Division of Spill Prevention and Response

Breadcrumbs

Site Report: Galena AFS/Airport - TU001 Power Plant Tank 49


Site Name: Galena AFS/Airport - TU001 Power Plant Tank 49
Address: Behind Power Plant, Building 1499 (IRP -TU01), Galena, AK 99741
File Number: 860.26.002
Hazard ID: 1418
Status: Active
Staff: Dennis Shepard, 9074512180 dennis.shepard@alaska.gov
Latitude: 64.740721
Longitude: -156.957595
Horizontal Datum:WGS84


We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.


Problems/Comments

On 4/15/91 ADEC was informed that a 12,000 gallon UST (diesel) located behind power plant (Building 1499) failed tank tightness testing. A total of four leaking USTs were removed by 1997. Collectively referred to as Tank # 49. After excavation, these tanks were replaced by two above ground storage tanks. Air Force Installation Restoration Program Site TU001. No soil samples were collected from the 1997 tank excavation. Prior soil and groundwater samples documented petroleum contamination in excess of cleanup levels. The site is assigned a HIGH overall risk on the Air Force Relative Risk Evaluation Worksheet dated 8/29/95. --Updated 2011-- In April 2010 a Work Plan for Site Inspection, Remedial Investigation, and Site Characterization Former Galena Forward Operating Location, Alaska was developed. TU001 was identified as a candidate for the site characterization pathway. The goal of the site characterization pathway is to characterize the nature and extent of contamination both laterally and vertically. Target analytes at this site are: DRO, GRO, BTEX, and PAHs. Additional target analytes in the vicinty of the OWS include VOCs, EDB, 1,2 DCA, PCBs, and metals. This site was also analyzed for possible analytes based on a 500ft radius from the site boundary. Based on the site use, the target analyte list for this site was not adjusted. Initial sampling at this site is expected to be completed during the 2011 field season.



