SWPPP Submittal Requirements (Section 2.1 of CGP)

1.1The permittee must submit a copy of the SWPPP with the electronic NOI or within seven (7) calendar days of filing the paper NOI to ADEC (ADEC, Wastewater Discharge Authorization Storm Water, 555 Cordova St, Anchorage, AK 99501) if the project is located outside the areas of the local governments described in items 1.2, 1.3, 1.4, 1.5, 1.6, and 1.7 and the project disturbs five or more acres of land.

1.2Within the Municipality of Anchorage

1.2.1An owner or operator of construction projects disturbing one or more acres of land shall submit a copy of the SWPPP to either ADEC or the Municipality based on the project type and operator as shown in the following table

Project Type: Submit SWPPP to:
Government (federal, state, or Port of Anchorage) road projects and other government transportation projects such as ports, railroads or airports ADEC
Government (municipal) road projects and other government transportation projects such as airports Municipality
Utility projects for which the utility is initiating the work Municipality
Work that requires a Building Permit Municipality
Non-publicly funded transportation projects Municipality

1.2.2Submittal of the SWPPP to the Municipality should be made before or at the same time the NOI is submitted to ADEC and shall be accompanied by any Municipality-required fee. A copy of the SWPPP shall be submitted to the Municipality at the following address:

Paul Lacsina
Municipality of Anchorage
Office of Planning Development and Public Works
4700 South Elmore Rd.
PO Box 196650
Anchorage, AK 99519-6650
343-7911
lacsinaph@muni.org
anchorgestormwater.com/staff.html

1.3In the road service areas within the urbanized area boundary of the Fairbanks North Star Borough, check with the Borough for their latest requirements in addition to the following ADEC requirement.

Ann Worhatch
Fairbanks North Star Borough
Department of Public Works
PO Box 71267
Fairbanks, AK 99707
459-1333
AWorhatch@fnsb.us
http://www.co.fairbanks.ak.us/pw/Pages/Storm-Water.aspx

1.3.1Owners or operators of publicly-funded construction projects disturbing one or more acres of land shall submit a copy of the SWPPP to ADEC for review.

1.4Within the urbanized area boundary of the City of Fairbanks, check with the city for their latest requirements in addition to the following ADEC requirement.

Andrew Ackerman
City of Fairbanks
Engineering Division
800 Cushman St
Fairbanks, AK 99701
459-6836
AAckerman@Fairbanks.us
http://www.co.fairbanks.ak.us/pw/Pages/Storm-Water.aspx

1.4.1Owners or operators of publicly-funded projects disturbing one or more acres of land shall submit a copy of the SWPPP to ADEC for review.

1.5Within the urbanized area boundary of the City of North Pole, check with the city for their latest requirements in addition to the following ADEC requirement.

Bill Butler
City of North Pole
Department of Public Works
125 Snowman Lane
North Pole, AK 99705
488-2281
bill@northpolealaska.com
http://www.co.fairbanks.ak.us/pw/Pages/Storm-Water.aspx

1.5.1Owners or operators of publicly-funded projects disturbing one or more acres of land shall submit a copy of the SWPPP to ADEC for review.

1.6 Within the Joint Base Elmendorf-Richardson (JBER), check with the Storm Water Lead for their latest requirements.

Amy Tegethoff
Water Program Manager
673rd CES/CEIC
724 Quartermaster Drive
JBER, AK 99506
384-7854
Amy.Tegethoff.ctr@us.af

1.7 Within the Port of Anchorage, check with the Operations and Maintenance Manager for their latest requirements.

Stuart Greydanus
Operations and Maintenance
2000 Anchorage Port Road
Anchorage, AK 99501
343-6202
GreydanusSB@muni.org
www.portofanc.com/about-us/port-staff

1.8 Within Fort Wainwright, check with the Storm Water Manager / Environmental Compliance Manager for their latest requirements.

Don Haas
Environmental Compliance - CSU/CEMML
DPW Environmental Division
3023 Engineer Place Fort Wainwright, AK
361-9949
donald.e.haas.ctr@mail.mil