Site Report: Huslia Former AVEC Tank Farm

Site Name: Huslia Former AVEC Tank Farm
Address: N. Bank of Koyukuk River, Huslia, AK 99746
File Number: 820.38.004
Hazard ID: 3676
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 65.699945
Longitude: -156.399005
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

The former AVEC tank farm consisted of eight vertical tanks containing fuel oil for the city power plant owned and operated by AVEC. The tanks were contained in an unlined area bermed 3-feet high using sandbags. DRO concentrations in the soil at the former AVEC tank farm are 2,700 mg/kg, GRO concentrations are 249 mg/kg. Visual staining of surface soils and a diesel odor were observed in surface soils at the former site. Prior to relocation of the AVEC Tank Farm, the tanks and associated underground piping were in operation, in an unlined area, for a minimum of 30 years.

Action Information

Action Date Action Description DEC Staff
4/22/2003 Site Added to Database DRO contamination. Deborah Williams
4/22/2003 Site Ranked Using the AHRM Preliminary ranking. Deborah Williams
4/27/2004 Update or Other Action Site evaluation funded through TAPL funding. With loss of TAPL funds to Alaska Energy Authority, ADEC will not be able to fund work on the site at this time. Other funding sources will be evaluated as needed. Mike Jaynes
7/14/2004 Update or Other Action File number changed from 820.42.006 to 820.38.004 Sarah Cunningham
11/29/2006 Update or Other Action Staff transferred from PIkul to Jaynes. Aggie Blandford
6/25/2007 Update or Other Action ADEC staff Oelkers conducted site visit. With assistance from Mayor of Huslia, determined that this site has eroded and is no longer in existance. Major erosion occured during spring high water levels in the Koyukyk River in 2003 and 2006. Shannon Oelkers
7/3/2007 Site Closure Approved This site has eroded completely. The Koyukuk River has eroded major sections of the riverbank in Huslia. Erosion was aggravated by high water levels in 2003 and 2006. Shannon Oelkers
6/14/2018 Update or Other Action Updated GIS location due to concern about shoreline erosion. Location is based on air photo from an Oasis, 2000 report which shows facility on a 1996 air photo. Janice Wiegers

Contaminant Information

Name Level Description Media Comments
For more information about this site, contact DEC at (907) 465-5390.

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

There are no documents for this site report.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close