All Applications (102 items)  Show/Hide Results  Excel Download *
ID Owner Stationary Source Permit Writer Current Status/Next Step Received Received Complete Fees Paid Draft to Super Start Public Notice End Public Notice Final to Super Transmit to EPA Project Classification Total Elapsed Days Modeler Processing Status Contract Status
AQ0325MSS01P NRC Alaska, LLC Moose Creek Facility Camarena, Yesenia 7/15/2021 Name Change 102 In-house
AQ0325MSS02P NRC Alaska, LLC Moose Creek Facility Camarena, Yesenia 7/15/2021 Name Change 102 In-house
AQ0166MSS02A Hilcorp North Slope, LLC Central Compressor Plant (CCP) Crutchfield, Brittany Permti on hold. EPA rejected proposed footnote revision. 10/28/2013 Revision of Terms and Conditions of AQ0166CPT04 0 In-house
AQ0264TVP03A US Air Force (Eielson) Eielson Air Force Base Crutchfield, Brittany waiting for permit application addendum from permittee 10/16/2017 Renewal 1470 In-house
AQ0267MSS10A ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 Crutchfield, Brittany Public Notice ends 10/15 5/3/2021 5/3/2021 9/15/2021 10/15/2021 H2S Limits Increase 18 AAC 50.502(b)(4),18 AAC 50.502(c)(3),18 AAC 50.508(6) 120 Jesse Jack Public Notice End 10/15/2021 In-house
AQ0267TVP01P ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 Crutchfield, Brittany 10/5/2021 Admin Amendment 20 In-house
AQ0270MSS02A Hilcorp North Slope, LLC Central Gas Facility (CGF) Crutchfield, Brittany Permti on hold. EPA rejected proposed footnote revision. 10/15/2013 Minor Amendment 0 In-house
AQ0307MSS05A US Air Force, PACAF Regional Support Center Eareckson Air Station, Shemya Island Crutchfield, Brittany 3.19.21-draft permit documents sent to supervisor for review. 3.23.21-Permittee requested minor permit be put on hold until the Title V renewal was also ready for PN. Hold period will begin once minor permit is ready for PN. 7/28/2020 7/28/2020 Minor Permit Revision 18 AAC 50.508(6) 454 Awaiting Applicant Response 03/19/2021 In-house
AQ0307TVP04A US Air Force, PACAF Regional Support Center Eareckson Air Station, Shemya Island Crutchfield, Brittany 7/28/2020 TV Renewal 454 In-house
AQ1661MSS01A Oil Search Alaska, LLC Nanushuk Operations Pad Crutchfield, Brittany 6/23/2021 Pikka Development Project 18 AAC 50.502(c)(1),18 AAC 50.508(5) 124 Jesse Jack In-house
AQ0053TVP04A Fairbanks Gold Mining Inc Fort Knox Mine Dunn, Patrick 9/28/2021 TVP Renewal 27 In-house
AQ0082TVP03A Alyeska Pipeline Service Company Valdez Marine Terminal Dunn, Patrick 2/6/2019 992 In-house
AQ0171TVP01P ConocoPhillips Alaska, Inc. CPF 3, Kuparuk Central Production Facility #3 Dunn, Patrick include in renewal - see review notes 1/22/2018 non-applicability to NSPS Subpart Kb 1372 In-house
AQ0182TVP01P Hilcorp North Slope, LLC Gathering Center #1 (GC 1) Dunn, Patrick 4/23/2019 Well Pad Disaggregation 916 In-house
AQ0182TVP01P Hilcorp North Slope, LLC Gathering Center #1 (GC 1) Dunn, Patrick 6/2/2020 Minor Modification 510 In-house
AQ0183TVP01P Hilcorp North Slope, LLC Gathering Center #2 (GC 2) Dunn, Patrick *App amendment in attachments 5.19.20 12/27/2018 Minor Modification 1033 In-house
AQ0184TVP01P Hilcorp North Slope, LLC Gathering Center #3 (GC 3) Dunn, Patrick 8/14/2019 Dissagregation of Well Pads 803 In-house
AQ0184TVP01P Hilcorp North Slope, LLC Gathering Center #3 (GC 3) Dunn, Patrick App. Received 6/9/2020 Minor Modification 503 In-house
AQ0186MSS01P Hilcorp North Slope, LLC PBU Central Power Station (CPS) Dunn, Patrick 11/3/2017 emissions unit inventory 1452 In-house