Action Information

Action Date Action Description DEC Staff
4/15/1991 Site Added to Database UST failed leak test. TCE and pesticides detected. No Longer Assigned
8/21/1991 Update or Other Action (Old R:Base Action Code = NOR - Notice of Release Letter (LUST)). Dennis Timmons
4/28/1992 Site Ranked Using the AHRM Initial ranking. No Longer Assigned
1/10/1996 Update or Other Action Received Draft Baseline Risk Assessment, Volume 4, Addendum (2 reports). Kalu Kalu
1/10/1996 Update or Other Action (Old R:Base Action Code = RI - Remedial Investigation). Received DRAFT FINAL Remedial Investigation Report, Volume 1. Kalu Kalu
2/15/1996 Update or Other Action (Old R:Base Action Code = RI - Remedial Investigation). Received Engineering Evaluation / Cost Analysis, Potential TCE Impact to the Drinking Water Supply, "Galena Airport", and Engineering Evaluation / Cost Analysis, Million Gallon Hill Source Area of the West Unit Galena Airport and Cost Analysis and Lubricants Area, Galena Airport, and Remedial Investigation / Feasibility Study, Galena Airport. Kalu Kalu
3/22/1996 Update or Other Action Received Engineering / Cost Analysis, DDT/POL Contaminated Soil Stockpile, Galena Airport. Kalu Kalu
3/27/1996 Update or Other Action Received Baseline Risk Assessment Report "FINAL", Volumes 1 through 4. Kalu Kalu
3/27/1996 Update or Other Action (Old R:Base Action Code = RI - Remedial Investigation). Received Remedial Investigation Report FINAL, Volumes 1 and 7 only. Kalu Kalu
6/1/1996 Update or Other Action Comments on the United States Air Force, 6llth Civil Engineer Squadron's Final Baseline Risk Assessment Report, Galena Airport, Alaska, Volume IV, Addendum, received 7/1/1996. Kalu Kalu
6/1/1996 Update or Other Action (Old R:Base Action Code = RA - Remedial Action). Remedial Action documents received 7/2/1996: Draft Standard Operating Procedures for Hazardous Materials; Project Activities Work Plan and Environmental Cleanup Plan; and Quality Program Plan, Volume I, Draft Environmental Health and Safety Plan, Volume II, Draft Sampling and Analysis Plan, and Volume III, Draft Construction Quality Plan. Kalu Kalu
3/27/1997 Update or Other Action Site updated by Shannon and Wilson, based on the Air Force Relative Risk Evaluation Worksheet dated 8/29/95. S&W
9/26/2002 Site Ranked Using the AHRM Changed Toxicity Value to 4 from 2 to reflect presence of hazardous substances. Checked Multiple Sources. No Longer Assigned
2/21/2003 Update or Other Action Staff Updated problem and comment statements in database. This site is believed to be a UST site, not the same as Building 1845. Ann Farris
9/3/2003 Site Number Identifier Changed Changed Workplan from X0 to X9 to reflect presence of DDT at site. No Longer Assigned
9/17/2003 Update or Other Action Staff received the Draft Remedial Investigation/Feasibility Study Work Plan for Galena Airport. Staff has begun review of the document. A comment resolution/technical project team meeting is scheduled October 2-3rd in Anchorage. This work plan is intended to address the many outstanding site characterization issues that were raised by Louden Tribal Council, the Environmental Protection Agency, and ADEC as well as the Remedial Process Optimization Evaluation completed in 2002. Ann Farris
1/22/2004 Meeting or Teleconference Held Staff attended the 7th Galena Technical Project Team Meeting on January 12 through 15th. We discussed most of the contaminated sites at the Galena Air Force Station and the Campion Radio Relay Station. We evaluated the adequacy of the historical site characterization, the need for further characterization, possible remedial options, the adequacy of exiting remediation systems, and the need for a risk assessment. Of the 23 sites reviewed at the meeting, 5 are closed already by ADEC, 5 are believed to not need any further characterization or remediation. The remaining 13 need additional investigation or remediation of some type. Additionally, there are a few sites that were not covered during this meeting that will still need to be reviewed. Power Plant Tank #49 -The site is sufficiently characterized. The Air Force still needs to look for documentation that the tanks were removed along with the contaminated soil, but there were verbal reports from the power plant workers that this occurred. The area currently has ASTs on top of it. No further work necessary under the RI. Decision probably to NFRAP with ICs. Ann Farris
8/30/2004 Meeting or Teleconference Held 11th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
8/31/2004 Update or Other Action The USAF's Proposed Plan remedy for the site is No Further Action with Institutional Controls. However, because contamination still remains at the site above cleanup levels, ADEC recommended the site instead be considered for No Further Remedial Action Planned (NFRAP) status. The recommendation of NFRAP is tied to the implementation of the proposed Institutional Controls, which include provisions against excavation in specified areas and prevention of drinking water well installation in the site vicinity. The Proposed Plan will be put forth for public comment after it is finalized. Colin Craven
10/21/2004 Meeting or Teleconference Held Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
11/5/2004 Meeting or Teleconference Held 12th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
11/19/2004 Meeting or Teleconference Held Attended a week long meeting in San Antonio, Texas to participate in the formulation of an outline for the Galena Airport and Campion Air Station Remedial Investigation/Feasibility Study (RI/FS). Colin Craven
1/12/2005 Update or Other Action Apparent overlap between this Contaminated Site entry and an entry in the Leaking Underground Storage Tank (LUST) database will be reconciled upon a review of historical information. Colin Craven
1/28/2005 Meeting or Teleconference Held Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
1/28/2005 Meeting or Teleconference Held 13th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
4/19/2005 Meeting or Teleconference Held 14th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
