document, Report, or Work plan Review - other ADEC approved the Final Site Inspection Report of Aqueous Film-Forming Foam Areas, dated June 2020, in a letter on this date. The purpose of this SI is to evaluate whether a release of AFFF-derived PFAS has occurred to soil, surface water, sediment, and groundwater as a result of historical AFFF use at the following 11 areas: Combat Alert Cell, Former Fire Station, Current Fire Station, Spray Test Area, Wastewater Treatment Plant, Eskimo Creek, Red Fox Creek, Fire Training Areas 1, 2, and 4, and the Former Landfarm and Holding Ponds. All areas investigated had PFAS at concentrations above screening levels in some media and will require additional investigation. Sammi Castle
8/28/2020 Document, Report, or Work plan Review - other The Final 2019 Remedial Action Operations & Land Use Control Inspections, dated August 2020, was approved by ADEC in a letter on this date. This report presents analytical and field data collected during the 2019 field season from seven groundwater zones at King Salmon Divert. Sammi Castle
9/9/2020 Document, Report, or Work plan Review - other ADEC approved the Final Work Plan Addendum, 2020 Remedial Action Operations & Land Use Control Inspections, dated September 2020, in a letter on this date. This work plan describes the field investigation/monitoring and reporting activities to be conducted in seven groundwater monitoring zones located at King Salmon Divert during the 2020 field season. Field activities include the sampling of groundwater, surface water, and sediment, and the visual inspections of land use/institutional controls and landfills. Sammi Castle
4/1/2021 Update or Other Action In June 2020, the Air Force submitted a Request for Cleanup Complete with Institutional Controls Determination for King Salmon Divert Sites South Bluff (LF005) and North Bluff (LF014), and Determination of Cleanup Complete for Groundwater Zone 3 (OT029), dated June 2020. Following review of the request, ADEC has determined that LF014 and GWZ3 are not eligible for closure, as the timeframe of use for these sites overlaps with possible use of Aqueous Film Forming Foam. Therefore, ADEC has requested the Air Force sample for PFAS at LF014 and GWZ3 prior to closure consideration of these sites. Sammi Castle
6/8/2021 CERCLA Remedial Action Completion Report ADEC approved Final 2020 Remedial Action Operations & Land Use Control Inspections, Base Living Area (Zone 1), Base Industrial Area (Zone 2), North & South Bluffs & SBTS (Zone 3), Naknek River Storage Area (Zone 4), RAPCON & Red Fox Creek (Zone 5), Naknek Rec Camp I, Naknek Rec Camp II, King Salmon Divert, Alaska, dated June 2021. This report presents analytical and field data collected during the 2020 field season from five groundwater zones at King Salmon Divert, Alaska (KSD), Naknek Rec Camp I, and Naknek Rec Camp II. Darren Mulkey
8/23/2021 Document, Report, or Work plan Review - other The Final 2021 King Salmon Divert RAO LUC WP Addendum was reviewed and an approval letter was sent by ADEC. This 2021 Work Plan Addendum to the 2019 UFP-QAPP describes the field investigation/monitoring and reporting activities to be conducted during the 2021 Remedial Action Operations and Land Use Control Inspections under U. S. Army Corps of Engineers (USACE) Contract No. W911KB19C0015. Sites included in this workplan are: GWZ1, GWZ2, GWZ3, GWZ4, GWZ5, GWZ6, and GWZ7.In addition to sampling groundwater, surface water, and sediment, land use controls (LUCs) have been established to prevent exposure to contaminated media. LUC inspections for five groundwater zones, Naknek Rec Camp I, and Naknek Rec II will be conducted to ensure there have not been any unauthorized excavations or installation of drinking water wells in contaminated aquifers. Annual land fill inspections are also scheduled at the North and South Bluff in Zone 3, and the former landfills in Zone 4 and Zone 6. Additional work in Zone 3 will include barrier fence repair and the installation of signage. The installation and sampling of three groundwater monitoring wells at SA039-DR16 and the installation and sampling of two well points at LF022/SS022 are also included in this work plan. The results of this monitoring effort will be presented in a RA-O and LUC Inspections Report. An evaluation of the nature and extent of contamination with comparison to RAOs will be presented. Conclusions and recommendation based on the monitoring findings will be provided, as appropriate. Ginna Quesada
