Use this handy calendar to figure out what you need to do to keep up with your operational requirements for your UST system. Consider printing and posting it at your UST facility.
(PDF 163K)
What must I do?
Every Day: Do these things every day the UST is in service
I am doing this every day the tank is in service
Note: Not required for emergency power generator tanks
Every Month: Make sure your tanks and pipes are safe
Checklist: Check off each month you do your monthly leak detection for tank and piping.
Every Other Month or Every 60 Days
(Only for Steel Tanks/Piping with Impressed Current Cathodic Protection)
Checklist:
Suggesting readings schedule. Check each month after you take and log your reading.
Every Year
Every 3 Years: Third Party Inspection
My next third party inspection is due _______________(Date)
The operations tags for tanks expire _______________ (Date)