4/26/2005 Meeting or Teleconference Held Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
5/13/2005 Meeting or Teleconference Held 15th Galena Technical Project Team meeting in Galena. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
6/9/2005 Meeting or Teleconference Held 16th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
7/20/2005 GIS Position Updated Location updated by interpolation from USGS quadrangle map. Colin Craven
8/30/2005 Meeting or Teleconference Held 17th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
9/2/2005 Update or Other Action DEC commented on the draft final Proposed Plan that recommended site closure for five Installation Restoration Program sites. DEC recommended conditional closure for the Power Plant Tank No. 49 site. Documented surface and subsurface soil contamination to the south of the Power Plant Tank site was recommended for further action under an inactive Waste Accumulation Area site (see separate database entry for that site). Since the excavation of the Power Plant Tank No. 49 was poorly documented, Institutional Controls are recommended for any remaining contamination that may still exist around the existing Power Plant infrastructure. Colin Craven
10/12/2005 Meeting or Teleconference Held Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
10/20/2005 Meeting or Teleconference Held 18th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
1/26/2006 Meeting or Teleconference Held 19th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
3/14/2006 Meeting or Teleconference Held 20th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
6/20/2006 Meeting or Teleconference Held 21st Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
10/6/2006 Meeting or Teleconference Held 22nd Galena Technical Project Team meeting in Anchorage. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
11/17/2006 Meeting or Teleconference Held 23rd Galena Technical Project Team meeting in Fairbanks. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
1/18/2007 Meeting or Teleconference Held 24th Galena Technical Project Team meeting in Anchorage. See the "Galena AFS - Sitewide" listing for more details. Colin Craven
4/1/2010 Report or Workplan Review - Other QAPP reviewed Fred Vreeman
8/1/2010 Update or Other Action QAPP approved Fred Vreeman
5/23/2011 Meeting or Teleconference Held Site specific discussions held during meeting. Fred Vreeman
6/23/2011 Conceptual Site Model Submitted CSM submitted Fred Vreeman
6/23/2011 Report or Workplan Review - Other SC work plan recieved and reviewed, comments sent to USAF. Fred Vreeman
7/11/2011 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 72396 name: auto-generated pm edit Galena AFS - Power Plant Tank 49 Amanda Loomis
8/2/2011 Update or Other Action TU001 Response to comments submitted by USAF Fred Vreeman
9/9/2011 Update or Other Action Conditional approval for field work at TU001 and response to comment replies sent to USAF Fred Vreeman
4/27/2012 Report or Workplan Review - Other Received a Draft Site Characterization results report for Site TU001. Dennis Shepard
9/7/2012 Report or Workplan Review - Other Provided review comments for the Draft Site Characterization results report. Dennis Shepard
6/6/2013 Report or Workplan Review - Other A response to comments and a Draft Final version of the Site Characterization report was submitted. Dennis Shepard
6/19/2013 Report or Workplan Review - Other Provided comments for the Draft Final version of the Site Characterization results report. Dennis Shepard
7/22/2013 Meeting or Teleconference Held A teleconference meeting was held to resolve remaining issues for the Site Characterization results report. All remaining issues for the report were resolved. Dennis Shepard
10/25/2013 Site Characterization Report Approved DEC approval of the Site Characterization (SC) Results Report for Power Plant Tank 49 (Site TU001), Former Galena Forward Operating Location (FOL), Alaska. Monte Garroutte
9/5/2014 Site Characterization Report Approved DEC approved the Supplemental Site Characterization (SC) Results Report, Power Plant Tank 49 (TU001), Former Galena Forward Operating Location (FOL), Alaska. Monte Garroutte
11/28/2014 Site Characterization Report Approved DEC approved the Addendum Site Characterization (SC) Results Report, Power Plant Tank 49 (Site TU001), Former Galena Forward Operating Location (FOL), Alaska. The purpose of the addendum was to address requirements for an SC Report under 18 AAC 75.335 (c) (DEC, 2012), specifically, to propose cleanup levels and remedial techniques for the site. Monte Garroutte
11/28/2014 Risk Assessment Report Approved DEC approved the Screening Level Ecological Risk Assessment for Power Plant Tank 49 (Site TU001). Potential risks were estimated for terrestrial plants, soil invertebrates, birds, and mammals potentially exposed to soils. Selected Contaminants Of Potential Ecologic Concern included 4,4-DDE and 4,4-DDT (birds and mammals) and C10-C25 DRO and C-6-C10 GRO (plants and soil invertebrates), showed a small potential for risk under conservative assumptions and were evaluated further. Additional evaluation of the data (depths, locations, and/or number of detections exceeding Threshold Reference Values), exposure assumptions and exposure point concentrations used in the risk refinement indicated that under more realistic assumptions, there were no unacceptable risks. Dennis Shepard
3/30/2016 Report or Workplan Review - Other DEC provided comments for the Draft subsurface (vertical well) clean up plan submitted on January 27, 2016. The plan included a proposal for alternate cleanup levels (ACLs) developed 4-phase hydrocarbon risk calculator. Dennis Shepard
6/29/2016 Cleanup Plan Approved DEC approved the Subsurface Aeration (Vertical Well) Cleanup Plan for site TU001. Dennis Shepard
10/26/2016 Meeting or Teleconference Held A restoration Advisory board meeting was held in Galena Alaska to discuss the general and specific status of site investigations and cleanup at Galena. Dennis Shepard