9/13/2021 Document, Report, or Work plan Review - other ADEC approved Final Work Plan MONITORING WELL INSTALLATION, REPAIR & DECOMMISSIONING for King Salmon Divert, ALASKA dated September 2021. Work will include repairing up to forty-five (45) wells, installing replacement or new monitoring wells at up to five (5) locations, decommissioning up to seventy (70) wells and monitoring points, and replacing well caps where needed in the following sites: GWZ1, GWZ2, GWZ3, GWZ4, GWZ5, and GWZ7. Ginna Quesada
7/6/2022 Document, Report, or Work plan Review - other DEC reviewed the Draft Monitoring Well Installation, Repair, and Decommissioning Report, King Salmon Divert, Alaska, Dated May 2022. The report describes monitoring well installation, repair and decommissioning activities across various sites in Groundwater Zones 1, 2, 3, 4, 5 and Naknek II, located in King Salmon, Alaska. Activities included replacing a monitoring well (MW00-04R) and a well point (GP-1AR), the installation of three monitoring wells (SA039DR16-01, SA039DR16-02, and SA039DR16-03), and the repair and/or capping of 61 wells. Additionally, seventy- four wells were decommissioned. Ginna Quesada
7/18/2022 Document, Report, or Work plan Review - other ADEC reviewed and submitted comments for the Draft 2021 Remedial Action Operations & Land Use Control Inspections, Base Living Area - Zone 1 (OT027), Base Industrial Area & LF022 - Zone 2 (OT028), North & South Bluffs - Zone 3 (OT029), Naknek River Storage Area - Zone 4 (OT030), Rapcon & Red Fox Creek - Zone 5 (OT031), Naknek Rec Camp I (Rapids Camp), Naknek Rec Camp II (Lake Camp), SA039-DR16 Groundwater Investigation, King Salmon Divert, Alaska, dated June 2022. The report describes the land use control inspections, field data, and analytical results from groundwater and surface water sampling conducted during the 2021 field season for Groundwater Zones 1, 2, 3, 4, 5, Naknek Rec Camp I, and Naknek Rec Camp II in King Salmon, Alaska. Continued groundwater and surface water sampling and land use control (LUC) inspections were recommended for all sites. The groundwater investigation at the SA039-DR16 site, located northwest of Groundwater Zone 2, found no groundwater exceedances of 18 AAC 75.345 Table C groundwater cleanup levels for diesel range organics, residual range organics, and polycyclic aromatic hydrocarbons and site closure was recommended for the site. The report included a 2022 work plan addendum for the upcoming field investigation, monitoring and reporting activities to be conducted during the 2022 remedial action operations and LUC inspections. The work plan addendum addressed the field sampling programs, analytical programs, and land use control inspections planned for each site in King Salmon, Alaska. Additionally, the work plan included a technical memorandum that described the repair process that will be used to manage the section of the South Barrel Bluff gabion wall that is slipping into King Salmon Creek. Ginna Quesada
8/17/2022 Document, Report, or Work plan Review - other ADEC submitted responses to comments received on August 15th 2022 regarding the Draft Monitoring Well Installation, Repair, and Decommissioning Report, King Salmon Divert, Alaska Dated May 2022. Approximately 6 cubic yards of soil cutting material was generated from the monitoring well activities. The approved work plan discussed the soil cutting material getting sampled and characterized prior to disposal, however this report noted historical results were used for characterizing the soil cutting material. Using historical results for characterizing investigative-derived waste is not appropriate, especially when the historical results are for petroleum only and the potentially contaminated media could have impacts from other analytes (per-and polyfluoroalkyl substances and pesticides for example). While the Transport, Treatment, & Disposal Approval forms were submitted retroactively, it is the department’s expectation that these forms be submitted to ADEC for approval prior to the transport and disposal of contaminated media. Per 18 AAC 75.370(b) “A responsible person, owner, or operator shall obtain approval before moving or disposing of soil subject to the site cleanup rules.” ADEC approval was not obtained prior to transporting the soil cutting material offsite. Ginna Quesada
