Action Date |
Action |
Description |
DEC Staff |
3/23/1989 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 76467 ADD; |
Former Staff |
3/23/1989 |
Site Added to Database |
|
Former Staff |
3/29/1989 |
Site Visit |
FI; J. Halverson investigated complaint. Joel Carroll (owner) stated that the dispenser was picking up water. |
Former Staff |
3/30/1989 |
Update or Other Action |
John Halverson sent a letter following up to a phone call and the NOV's for the spilling of fuel, and the failure to report the loss to ADEC. |
Alyce Hughey |
3/31/1989 |
Update or Other Action |
John Halverson sent a letter and information to assist in dealing with underground storage tanks. |
Alyce Hughey |
5/22/1989 |
Underground Storage Tank Site Characterization or Assessment |
PA; Preliminary site survey performed by 5/22/89, but no cleanup underway. |
Former Staff |
5/24/1989 |
Update or Other Action |
John Halverson sent a letter requesting the owner to Pressure Test the entire fule supply system at Sunny's Service Station. |
Alyce Hughey |
6/1/1989 |
Site Visit |
FI; Northern Lights Petro Equipment pressure tested tanks. Two tanks passed, and one failed. The 4000 gallon unleaded tank was pumped out and existing tanks were to be removed within two weeks. |
Former Staff |
7/26/1989 |
Update or Other Action |
John Halverson sent a letter requesting a progress report of the soil contamination at the service station as a result of the leak/leaks noted this spring. |
Alyce Hughey |
9/8/1989 |
Leaking Underground Storage Tank Corrective Action Underway |
RAPR; QA/QC plan for sampling received from J. Cushing. New installation to be done by Northern Lights Petro. Co. in accordance with Chevron Oil Co. typicals. |
Former Staff |
9/19/1989 |
Update or Other Action |
REM; Excavation found that most soils encountered have some petroleum contamination. Work proceeding without a written plan. J. Carroll discovered problem larger than anticipated and is unsure if he could afford the costs. DEC requested work be stopped until plans are received and approved. Also requested water well survey, summary of work to date, and proof of financial capability. |
Former Staff |
10/6/1989 |
Update or Other Action |
John Halverson sent a letter to confirm and follow-up on phone conversation requesting that the owner cease further cleanup actions until ADEC receives and reviewed and approved written plans identifying how clean-up is going to proceed. |
Alyce Hughey |
10/30/1989 |
Update or Other Action |
John Halverson sent a letter after phone call regarding the failure to comply with the requests in the letter dated October 6, 1989. |
Alyce Hughey |
10/30/1989 |
Leaking Underground Storage Tank Corrective Action Underway |
RAPR; Written proposal from RZA for site assessment. Proposal lacked sufficient content and detail. Assessment plan re-submitted on 11/13/89 and accepted on 11/17/89. |
Former Staff |
11/17/1989 |
Underground Storage Tank Site Characterization or Assessment |
John Halverson approved the workplan to conduct the initial assessment work, but additional work may need to be done to thoroughly document the vertical and horizontal extent of contamination, and requested the remainder of the information requested. |
Alyce Hughey |
1/19/1990 |
Release Investigation |
SI; Eight borings were drilled on Jan. 24 and 25, 1990. 2 of 5 soil samples above ADEC cleanup levels. Both water samples had benzene concentrations greater than MCL (5 ppb). Contamination not defined vertically or laterally. |
Former Staff |
1/19/1990 |
Release Investigation |
RELR; RELR date changed DB conversion 1/11/11 |
Former Staff |
1/19/1990 |
Underground Storage Tank Site Characterization or Assessment |
SA1R; SA1R date changed DB Conversion 1/11/11 |
Former Staff |
5/23/1990 |
Update or Other Action |
Monica English sent a letter requesting additional information regarding the extent and concentration of the fuel contamination after reviewing the Subsurface Petroleum Hydrocarbon Evaluation, from RZA, Inc. dated February 26, 1990. |
Alyce Hughey |
12/1/1991 |
Update or Other Action |
UPD; Financial Aid Application sent to Responsible Party. |
Former Staff |
12/13/1991 |
Update or Other Action |
Monica English sent a letter requesting the additional information requested. |
Alyce Hughey |
3/1/1992 |
Update or Other Action |
UPD; Financial Aid Application sent to Responsible Party again. If the RP does not apply for financial assistance this site should be reviewed for enforcement actions as the RP has ignored all requests for action. |
Former Staff |
8/15/1993 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
LCAU; |
Former Staff |
12/14/1993 |
Update or Other Action |
NOR; Joel Carroll of Sunny's Chevron called in to report a potential spill. He was getting water in one of his underground storage tanks. Mr. Carroll felt that the water may have displaced fuel (unleaded gas) from the tank. The suspect tank was pumped free of product. |
Former Staff |
8/23/1994 |
Update or Other Action |
Monica English sent a Warning Letter after a failure to conduct a release investigation and failure to provide the department with a Corrective Action Plan. |
Alyce Hughey |
