Division of Spill Prevention and Response

Breadcrumbs

Unified Command Photo Gallery
Photo Date: Feb 24-27, 2012
Crews recovering muds from rig containment. Photo date 02/24/2012 Crews installing piping on end of diverter line for mud recovery after startup. Photo date 02/27/2012 Decon for exit from hot zone. Photo date 02/27/2012 Nabors sign-in shed for entry to hot zone.  Photo date 02/27/2012
Crews recovering muds from rig containment. Photo date 02/24/2012 Crews installing piping on end of diverter line for mud recovery after startup. Photo date 02/27/2012 Decon for exit from hot zone. Photo date 02/27/2012 Nabors sign-in shed for entry to hot zone. Photo date 02/27/2012
Steam manifolds and supersuckers recover fluids from inside the drillingrigs. Photo date 02/27/2012 Supersuckers recovering mud from steaming operation. Photo date 02/27/2012    
Steam manifolds and supersuckers recover fluids from inside the drillingrigs. Photo date 02/27/2012 Supersuckers recovering mud from steaming operation. Photo date 02/27/2012    

Photo Date: Feb 23-26, 2012
Excavator attachment busting mud from around diverter. Photo date 02/23/2012 Nabors crew cleaning mud from within the drill rig. Photo date 02/26/2012 Pit to place mud recovery tank in once circulation of mud starts. Photo date 02/26/2012 Section of diverter pipe has been removed and diverter pipe cleaned of mud and ice. Photo date 02/26/2012
Excavator attachment busting mud from around diverter. Photo date 02/23/2012 Nabors crew cleaning mud from within the drill rig. Photo date 02/26/2012 Pit to place mud recovery tank in once circulation of mud starts. Photo date 02/26/2012 Section of diverter pipe has been removed and diverter pipe cleaned of mud and ice. Photo date 02/26/2012

Photo Date: 02/22/2012      
Heaters pump hot air to thaw drilling rig. (Photo date 2/18/2012) Heaters pump hot air to thaw drilling rig. (Photo date 2/22/2012) Temporary storage for drilling mud removed from drill pad. (Photo date 2/22/2012) Drilling mud released out of diverter. (Photo date 2/22/2012)
Heaters pump hot air to thaw drilling rig. (Photo date 2/18/2012) Heaters pump hot air to thaw drilling rig. (Photo date 2/22/2012) Temporary storage for drilling mud removed from drill pad. (Photo date 2/22/2012) Drilling mud released out of diverter. (Photo date 2/22/2012)
Large blocks of frozen drilling mud. (Photo date 2/22/2012) Supersucker recovering waste fluids. (Photo date 2/22/2012)    
Large blocks of frozen drilling mud. (Photo date 2/22/2012) Supersucker recovering waste fluids. (Photo date 2/22/2012)    

Photo Date: 02/17/2012      
South end of pad mud-water. Mud-water off south end of pad. Suspected misting on the SW side of pad. Q2 Pad SE side mud-water.
South end of pad mud-water. South end of pad mud-water. (Photo date 2/17/2012) Mud-water off south end of pad. South end of pad mud-water. (Photo date 2/17/2012) Suspected misting on the SW side of pad. South end of pad mud-water. (Photo date 2/17/2012) Q2 Pad SE side mud-water. South end of pad mud-water. (Photo date 2/17/2012)
Mud-water on pad and tundra.      
Mud-water on pad and tundra. South end of pad mud-water. (Photo date 2/17/2012)