6/15/1985 |
Preliminary Assessment Approved |
Installation Restoration Program Preliminary Assessment - Naknek Recreation Camps (dated April 1989). Preliminary Assessment performed to identify past spill or disposal sites that posed potential and actual hazards, or both, to public health or the environment. |
Former Staff |
6/15/1987 |
Update or Other Action |
Defense Environmental Restoration Account dated 1987. Field investigation performed to address debris material inventory, POL and hazardous material inventory, and disposal sites. |
Former Staff |
6/13/1988 |
Update or Other Action |
Hazardous Materials Technical Center Assessment: recommends that construction rubble, drums and barrels be removed from site#1 landfill. Install monitoring well system and soil sampling should be done with contaminated soil removed. Site#2 removal of all drums is recommended along with previous suggestions for monitoring/sampling. Site#3 soil sampling of stained area is suggested as well as disposal/removal. |
Former Staff |
6/15/1990 |
Update or Other Action |
Reconnaissance electromagnetic survey was conducted to search for buried drums, tanks, or other debris potentially buried on site, and to assist in choosing optimal drilling sites for soil borings and soil gas sample locations. The results of the soil gas survey were used to define areas of greatest potential environmental impact. |
Former Staff |
6/15/1991 |
Update or Other Action |
Partial site assessment performed to determine the presence or absence of contaminants reportedly released to subsurface at locations identified in the preliminary assessment. |
Louis Howard |
6/15/1995 |
Site Characterization Report Approved |
Naknek Recreation Camps Remedial Investigation Report (final dated June 1995). Objective was to further define the extent of contamination in the subsurface. The generator pad was identified as a contamination source. |
Louis Howard |
9/6/1995 |
Update or Other Action |
(Old R:Base Action Code = RDRA - Remedial Design / Remedial Action). RDRA action added 02/12/1997 by Shannon and Wilson, Inc., based on Air Force Relative Risk Evaluation Worksheet dated 9/6/95. No other information available. |
S&W-Miner |
1/10/1996 |
Update or Other Action |
Human Health and Ecological Risk Assessment Workplan for Naknek Recreation Camps (draft dated June 1995, received January 1996). |
Louis Howard |
11/15/1996 |
Update or Other Action |
Aerial Photographic Analysis, King Salmon Airport Study Area. Prepared by EPA Region 10, Research and Development, Characterization, Research Division, TS-PIC-9710003S, dated November 1996. |
Gretchen Pikul |
11/25/1996 |
Risk Assessment Report Approved |
Baseline Human Health and Preliminary Ecological Risk Assessment, Naknek Recreation Camps (final dated November 1996). Results indicated some remediation is required at both sites due to contaminant concentrations exceeding risk-based standards and the potential harm to wildlife from exposure to DRO, DDT, and heavy metals. |
Gretchen Pikul |
12/3/1996 |
Update or Other Action |
Naknek Recreation Camps (Rapids Camp) Leaching Assessment (draft dated November 1996, received December 1996, no final report issued - report had many issues and Air Force did not produce a final report). |
Gretchen Pikul |
2/12/1997 |
Site Added to Database |
Site added by Shannon and Wilson, Inc. Petroleum hydrocarbon contamination. |
S&W-Miner |
8/5/1997 |
Update or Other Action |
Management Action Plan report (draft dated December 1996, received March 1997, final dated June 1997, received August 1997). |
Gretchen Pikul |
8/12/1997 |
Update or Other Action |
King Salmon Residential Well Sampling Report May 1997 Sampling Event (dated July 1997, received August 1997). |
Gretchen Pikul |
2/18/1998 |
Proposed Plan |
Rapids Camp Proposed Plan. |
Gretchen Pikul |
3/25/1998 |
Update or Other Action |
Rapids Camp Modeling to Support Remedial Alternatives (draft dated March 5, 1998, no final report received). |
Gretchen Pikul |
4/27/1998 |
Update or Other Action |
King Salmon, Naknek and South Naknek Native Villages Site Assessment Report (draft dated March 1998, received April 1998, no final received). |
Gretchen Pikul |
10/6/1998 |