1/3/1997 |
Release Investigation |
Monica English sent a letter of response after reviewing the Release Investigation from Cushing Engineering and requested for a Corrective Action Plan. |
Alyce Hughey |
3/3/1997 |
Update or Other Action |
Monica English sent a letter of response after receiving a letter from the owner stating that the tanks will be removed during the summer of 1997. |
Alyce Hughey |
11/20/1997 |
Update or Other Action |
ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: JOEL J. CARROLL |
Former Staff |
5/2/1998 |
Underground Storage Tank Site Characterization or Assessment |
Stockpile sample results report. |
Alyce Hughey |
6/3/1998 |
Update or Other Action |
Monica English sent a letter approving the disposal of the approximate 30 cubic yards of the stockpiled soil after reviewing the Stockpile Sampling Results from Rozak Engineering, dated May 2, 1998. |
Alyce Hughey |
7/11/1999 |
Document, Report, or Work plan Review - other |
Site Assessment & Release Investigation Report. |
Alyce Hughey |
8/6/1999 |
Document, Report, or Work plan Review - other |
Colin Basye sent a letter with review comments after reviewing the Underground Storage Tank Site Assessment and Release Investigation Report from Rozak Engineering dated June 8, 1999. |
Alyce Hughey |
4/27/2001 |
Update or Other Action |
Paul Horwath sent a Notice of Violation letter for failure to cleanup the contaminated soil and groundwater after the department's UST Financial Assistance Program was able to offer cleanup grant funding. |
Alyce Hughey |
6/15/2001 |
Leaking Underground Storage Tank Corrective Action Underway |
CAP received & reviewed. |
Alyce Hughey |
4/29/2002 |
Underground Storage Tank Site Characterization or Assessment |
Report received and reviewed. |
Alyce Hughey |
5/30/2002 |
Leaking Underground Storage Tank Corrective Action Underway |
CAP approval. |
Alyce Hughey |
8/30/2002 |
Document, Report, or Work plan Review - other |
Soil Excavation report received & reviewed. |
Alyce Hughey |
9/24/2002 |
Leaking Underground Storage Tank Corrective Action Underway |
Monica English sent an approval letter for the Corrective Action Plan, Contaminated Soils Remediation from OASIS, dated August 14, 2002. |
Alyce Hughey |
11/4/2002 |
Underground Storage Tank Site Characterization or Assessment |
Monitor Well Installation Workplan. |
Alyce Hughey |
12/4/2002 |
Update or Other Action |
Monica English sent a follow-up letter after reviewing the Treated Soil and Post-Treatment Pad Sample Results Report from OASIS Environmental. |
Alyce Hughey |
1/3/2003 |
Update or Other Action |
Monica English sent an approval letter for the cleanup of contaminated soil stockpile. |
Alyce Hughey |
4/2/2003 |
Leaking Underground Storage Tank Corrective Action Underway |
Revised Work Plan and Schedule for GW Sampling. |
Alyce Hughey |
5/1/2003 |
Document, Report, or Work plan Review - other |
GW Monitor Well Installation & Sampling #1. |
Alyce Hughey |
5/22/2003 |
Document, Report, or Work plan Review - other |
GW Monitor Well Sampling #2. |
Alyce Hughey |
11/24/2003 |
Conditional Closure Approved |
Based on cleanup activities conducted and inaccessibility and levels of remaining soil contamination, a NFRAP letter is issued. |
Alyce Hughey |
11/24/2003 |
Institutional Control Record Established |
Note to the database documenting that GRO and benzene contaminated soil remains in the right of way along the edge of the property. If future excavation activities occur in the area of soil contamination then the RP will be required to utilize a qualified third party consultant to oversee the activities. |
Monica English |
5/14/2004 |
Update or Other Action |
Monica English sent an approval letter to decommission the Monitoring Wells. |
Alyce Hughey |
10/13/2004 |
Update or Other Action |
File number 2314.26.027 assigned and entered into the Fileroom DB and LUST DB. |
Alyce Hughey |
10/12/2006 |
Update or Other Action |
Using Firgures 1 and 2 from the Groundwater Monitor Well Installation and Sampling #1, from Rozak Engineering, dated May 1, 2003, in conjunction with TopoZone Pro and the KPB Parcel Lookup, entered the coordinates for this site. Metadata includes No Topo Basemap, Black and White Aerial Photo, TopoZone Pro Street Maps, on a Medium Size Map, view Scale 1:9,840, Coordinate Datum NAD83. High degree of confidence in accuracy of location. |
Alyce Hughey |
11/10/2014 |
Update or Other Action |
Staff changed from Paul Horwath to IC Unit. |
Kristin Thompson |
6/3/2016 |
Update or Other Action |
Attach ADEC's Approval to Decommission MWs, and the final MW Decommissioning Report to the publicly available version of this CSP database. |
Paul Horwath |
6/7/2016 |
Institutional Control Compliance Review |
IC compliance review conducted. The groundwater monitoring requirement was never added as part of the Closure/IC Details entered upon site closure. This IC requirement has previously been fulfilled (along with the monitoring well decommissioning). Added this information to the Closure/IC Details. Issued an IC reminder letter to the responsible party on this date. Reminder system set to follow-up in five years. |
Kristin Thompson |