AQ0186TVP03P Hilcorp North Slope, LLC PBU Central Power Station (CPS) Dunn, Patrick 11/3/2017 Update emissions unit inventory 1452 In-house
AQ0245TVP05A Anchorage Water & Wastewater Utility John M. Asplund Water Pollution Control Facility Dunn, Patrick 10/14/2021 TV Renewal 11 In-house
AQ0267TVP01P ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 Dunn, Patrick 9/24/2019 CPF1 Minor Mod 762 In-house
AQ0268TVP01P Hilcorp North Slope, LLC Flow Station #2 (FS 2) Dunn, Patrick 6/23/2020 Minor Mod 489 In-house
AQ0271TVP03A Hilcorp North Slope, LLC Prudhoe Seawater Treatment Plant Dunn, Patrick footnote issue 4/14/2017 4/14/2017 Renewal 1655 In Completeness Review 04/14/2017 In-house
AQ0273TVP01P ConocoPhillips Alaska, Inc. CPF 2, Kuparuk Central Production Facility #2 Dunn, Patrick 1/22/2018 non-applicability of NSPS Subpart Kb 1372 In-house
AQ0433TVP04A Westward Seafoods, Inc. Dutch Harbor Seafood Processing Facility - Captain's Bay Plant Dunn, Patrick 9/22/2020 TV Renewal 398 In-house
AQ0741TVP04A Cook Inlet Energy, LLC Kustatan Production Facility Dunn, Patrick 9/30/2021 TVP Renewal 25 In-house
AQ0886TVP04A US Air Force - Joint Base Elmendorf-Richardson (JBER) Elmendorf AFB - Flight Line (SIC 45) Dunn, Patrick 10/29/2020 TV Renewal 361 In-house
AQ0009MSS05A Hilcorp Alaska, LLC Steelhead Platform Faber, Scott Supervisor review / Public notice 8/19/2014 9/11/2014 Revise and Rescind changes to BACT limit footnotes from MSS04 18 AAC 50.508(6) 2624 Draft to Super. 09/11/2014 In-house
AQ0021TVP05A Inside Passage Electric Cooperative (IPEC) Hoonah Facility Faber, Scott Supervisor review / Public notice 3/24/2021 3/24/2021 9/23/2021 10/25/2021 TV Renewal 215 Public Notice End 10/25/2021 In-house
AQ0070TVP04A Hilcorp Alaska, LLC Beaver Creek Production Facility Faber, Scott Supervisor review / Public notice 6/11/2020 TV Renewal 501 Supervisor Review 12/11/2020 In-house
AQ0082MSS04A Alyeska Pipeline Service Company Valdez Marine Terminal Faber, Scott 2/6/2019 Revisions to construction permit 082CP05 18 AAC 50.508(6) 992 In-house
AQ0082TVP03A Alyeska Pipeline Service Company Valdez Marine Terminal Faber, Scott Supervisor review of response to comments / EPA review 7/14/2016 7/14/2016 5/31/2017 6/30/2017 Renewal 1929 Supervisor Review 07/18/2017 In-house
AQ0094TVP04A Hilcorp Alaska, LLC Kenai Gas Field 14-6 Pad Faber, Scott Drafting permit / Supervisor review 9/26/2018 TVP Renewal 1125 In-house
AQ0098TVP04A Alyeska Pipeline Service Company PS #05, TAPS Pump Station Faber, Scott Supervisor review / Public notice 9/17/2020 TV Renewal 403 Supervisor Review 06/29/2021 In-house
AQ0170TVP03A Hilcorp North Slope, LLC Seawater Injection Plant East (SIPE) Faber, Scott PN draft ready for supervisor review. No further work until the BACT full load issue is resolved. 11/12/2014 11/12/2014 10/23/2015 Renewal 2539 Supervisor Review 10/23/2015 In-house
AQ0186TVP04A Hilcorp North Slope, LLC PBU Central Power Station (CPS) Faber, Scott 8/9/2021 TVP Renewal 77 In-house
AQ0191TVP04A Barrow Utilities & Electric Cooperative, Inc. Barrow Power Plant Faber, Scott Supervisor review of response to comments / EPA review 9/17/2018 7/14/2021 8/13/2021 TVP Renewal 1134 Supervisor Review 09/10/2021 In-house
AQ0200TVP03A Hilcorp Alaska, LLC Milne Point Production Facility (MPU) Faber, Scott Supervisor review of response to comments/EPA review 6/19/2017 6/19/2017 8/2/2019 9/3/2019 Renewal 1589 Supervisor Review 10/01/2019 In-house