Interim Removal Action Approved |
Rapids Camp workplan amendments for Interim Remedial Action (dated June 1998). |
Gretchen Pikul |
12/3/1998 |
Update or Other Action |
Remedial Action Report, Rapids Camp, Volumes 1&2 (dated September 4, 1998, received December 1998). |
Gretchen Pikul |
5/4/1999 |
Update or Other Action |
Feasibility Study, Installation Restoration Program, Naknek Recreation Camps (draft dated October 1995, final revised dated March 1997, draft dated March 1998, final dated April 1999, final insert pages received 1-18-00). |
Gretchen Pikul |
5/26/1999 |
Update or Other Action |
Intrinsic Remediation Study, King Salmon Airport, Groundwater Zone 6 (draft dated May 1999; no final produced). |
Gretchen Pikul |
10/14/1999 |
Site Ranked Using the AHRM |
Initial ranking. |
Gretchen Pikul |
6/30/2000 |
Record of Decision |
Record of Decision for Final Remedial Action, Naknek Recreation Camp 1 (Rapids Camp/Site OT032) dated April 2000, signed by ADEC on April 11, 2000, and Air Force on June 30, 2000. |
Gretchen Pikul |
10/4/2000 |
Long Term Monitoring Established |
Annual groundwater monitoring will continue at the generator site until the field and analytical data support the conclusion that contaminant levels remain below ADEC 18 AAC 75, Table C Groundwater Cleanup Levels. Monitoring may be discontinued after the five-year review and only with agency and community approval. Final Groundwater Zone 6 Work Plan received October 4. |
Holly Weiss-Racine |
10/19/2001 |
Update or Other Action |
Groundwater Zones 4 and 6 Monitoring Report (draft dated April 6, 2001 and received on April 25, 2001; ADEC comment letter dated June 6, 2001). |
Holly Weiss-Racine |
1/31/2007 |
Update or Other Action |
File number issued 2569.38.020.02. |
Aggie Blandford |
1/30/2009 |
Update or Other Action |
Well Decommissioning Report received detailing the decommissioning of several wells at the sites in the Rapids Camp area. Generator pad groundwater monitoring wells MW-11 and MW-16 were decommissioned because the contaminant levels in the groundwater had reached the applicable Remedial Action Objective. The wells were removed from the ground and the annulus filled with bentonite chips, in addition to other material. There were no comments submitted on this report. |
Holly Weiss-Racine |
7/1/2015 |
Update or Other Action |
Final Land Use Control Management Plan – Pacific Air Forces Regional Support Center Installations is published which includes the following land use controls at the Rapids Camp Generator Pad: no excavation of soils deeper than 5-feet bgs within the boundary of the former generator pad (SS004) or the former septic tanks (ST001) and no installation of drinking water wells within 100 feet of the boundary of the generator pad. |
Holly Weiss-Racine |
5/3/2016 |
Cleanup Complete Determination Issued |
A Cleanup Complete Determination for Groundwater Zone 6 and associated sites at King Salmon Divert was issued on May 3, 2016. This includes a Cleanup Complete with Institutional Controls (ICs) determination for 2569.38.020.02 - King Salmon AS Rapids Camp Gen Pad (SS004 Generator Pad), Hazard ID: 701. Long Term Monitoring of ICs will continue. |
Holly Weiss-Racine |
5/15/2018 |
Document, Report, or Work plan Review - other |
ADEC approves the 'Final 2017 Five-Year Review, King Salmon Divert, Naknek Recreation Camp I, Naknek Recreation Camp II, Alaska, November 2017' in a letter dated May 15, 2018. Land Use Controls have not been fully implemented at any groundwater zones at King Salmon Divert. Recommendations include: finalizing the decision document for Zone 7, determine the extent of drinking water wells at Lake Camp (number of wells, depth of wells, and groundwater gradient), and fully implement LUCs by updating public land records for non-USAF owned properties. The next five-year review will be completed in 2022. |
Sammi Castle |
7/7/2021 |
Update or Other Action |
Coordinates (lat/long) updated. Previous coordinates were 58.727602 -157.015936. Updated coordinates were obtained using satellite imagery and figures in 20170215 Draft 2016 3rd FYR.pdf |
Ginna Quesada |
5/18/2023 |
Site Visit |
DEC conducted a site visit with the U.S. Air Force. |
Ginna Quesada |