9/8/2022 Document, Report, or Work plan Review - other ADEC approved the Final 2021 Remedial Action Operations & Land Use Control Inspections, Base Living Area - Zone 1 (OT027), Base Industrial Area & LF022 - Zone 2 (OT028), North & South Bluffs - Zone 3 (OT029), Naknek River Storage Area - Zone 4 (OT030), Rapcon & Red Fox Creek - Zone 5 (OT031), Naknek Rec Camp I (Rapids Camp), Naknek Rec Camp II (Lake Camp), SA039-DR16 Groundwater Investigation, King Salmon Divert, Alaska, dated August 2022. The report describes the land use control inspections, field data, and analytical results from groundwater and surface water sampling conducted during the 2021 field season for Groundwater Zones 1, 2, 3, 4, 5, Naknek Rec Camp I, and Naknek Rec Camp II in King Salmon, Alaska. Continued groundwater and surface water sampling and land use control (LUC) inspections were recommended for all sites. The groundwater investigation at the SA039-DR16 source area, located northwest of Groundwater Zone 2, found no groundwater exceedances of 18 AAC 75.345 Table C groundwater cleanup levels for diesel range organics, residual range organics, and polycyclic aromatic hydrocarbons and site closure was recommended for the site. ADEC is tracking SA039-DR16 as a source area part of the King Salmon AS GWZ 2 SA039 (ADEC File No. 2569.38.016.10). Based on the available information, SA039-DR16 does not need further investigation at this time, and ADEC will consider the source area cleaned up. However the King Salmon AS GWZ 2 SA039 site will remain active on the database until all other source areas within SA039 are ready for closure. The report included a 2022 work plan addendum for the upcoming field investigation, monitoring and reporting activities to be conducted during the 2022 remedial action operations and LUC inspections. The work plan addendum addressed the field sampling programs, analytical programs, and land use control inspections planned for each site in King Salmon, Alaska. Additionally, the work plan included a technical memorandum that described the repair process that will be used to manage the section of the South Barrel Bluff gabion wall that is slipping into King Salmon Creek. Ginna Quesada
9/30/2022 Document, Report, or Work plan Review - other ADEC approved the Final Monitoring Well Installation, Repair, and Decommissioning Report, King Salmon Divert, Alaska dated August 2022. The report describes monitoring well installation, repair and decommissioning activities across various sites in Groundwater Zones 1, 2, 3, 4, 5 and Naknek II, located in King Salmon, Alaska. Activities included replacing a monitoring well (MW00-04R) and a well point (GP-1AR), the installation of three monitoring wells (SA039DR16-01, SA039DR16-02, and SA039DR16-03), and the repair and/or capping of 61 wells. Additionally, seventy- four wells were decommissioned. Ginna Quesada
11/10/2022 Compliance Advisory Letter DEC issued compliance advisory letters to the U.S. Air Force, U.S. Army Corps of Engineers, and Paug-Vik Contractors LLC (PVC), to address violations of 18 AAC 75.325(i) and 18 AAC 75.370(b). On June 6, 2022, the U.S. Air Force (USAF) submitted two draft reports, Monitoring Well Installation, Repair, and Decommissioning Report (dated May 2022) and 2021 Remedial Action Operations & Land Use Control Inspections, SA039-DR16 Groundwater Investigation (dated June 2022). The draft reports were prepared by PVC,and described long-term monitoring and well repair activities at Groundwater Zones 1, 2, 3, 4, 5, 6, and 7 in King Salmon, Alaska. Both documents indicated soil cuttings and spent granulated activated carbon (GAC), used during the 2021 field season, were shipped offsite for disposal without DEC approval. Ginna Quesada
5/18/2023 Site Visit DEC conducted a site visit with the U.S. Air Force. Ginna Quesada