AQ0214MSS02A Nushagak Electric Cooperative, Inc Dillingham Power Plant Faber, Scott Supervisor review / Public notice 6/16/2017 11/30/2020 12/30/2020 PAL Renewal 919 Public Notice End 12/30/2020 In-house
AQ0214TVP03P Nushagak Electric Cooperative, Inc Dillingham Power Plant Faber, Scott Drafting permit / Supervisor review. Integrated review with MSS02 9/25/2017 review of revisions from minor application 1491 In-house
AQ0214TVP04A Nushagak Electric Cooperative, Inc Dillingham Power Plant Faber, Scott Supervisor review of response to comments/EPA review 2/11/2020 11/30/2020 12/30/2020 TV Renewal 622 Public Notice End 12/30/2020 In-house
AQ0225TVP05A Alaska Power & Telephone Tok Power Generating Station Faber, Scott Supervisor review / Public notice 9/28/2020 9/28/2020 TV Renewal 392 Supervisor Review 12/23/2020 In-house
AQ0274TVP03A Hilcorp North Slope, LLC Prudhoe Bay Operations Center / Main Construction Camp (PBOC/MCC) Faber, Scott Supervisor review / Public notice 6/26/2015 6/26/2015 Renewal 2313 Supervisor Review 06/21/2018 In-house
AQ0311TVP02P Petro Star, Inc. Petro Star Valdez Refinery Faber, Scott Supervisor review 12/11/2015 EU ID 1 redundency correction 2145 Supervisor Review 04/08/2016 In-house
AQ0489TVP03A ConocoPhillips Alaska, Inc. Alpine Central Processing Facility Faber, Scott Preparing draft permit / Supervisor review 7/31/2020 7/31/2020 TV Renewal 451 In Completeness Review 07/31/2020 In-house
AQ0696TVP04A Cook Inlet Energy, LLC Osprey Platform Faber, Scott Preparing draft permit / Supervisor review 11/4/2020 11/4/2020 TV Renewal 355 In Completeness Review 11/04/2020 In-house
AQ0880TVP04A Golden Valley Electric Association Delta Power Plant Faber, Scott Supervisor review / Public notice 6/30/2021 TV Renewal 117 Supervisor Review 08/13/2021 In-house
AQ1189TVP02A Alaska Electric and Energy Cooperative Soldotna Combustion Turbine Plant Faber, Scott Supervisor review / EPA review 2/25/2020 2/25/2020 5/12/2021 6/11/2021 7/15/2021 TV Renewal 608 EPA Review End 08/30/2021 In-house
AQ1190TVP03A Alaska Electric and Energy Cooperative Nikiski Combined Cycle Plant Faber, Scott Supervisor review of response to comments/EPA review 9/9/2019 9/9/2019 2/19/2021 3/22/2021 TVP Renewal 777 Public Notice End 03/22/2021 In-house
AQ1527TVP01A Hilcorp Alaska, LLC Milne Point L-Pad Faber, Scott Supervisor review of response to comments/EPA review 4/3/2019 9/17/2019 10/17/2019 MPU L-Pad 936 Supervisor Review 11/01/2019 In-house
AQ0033TVP03P Tesoro Alaska Company, LLC Kenai Pipeline (KPL) Facility Germain, Grace Drafting Permit 3/29/2017 Integrated review of MSS07 (Consent Decree Conditions) 1671 In-house
AQ0033TVP04A Tesoro Alaska Company, LLC Kenai Pipeline (KPL) Facility Germain, Grace Drafting Permit and SOB 12/15/2020 TV Renewal 314 In-house
AQ0035MSS07A Tesoro Alaska Company, LLC Kenai Refinery Germain, Grace Drafting Permit 3/29/2017 Incorporation of consent decree requirements - integrated review with renewal TV Permit AQ0035TVP03 1671 In-house
AQ0035TVP02P Tesoro Alaska Company, LLC Kenai Refinery Germain, Grace Intended to be included in renewal permit AQ0035TVP03 5/4/2020 Minor Modification 539 In-house
AQ0035TVP03A Tesoro Alaska Company, LLC Kenai Refinery Germain, Grace Sent draft permit and SOB for a pre-PN review 1/17/2017 Renewal - to incorporate MSS07 - MSS09 1695 Awaiting Applicant Response 09/09/2021 In-house
AQ0036TVP03P Tesoro Logistics Operations, LLC Nikiski Terminal Germain, Grace Drafting Permit 3/31/2017 incorporation of MSS07 consent decree requirements 1669 In-house
