Individual Permit Fees (18 AAC 72.957)
| TABLE F INDIVIDUAL PERMIT FEES |
| (1) Annual fee for a domestic wastewater system with a daily maximum permitted flow, in gpd, of1 |
Fee (in dollars) |
| (A) 0 - 100,000 |
470 |
| (B) 100,001 and over |
1,680 |
| (2) Annual fee for mining activities |
| (A) Permit renewals for hard rock mineral mining with chemical concentration process |
6,290 |
| (B) Mineral mining using a suction dredge with a nozzle 10 inches or greater |
1,040 |
| (3) Annual fee for seawater treatment |
1,150 |
| (4) Annual fee for power generation cooling water discharge by a facility1 |
2,130 |
| (5) Annual fee for seafood processing that is not covered under the general permit |
3,560 |
| (6) Application fee for certification under 33 U.S.C. 1341 of a “dredge-or-fill” permit issued under 33 U.S.C. 1344 (Clean Water Act, sec. 404), for2 |
| (A) Highway project |
490 |
| (B) Airport project |
490 |
| (C) Pipeline project using less than eight-inch diameter pipe |
490 |
| (D) Other projects or department activities as follows: |
| (i) waiver of certification under 33 U.S.C. 1341 |
0 |
| (ii) project disturbing less than one acre |
200 |
| (iii) project disturbing 1 - 5 acres |
490 |
| (iv) project disturbing 5.01 to 20 acres |
1,120 |
| (v) project disturbing greater than 20 acres |
2,300 |
1If the applicant is a business with fewer than 20 employees, the fee is reduced by a travel cost of $85.
2Mine projects and pipelines eight inches or greater in diameter are subject to a fee as described in 18 AAC 72.959.
|
|