Fairbanks PM2.5 Moderate SIP

 

Note: The full adopted SIP documents and its appendices can be downloaded from the links below or individual sections and appendices can be downloaded separately due to the large file size. The State Implementation Plan was finalized in regulation on January 6, 2015 and amended September 7, 2016.

  • State Implementation Plan (PDF 6.73M)
  • Appendices (PDF 89.9M)
  • Supporting Regulations
  • SIP Development Process
  • State Air Quality Control Plan
    Volume II: Analysis of Problems, Control Actions; Section III: Area-wide Pollutant Control Program;
    D: Particulate Matter; 5: Fairbanks North Star Borough PM2.5 Control Plan


    List of Adopted Sections

    Section 5.01    Executive Summary
                            (12/24/2014)

    Section 5.02    Background and Overview of PM2.5 Rule
                            (12/24/2014)

    Section 5.03    Nonattainment Boundary and Design Day Episode Selection
                            (09/07/2016, 12/24/2014)

    Section 5.04    Ambient Air Quality and Trends
                            (12/24/2014)

    Section 5.05    PM2.5 Network & Monitoring Program
                            (12/24/2014)

    Section 5.06    Emission Inventory Data
                            (12/24/2014)

    Section 5.07    Control Strategies
                            (09/07/2016, 12/24/2014)

    Section 5.08    Modeling
                            (12/24/2014)

    Section 5.09    Attainment Demonstration
                            (12/24/2014)

    Section 5.10    Contingency Measures
                            (12/24/2014)

    Section 5.11    Emergency Episode Plan
                            (09/07/2016, 12/24/2014)

    Section 5.12    Assurance of Adequacy
                            (12/24/2014)

    Section 5.13    Conformity and Motor Vehicle Emission Budget
                            (12/24/2014)

    Section 5.14    Acronyms and Abbreviations
                            (12/24/2014 )

    List of Adopted Appendices

    Appendix III.D.5.01    Executive Summary  (No Appendix)
                                       (12/24/2014)

    Appendix III.D.5.02    Background and Overview of PM2.5 Rule
                                       (12/24/2014)

    Appendix III.D.5.03    Nonattainment Area Boundary and Design Day Episode Selection
                                       (09/07/2016, 12/24/2014)

    Appendix III.D.5.04    Ambient Air Quality and Trends
                                       (12/24/2014)

    Appendix III.D.5.05    PM2.5 Network and Monitoring Program
                                       (12/24/2014)

    Appendix III.D.5.06    Emissions Inventory Data
                                       (12/24/2014)

    Appendix III.D.5.07    Control Strategies
                                       (12/24/2014)

    Appendix III.D.5.08    Modeling
                                       (12/24/2014)

    Appendix III.D.5.09    Attainment Demonstration
                                       (12/24/2014)

    Appendix III.D.5.10    Contingency Measures
                                       (12/24/2014)

    Appendix III.D.5.11    Emergency Episode Plan  (No Appendix)
                                       (12/24/2014)

    Appendix III.D.5.12    Assurance of Adequacy
                                       (09/07/2016, 12/24/2014)

    Appendix III.D.5.13    Conformity and Motor Vehicle Emissions Budget
                                       (12/24/2014)