AQ0036TVP04A Tesoro Logistics Operations, LLC Nikiski Terminal Germain, Grace 12/2/2020 TVP Renewal 327 In-house
AQ0270TVP01P Hilcorp North Slope, LLC Central Gas Facility (CGF) Germain, Grace 4/21/2020 Minor Modification 552 In-house
AQ0316TVP03A University of Alaska Fairbanks Campus Power Plant Germain, Grace EPA 45-day Review 6/27/2012 8/27/2012 6/3/2021 7/5/2021 9/7/2021 TVP Renewal 2490 EPA Review End 10/22/2021 In-house
AQ0911TVP03A Eni US Operating Co. Inc. Oooguruk Development Project Germain, Grace 2/24/2021 TV Renewal 243 In-house
AQ1669ORL01A Crowley Fuels LLC (formerly CPD Alaska LLC) Bethel Bulk Fuel Terminal Germain, Grace Final ORL sent to Crowley for signature 5/11/2021 5/12/2021 7/12/2021 8/13/2021 Bethel Bulk Fuel Terminal 18 AAC 50.225 139 Awaiting Applicant Response 09/03/2021 In-house
AQ0091TVP03A Hilcorp Alaska, LLC Tyonek Platform Jack, Jesse Engineer preparing draft 9/27/2013 10/8/2013 TVP Renewal 2939 In Completeness Review 10/08/2013 In-house
AQ0181TVP03A Hilcorp Alaska, LLC Endicott Production Facility (END) Jack, Jesse Next: Completeness Review 7/14/2017 Renewal 1564 In-house
AQ0072TVP04A Alyeska Pipeline Service Company PS #01, TAPS Pump Station Jones, David 2/6/2020 9/14/2021 10/14/2021 TV Renewal 627 Public Notice End 10/14/2021 In-house
AQ0074TVP04A Alyeska Pipeline Service Company PS #03, TAPS Pump Station Jones, David 11/4/2020 9/14/2021 10/14/2021 TV Renewal 355 Public Notice End 10/14/2021 In-house
AQ0075TVP04A Alyeska Pipeline Service Company PS #04, TAPS Pump Station Jones, David 11/19/2020 9/14/2021 10/14/2021 340 Public Notice End 10/14/2021 In-house
AQ0087TVP04P Hilcorp Alaska, LLC Kenai Gas Field Pad 34-31 Jones, David 9/8/2021 Minor Modification 46 In-house
AQ0837TVP03A Mystery Creek Resources, Inc. Nixon Fork Mine, McGrath Jones, David 7/6/2021 TVP Renewal 110 In-house
AQ1201TVP02A ExxonMobil Alaska Production Inc. Point Thomson Production Facility Jones, David 8/16/2021 TVP Renewal 70 In-house
AQ1539CPT01A Alaska Gasline Development Corporation Liquefaction Plant Jones, David Incompleteness Letter sent to Applicant. Draft Preliminary Permit Documents 5/1/2018 9/11/2020 12/10/2020 Alaska LNG 18 AAC 50.306 571 James Renovatio Public Notice End 12/10/2020 In-house
AQ0302TVP04A Hecla Greens Creek Mining Company (HGCMC) Hecla Greens Creek Mine Klina, Joshua 11/10/2020 TV Renewal 349 In-house
AQ0326TVP04A Hilcorp Alaska, LLC Granite Point Tank Farm Klina, Joshua 8/24/2021 TVP Renewal 62 In-house
AQ0058TVP03A Hilcorp Alaska, LLC Trading Bay Mulkey, Kathie on hold pending EPA guidance for reclass of CISWI 2/16/2018 Initial 79 In-house
AQ0164TVP04A Chugach Electric Association International Station Power Plant Mulkey, Kathie drafting permit/ supervisor review 11/19/2020 TV Renewal 340 In-house
AQ0196MSS09A Kotzebue Electric Association Kotzebue Power Plant Mulkey, Kathie supervisor review/PN 4/22/2021 8/5/2021 9/7/2021 9/10/2021 Kotzebue Power Plant Minor Permit Revision 18 AAC 50.508(6) 126 EPA Review End 10/25/2021 In-house
AQ0196TVP03P Kotzebue Electric Association Kotzebue Power Plant Mulkey, Kathie waiting for MSS09 4/22/2021 to incorporate MSS09 186 In-house
AQ0196TVP04A Kotzebue Electric Association Kotzebue Power Plant Mulkey, Kathie 7/6/2021 TVP Renewal 111 In-house
AQ0243TVP05A Peter Pan Seafood Company, LLC King Cove Facility Mulkey, Kathie 6/24/2021 TVP Renewal 123 In-house
AQ0289TVP04A Teck Alaska, Inc. (Teck) DMTS Port Facility Mulkey, Kathie review app/draft permit 5/3/2021 TV Renewal 175 In-house