6/5/2023 Document, Report, or Work plan Review - other DEC reviewed and provided comments regarding the Draft 2022 Remedial Action Operations & Land Use Control Inspections, Base Living Area – Zone 1 (OT027), Base Industrial Area & LF022 – Zone 2 (OT028), North and South Bluffs – Zone 3 (OT029), Naknek River Storage Area – Zone 4 (OT030), RAPCON & Red Fox Creek – Zone 5 (OT031), Naknek Rec Camp I, Naknek Rec Camp II, King Salmon Divert, Alaska, dated May 2023. The report describes the field activities conducted during the 2022 field season and summarizes the analytical data. The report recommended continued monitoring and land use control inspections for all the sites. Ginna Quesada
8/24/2023 Document, Report, or Work plan Review - other DEC provided comments regarding the Draft Fourth Five-Year Review Sites OT027 (SS011, ST015); OT028 (LF022); OT029 (LF005, LF014); OT030 (LF008, SS012); Naknek Recreation Camp I – LF003 King Salmon Divert, Alaska Naknek Recreation Camp I, Alaska, Dated July 2023. This five-year review describes the selected remedies and the status of their implementation for Groundwater Zone 1 (OT027), Eskimo Creek Seeps (SS011), POL Tanks (ST015), Groundwater Zone 2 (OT028), Eskimo Creek Dump Site (LF022), Groundwater Zone 3 (OT029), South Bluff (LF005), North Bluff (LF014), Groundwater Zone 4 (OT030), Landfill No. 5 (LF008), Naknek River Storage Sites (SS012), and Groundwater Zone 6 Naknek Recreation Camp I (LF003) sites located in King Salmon, Alaska. The review focuses on identifying issues and providing recommendations for improving the performance of selected remedies that were recorded in the King Salmon Records of Decision (RODs). Protectiveness determinations were made for each site to identify the extent that each selected remedy is securing the protection of human health and the environment. Ginna Quesada
10/27/2023 Document, Report, or Work plan Review - other DEC approved the Final 2023-2024 Remedial Action Operations & Land Use Control Inspections, Groundwater Zone 1 (Base Living Area) Groundwater Zone 2 (Base Industrial Area) Groundwater Zone 3 (North and South Bluffs) Groundwater Zone 4 (Naknek River Storage) Groundwater Zone 5 (RAPCON & Red Fox Creek) Groundwater Zone 6 (Naknek I) Groundwater Zone 7 (Naknek II) King Salmon Divert, Alaska, Dated October 2023.The work plan describes the planned field activities for the 2023 and 2024 field seasons at the Base Living Area (OT027), Base Industrial Area & LF022 (OT028), North and South Bluffs (OT029), Naknek River Storage Area (OT030), RAPCON & Red Fox Creek (OT031), Naknek Rec Camp I, and Naknek Rec Camp II sites located in King Salmon, Alaska. The planned scope of work includes land use inspections, free product recovery, and the continued monitoring of groundwater, surface water, and sediment. Ginna Quesada
4/17/2024 Document, Report, or Work plan Review - other DEC approved the Final Fourth Five-Year Review Sites OT027 (SS011, ST015); OT028 (LF022); OT029 (LF005, LF014); OT030 (LF008, SS012); Naknek Recreation Camp I – LF003 King Salmon Divert, Alaska Naknek Recreation Camp I, Alaska, dated April 2024. Ginna Quesada
4/17/2024 CERCLA Proposed Plan DEC approved the Final Fourth Five-Year Review Sites OT027 (SS011, ST015); OT028 (LF022); OT029 (LF005, LF014); OT030 (LF008, SS012); Naknek Recreation Camp I – LF003 King Salmon Divert, Alaska Naknek Recreation Camp I, Alaska, dated April 2024. Ginna Quesada

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details
Land Use Plan / Maps / Base Master Plan The USAF will modify the General Plan, 611th Air Support Group (ASG), Remote Alaska (hereafter referred to as the General Plan) and appropriate land records (i.e., deeds) to include approved institutional controls, which restrict future installation of drinking-water wells and soil excavation at both sites. Land-use restrictions and land surveys will be included in the General Plan, which is scheduled for completion by October 2000.

Requirements

Description Details
Groundwater Monitoring Residential wells near the bluffs have been sampled for potential contaminants several times since 1994. No contaminants have been detected; consequently, residential wells will no longer be sampled. Instead a more comprehensive system of sentry wells has been installed and will be sampled as delineated in the revised monitoring plan (Bristol/OASIS, 1999a). Groundwater and surface-water monitoring at the bluffs will continue on an annual basis following procedures outlined in the revised monitoring plan (Bristol/OASIS, 1999a).

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.