Action Date |
Action |
Description |
DEC Staff |
1/1/1985 |
Preliminary Assessment Approved |
Site assessment by Engineering Science entitled "IRP Phase I Report, Southern Region LRRS", prepared for the USAF Engineering Service Center. The site assessment identified six potentially contaminated areas at the site. The report recommended follow-up action for the site. |
Former Staff |
8/26/1987 |
Update or Other Action |
Site visit made by Woodward Clyde and U.S. Air Force personnel to the site in August 1987. The purpose was to gather further assessment information at the site to support a no further action document (NFAD). |
Former Staff |
1/1/1988 |
Update or Other Action |
(Old R:Base Action Code = SI - Site Investigation). Site visit and sampling conducted by Ecological Services, Anchorage. PCBs up to 3096 ppm discovered in the soil. |
Former Staff |
2/9/1988 |
Update or Other Action |
Record of Decision (for only portion of site) signed by 11th Tactical Control Group, ADEC, and EPA Region 10 in February 1988 for No Further Action at 6 sites. These sites include: Waste Accumulation Area 1&2 and Landfill No. 2 (main portion of LF03); Upper Camp Dump (WP06); Road Oiling (OT04); Waste Accumulation Area 3 (SS01); White Alice Site (OT05); and Lower Camp Landfill (LF02). |
Former Staff |
2/9/1988 |
Update or Other Action |
Waste Accumulation Area 1&2 and Landfill No.2 site portion closed, Drum Disposal Area site portion found at a later date. Record of Decision signed by 11th Tactical Control Group, ADEC, and EPA Region 10 in February 1988 for No Further Action at 6 sites. These sites include: Waste Accumulation Area 1&2 and Landfill No.2 (main portion of LF03); Upper Camp Dump (WP06); Road Oiling (OT04); Waste Accumulation Area 3 (SS01); White Alice Site (OT05); and Lower Camp Landfill (LF02). |
Former Staff |
1/18/1989 |
Update or Other Action |
(Old R:Base Action Code = NFA - No Further Action Required (CERCLA)). A No Further Action Document supported by Woodward Clyde's recommendations, is signed off by EPA, ADEC and the USAF. |
Former Staff |
1/7/1991 |
Site Number Identifier Changed |
Old Reckey 1981210912709 changed to reflect correct region. |
Former Staff |
7/15/1993 |
Update or Other Action |
Final Site Investigation Report (dated July 1993) prepared by Woodward-Clyde. |
Former Staff |
8/22/1995 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). RI action added by Shannon and Wilson on 3/13/97, based on Relative Risk Evaluation Worksheet dated 8/22/95. Pathways: surface soils have been impacted by PCBs. Receptors: site workers, visitors, several endangered and/or threatened species. This site is located in Togiak National Wildlife Refuge. |
S&W-Miner |
7/1/1996 |
Update or Other Action |
Revised Final Management Action Plan (dated June 1996) received on July 1, 1996. |
Ray Burger |
6/3/1997 |
Update or Other Action |
Removal of Drums and Grossly Contaminated Soils Project Plans (dated April 30, 1997); teleconference on May 29, 1997; ADEC comment letter dated June 3, 1997. |
Gretchen Pikul |
11/15/1997 |
Update or Other Action |
Closure Monitoring Report Landfill 2 (LF03) (dated November 1997). |
Gretchen Pikul |
12/1/1997 |
Update or Other Action |
Addendum to Existing Workplan for PCB Sampling at the Landfill 2 and Borrow Source (draft dated November 25, 1997); teleconference on December 1, 1997 work to begin same day. |
Gretchen Pikul |
1/9/1998 |
Update or Other Action |
Management Action Plan (draft dated July 25, 1997, final dated January 9, 1998); ADEC comment letter dated December 4, 1997. |
Gretchen Pikul |
8/15/1998 |
Update or Other Action |
PCB Investigation of Landfill 2 and Associated Borrow Source (draft dated January 1998, final dated August 1998); ADEC comment letter dated June 9, 1998. |
Gretchen Pikul |
10/13/1999 |
Site Added to Database |
Waste oil, chlorinated solvents, metals, PCBs, diesel fuel, and unknown substances in drums. |
Gretchen Pikul |
1/3/2000 |
Update or Other Action |
Drum Removal (LF03) report - draft dated January 1998 and received on March 25, 1998, inhouse report of poor quality, ADEC comment letter dated June 1, 1998; draft final dated and received on January 7, 1999; October 1999 telephone calls - ADEC response not available for Proposed Plan and Decision Documents until Drum Removal Report comments are addressed and report is finalized; October 21, 1999 received revised analytical table; October 27, 1999 telephone call on revised table; October 28, 1999 received final draft report; ADEC sent final comments via e-mail in December 1999; final report dated December 1999 and received on January 3, 2000; ADEC approval letter dated July 19, 2000. Action complete August 1997. |
Gretchen Pikul |
5/9/2000 |
Proposed Plan |
Proposed Plan for Cleanup at Upper Camp (SS07) and Drum Disposal Site (LF03); initial ADEC comment letter for Proposed Plan dated 12-99; comment resolution meeting for Proposed Plan on March 1, 2000; final Proposed Plan dated May 2000; public comment period May 8 to June 8, public meeting upon request; one comment received from public. |
Gretchen Pikul |
4/17/2001 |
Record of Decision |
Decision Document for Drum Disposal Site (LF03) dated October 25, 2000 signed by ADEC on October 31, 2000, signed by Air Force on December 4, 2000, and received on April 17, 2001. |
Gretchen Pikul |
4/17/2001 |
Site Closure Approved |
Decision Document for Drum Disposal Site (LF03) dated October 25, 2000 signed by ADEC on October 31, 2000, signed by Air Force on December 4, 2000, and received on April 17, 2001. |
Gretchen Pikul |
7/13/2001 |
Site Number Identifier Changed |
Cape Newenham LRRS site, Reckey 198125X912709, was disseminated into nine component sites and this is one of them. |
Former Staff |