AQ0311TVP03A Petro Star, Inc. Petro Star Valdez Refinery Mulkey, Kathie PN ends 10/11 3/20/2020 9/9/2021 10/11/2021 TV Renewal 584 Public Notice End 10/11/2021 In-house
AQ0881TVP01A Hilcorp Alaska, LLC MGS Onshore Facility Mulkey, Kathie on hold pending EPA guidance for reclass of CISWI 7/12/2021 MWJ: see " Hold Periods (2) Notes" 2/16/2018 Initial for incinerator 79 In-house
AQ0942TVP01P Hilcorp Alaska, LLC Beluga River Unit Mulkey, Kathie see review notes 2/9/2018 Incinerator Reclassification 1354 In-house
AQ0942TVP02A Hilcorp Alaska, LLC Beluga River Unit Mulkey, Kathie see review notes 7/9/2018 TVP Renewal 1204 In-house
AQ1086TVP02A Matanuska Electric Association, Inc Eklutna Generation Station Mulkey, Kathie drafting permit/supervisor review 12/14/2020 TV Renewal 315 In-house
AQ1121TVP03A Doyon Utilities, LLC Fort Wainwright (Privatized Emission Units) Mulkey, Kathie supervisor review/EPA 5/3/2019 4/22/2021 5/25/2021 TVP Renewal 906 Supervisor Review 06/07/2021 In-house
AQ0088TVP05A UniSea, Inc. Dutch Harbor Seafood Processing Plant Renovatio , James 9/10/2021 TVP Renewal 45 In-house
AQ0166TVP02A Hilcorp North Slope, LLC Central Compressor Plant (CCP) Siddeek, Zeena Working RTC and EPA/45 version. 3/6/2008 5/30/2008 7/23/2008 9/13/2013 10/29/2013 9/9/2013 TVP Renewal 4896 Public Notice End 10/29/2013 In-house
AQ0171TVP02A ConocoPhillips Alaska, Inc. CPF 3, Kuparuk Central Production Facility #3 Siddeek, Zeena App Addendum for renewal application received 7/3/2007 12/6/2010 Renewal 5228 Draft to Super. 12/06/2010 In-house
AQ0182TVP02A Hilcorp North Slope, LLC Gathering Center #1 (GC 1) Siddeek, Zeena 5/21/2008 4/28/2009 11/2/2011 4/19/2012 6/18/2012 4/9/2012 TV Renewal 4563 Public Notice End 06/18/2012 In-house
AQ0183TVP02A Hilcorp North Slope, LLC Gathering Center #2 (GC 2) Siddeek, Zeena 5/28/2008 11/2/2011 4/19/2012 6/4/2012 4/9/2012 TV Renewal 4898 Public Notice End 06/04/2012 In-house
AQ0184TVP02A Hilcorp North Slope, LLC Gathering Center #3 (GC 3) Siddeek, Zeena Working PN2 draft. 7/1/2008 8/7/2008 11/2/2011 4/19/2012 5/21/2012 4/9/2012 TVP Renewal 4827 Public Notice End 05/21/2012 In-house
AQ0267TVP02A ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 Siddeek, Zeena Submitted EPA objection counter-proposal to CPAI 070314. Awaiting response. 11/19/2007 6/17/2011 11/29/2012 12/31/2012 6/27/2011 TV Renewal 5089 Awaiting Applicant Response 07/03/2014 In-house
AQ0268TVP02A Hilcorp North Slope, LLC Flow Station #2 (FS 2) Siddeek, Zeena Withdrawing from EPA/45 to solve PSD BACT. 6/11/2008 11/30/2012 5/20/2013 6/19/2013 5/8/2013 TVP renewal 4884 Awaiting Applicant Response 04/16/2014 In-house
AQ0269TVP02A Hilcorp North Slope, LLC Flow Station #3 (FS 3) Siddeek, Zeena Withdrawing from EPA/45 to solve PSD BACT. 10/2/2007 2/18/2009 6/11/2013 7/11/2013 6/4/2013 FS #3 TV Renewal 5137 Awaiting Applicant Response 04/16/2014 In-house
AQ0270TVP02A Hilcorp North Slope, LLC Central Gas Facility (CGF) Siddeek, Zeena PN draft sent to JNU admin 3/6/2008 5/6/2008 5/17/2013 8/29/2013 10/15/2013 8/27/2013 TVP Renewal 4920 Public Notice End 10/15/2013 In-house
AQ0273TVP02A ConocoPhillips Alaska, Inc. CPF 2, Kuparuk Central Production Facility #2 Siddeek, Zeena 6/25/2007 Renewal 5236 Begin Work 04/04/2008 In-house
AQ0094MSS01A Hilcorp Alaska, LLC Kenai Gas Field 14-6 Pad Simpson, Aaron 6/12/2019 PSD Limit Revision 18 AAC 50.508(6) 393 In-house
AQ0167TVP03A Hilcorp North Slope, LLC Flow Station #1 (FS 1) Simpson, Aaron PN draft ready for supervisor review. No further work till the BACT full load issue is resolved. 4/19/2017 4/28/2017 Renewal 1640 In Completeness Review 04/28/2017 In-house
AQ0172TVP03A ConocoPhillips Alaska, Inc. Kuparuk Seawater Treatment Plant (STP) Simpson, Aaron BACT table contains footnotes on full load. No further work expected till footnote issue is resolved. 8/29/2013 9/20/2013 8/28/2014 TVP Renewal 2956 Draft to Super. 08/28/2014 In-house
AQ0272TVP03A Hilcorp North Slope, LLC Lisburne Production Center (LPC) Simpson, Aaron Sent draft PN permit to supervisor for review 11/1/16. Held up by footnote issues 8/1/2016 8/1/2016 Renewal 1911 In Completeness Review 08/01/2016 In-house
AQ0855TVP04A Titan Alaska LNG, LLC (formerly Fairbanks Natural Gas, LLC) Titan Alaska LNG, LLC Simpson, Aaron 12/3/2020 TV Renewal 326 In-house

Title I Applications Only (16 items)  Show/Hide Results  Excel Download *
Owner Stationary Source ID Project Classification Received Received Complete Fees Paid Total Elapsed Days Start Public Notice End Public Notice Engineer Modeler Processing Status Contract Status Current Status/Next Step
Hilcorp North Slope, LLC PBU Central Power Station (CPS) AQ0186MSS01P emissions unit inventory 11/3/2017 1452 Patrick Dunn In-house
Hilcorp North Slope, LLC Central Compressor Plant (CCP) AQ0166MSS02A Revision of Terms and Conditions of AQ0166CPT04 10/28/2013 0 Brittany Crutchfield In-house Permti on hold. EPA rejected proposed footnote revision.
Hilcorp North Slope, LLC Central Gas Facility (CGF) AQ0270MSS02A Minor Amendment 10/15/2013 0 Brittany Crutchfield In-house Permti on hold. EPA rejected proposed footnote revision.
Hilcorp Alaska, LLC Steelhead Platform AQ0009MSS05A Revise and Rescind changes to BACT limit footnotes from MSS04 18 AAC 50.508(6) 8/19/2014 2624 Scott Faber Draft To Super 9/11/2014 In-house Supervisor review / Public notice
NRC Alaska, LLC Moose Creek Facility AQ0325MSS01P Name Change 7/15/2021 102 Yesenia Camarena In-house
Tesoro Alaska Company, LLC Kenai Refinery AQ0035MSS07A Incorporation of consent decree requirements - integrated review with renewal TV Permit AQ0035TVP03 3/29/2017 1671 Grace Germain In-house Drafting Permit
Nushagak Electric Cooperative, Inc Dillingham Power Plant AQ0214MSS02A PAL Renewal 6/16/2017 919 11/30/2020 12/30/2020 Scott Faber Public Notice End 12/30/2020 In-house Supervisor review / Public notice
Alaska Gasline Development Corporation Liquefaction Plant AQ1539CPT01A Alaska LNG 18 AAC 50.306 5/1/2018 571 9/11/2020 12/10/2020 David Jones James Renovatio Public Notice End 12/10/2020 In-house Incompleteness Letter sent to Applicant. Draft Preliminary Permit Documents
NRC Alaska, LLC Moose Creek Facility AQ0325MSS02P Name Change 7/15/2021 102 Yesenia Camarena In-house
Alyeska Pipeline Service Company Valdez Marine Terminal AQ0082MSS04A Revisions to construction permit 082CP05 18 AAC 50.508(6) 2/6/2019 992 Scott Faber In-house
Hilcorp Alaska, LLC Kenai Gas Field 14-6 Pad AQ0094MSS01A PSD Limit Revision 18 AAC 50.508(6) 6/12/2019 393 Aaron Simpson In-house
US Air Force, PACAF Regional Support Center Eareckson Air Station, Shemya Island AQ0307MSS05A Minor Permit Revision 18 AAC 50.508(6) 7/28/2020 7/28/2020 454 Brittany Crutchfield In-house 3.19.21-draft permit documents sent to supervisor for review. 3.23.21-Permittee requested minor permit be put on hold until the Title V renewal was also ready for PN. Hold period will begin once minor permit is ready for PN.
Kotzebue Electric Association Kotzebue Power Plant AQ0196MSS09A Kotzebue Power Plant Minor Permit Revision 18 AAC 50.508(6) 4/22/2021 126 8/5/2021 9/7/2021 Kathie Mulkey EPA Review End 10/25/2021 In-house supervisor review/PN
ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 AQ0267MSS10A H2S Limits Increase 18 AAC 50.502(b)(4),18 AAC 50.502(c)(3),18 AAC 50.508(6) 5/3/2021 5/3/2021 120 9/15/2021 10/15/2021 Brittany Crutchfield Jesse Jack Public Notice End 10/15/2021 In-house Public Notice ends 10/15
Crowley Fuels LLC (formerly CPD Alaska LLC) Bethel Bulk Fuel Terminal AQ1669ORL01A Bethel Bulk Fuel Terminal 18 AAC 50.225 5/11/2021 5/12/2021 139 7/12/2021 8/13/2021 Grace Germain Public Notice End 8/13/2021 In-house Final ORL sent to Crowley for signature
Oil Search Alaska, LLC Nanushuk Operations Pad AQ1661MSS01A Pikka Development Project 18 AAC 50.502(c)(1),18 AAC 50.508(5) 6/23/2021 124 Brittany Crutchfield Jesse Jack In-house


Title V Applications Only (86 items)  Show/Hide Results  Excel Download *
Source ID ID Owner Stationary Source Received Received Complete Fees Paid Begin Work Draft to Super Start Public Notice End Public Notice Final to Super Transmit to EPA Facility Inspector PRT Assignment Comment
270 AQ0270TVP01P Hilcorp North Slope, LLC Central Gas Facility (CGF) 4/21/2020 Denise Wiltse Grace Germain
268 AQ0268TVP01P Hilcorp North Slope, LLC Flow Station #2 (FS 2) 6/23/2020 Samantha Hoover Patrick Dunn
182 AQ0182TVP01P Hilcorp North Slope, LLC Gathering Center #1 (GC 1) 4/23/2019 Samantha Hoover Patrick Dunn
182 AQ0182TVP01P Hilcorp North Slope, LLC Gathering Center #1 (GC 1) 6/2/2020 Samantha Hoover Patrick Dunn
183 AQ0183TVP01P Hilcorp North Slope, LLC Gathering Center #2 (GC 2) 12/27/2018 Rachel McKenna Patrick Dunn *App amendment in attachments 5.19.20
184 AQ0184TVP01P Hilcorp North Slope, LLC Gathering Center #3 (GC 3) 8/14/2019 Anna Roller Patrick Dunn
184 AQ0184TVP01P Hilcorp North Slope, LLC Gathering Center #3 (GC 3) 6/9/2020 Anna Roller Patrick Dunn App. Received
267 AQ0267TVP01P ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 9/24/2019 Cory McDonald Patrick Dunn
267 AQ0267TVP01P ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 10/5/2021 Cory McDonald Brittany Crutchfield
273 AQ0273TVP01P ConocoPhillips Alaska, Inc. CPF 2, Kuparuk Central Production Facility #2 1/22/2018 Cory McDonald Patrick Dunn
171 AQ0171TVP01P ConocoPhillips Alaska, Inc. CPF 3, Kuparuk Central Production Facility #3 1/22/2018 Cory McDonald Patrick Dunn include in renewal - see review notes
273 AQ0273TVP02A ConocoPhillips Alaska, Inc. CPF 2, Kuparuk Central Production Facility #2 6/25/2007 4/4/2008 Cory McDonald Zeena Siddeek
171 AQ0171TVP02A ConocoPhillips Alaska, Inc. CPF 3, Kuparuk Central Production Facility #3 7/3/2007 4/4/2008 12/6/2010 Cory McDonald Zeena Siddeek App Addendum for renewal application received
269 AQ0269TVP02A Hilcorp North Slope, LLC Flow Station #3 (FS 3) 10/2/2007 6/18/2008 2/18/2009 6/11/2013 7/11/2013 6/4/2013 Samantha Hoover Zeena Siddeek Withdrawing from EPA/45 to solve PSD BACT.
267 AQ0267TVP02A ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 11/19/2007 4/4/2008 6/17/2011 11/29/2012 12/31/2012 6/27/2011 Cory McDonald Zeena Siddeek Submitted EPA objection counter-proposal to CPAI 070314. Awaiting response.
35 AQ0035TVP02P Tesoro Alaska Company, LLC Kenai Refinery 5/4/2020 Alan Pefley Grace Germain Intended to be included in renewal permit AQ0035TVP03
166 AQ0166TVP02A Hilcorp North Slope, LLC Central Compressor Plant (CCP) 3/6/2008 5/30/2008 7/23/2008 9/13/2013 10/29/2013 9/9/2013 Denise Wiltse Zeena Siddeek Working RTC and EPA/45 version.
270 AQ0270TVP02A Hilcorp North Slope, LLC Central Gas Facility (CGF) 3/6/2008 5/6/2008 5/20/2008 5/17/2013 8/29/2013 10/15/2013 8/27/2013 Denise Wiltse Zeena Siddeek PN draft sent to JNU admin
182 AQ0182TVP02A Hilcorp North Slope, LLC Gathering Center #1 (GC 1) 5/21/2008 4/28/2009 7/29/2009 11/2/2011 4/19/2012 6/18/2012 4/9/2012 Samantha Hoover Zeena Siddeek
183 AQ0183TVP02A Hilcorp North Slope, LLC Gathering Center #2 (GC 2) 5/28/2008 7/29/2009 11/2/2011 4/19/2012 6/4/2012 4/9/2012 Rachel McKenna Zeena Siddeek
268 AQ0268TVP02A Hilcorp North Slope, LLC Flow Station #2 (FS 2) 6/11/2008 8/4/2009 11/30/2012 5/20/2013 6/19/2013 5/8/2013 Samantha Hoover Zeena Siddeek Withdrawing from EPA/45 to solve PSD BACT.
184 AQ0184TVP02A Hilcorp North Slope, LLC Gathering Center #3 (GC 3) 7/1/2008 8/7/2008 7/29/2009 11/2/2011 4/19/2012 5/21/2012 4/9/2012 Anna Roller Zeena Siddeek Working PN2 draft.
311 AQ0311TVP02P Petro Star, Inc. Petro Star Valdez Refinery 12/11/2015 Shawn Osborn Scott Faber Supervisor review
316 AQ0316TVP03A University of Alaska Fairbanks Campus Power Plant 6/27/2012 8/27/2012 8/27/2012 6/3/2021 7/5/2021 9/7/2021 Nilima Hullavarad Grace Germain EPA 45-day Review
942 AQ0942TVP01P Hilcorp Alaska, LLC Beluga River Unit 2/9/2018 Anna Roller Kathie Mulkey see review notes
172 AQ0172TVP03A ConocoPhillips Alaska, Inc. Kuparuk Seawater Treatment Plant (STP) 8/29/2013 9/20/2013 10/14/2013 8/28/2014 Cory McDonald Aaron Simpson BACT table contains footnotes on full load. No further work expected till footnote issue is resolved.
196 AQ0196TVP03P Kotzebue Electric Association Kotzebue Power Plant 4/22/2021 Shawn Osborn Kathie Mulkey waiting for MSS09
91 AQ0091TVP03A Hilcorp Alaska, LLC Tyonek Platform 9/27/2013 10/8/2013 Rachel McKenna Jesse Jack Engineer preparing draft
33 AQ0033TVP03P Tesoro Alaska Company, LLC Kenai Pipeline (KPL) Facility 3/29/2017 Alan Pefley Grace Germain Drafting Permit
214 AQ0214TVP03P Nushagak Electric Cooperative, Inc Dillingham Power Plant 9/25/2017 Rachel McKenna Scott Faber Drafting permit / Supervisor review. Integrated review with MSS02
170 AQ0170TVP03A Hilcorp North Slope, LLC Seawater Injection Plant East (SIPE) 11/12/2014 11/12/2014 8/6/2015 10/23/2015 Nilima Hullavarad Scott Faber PN draft ready for supervisor review. No further work until the BACT full load issue is resolved.
186 AQ0186TVP03P Hilcorp North Slope, LLC PBU Central Power Station (CPS) 11/3/2017 Samantha Hoover Patrick Dunn
274 AQ0274TVP03A Hilcorp North Slope, LLC Prudhoe Bay Operations Center / Main Construction Camp (PBOC/MCC) 6/26/2015 6/26/2015 1/14/2016 Denise Wiltse Scott Faber Supervisor review / Public notice
36 AQ0036TVP03P Tesoro Logistics Operations, LLC Nikiski Terminal 3/31/2017 Alan Pefley Grace Germain Drafting Permit
82 AQ0082TVP03A Alyeska Pipeline Service Company Valdez Marine Terminal 7/14/2016 7/14/2016 5/31/2017 6/30/2017 Moses Coss Scott Faber Supervisor review of response to comments / EPA review
82 AQ0082TVP03A Alyeska Pipeline Service Company Valdez Marine Terminal 2/6/2019 Moses Coss Patrick Dunn
272 AQ0272TVP03A Hilcorp North Slope, LLC Lisburne Production Center (LPC) 8/1/2016 8/1/2016 Denise Wiltse Aaron Simpson Sent draft PN permit to supervisor for review 11/1/16. Held up by footnote issues
35 AQ0035TVP03A Tesoro Alaska Company, LLC Kenai Refinery 1/17/2017 Alan Pefley Grace Germain Sent draft permit and SOB for a pre-PN review
271 AQ0271TVP03A Hilcorp North Slope, LLC Prudhoe Seawater Treatment Plant 4/14/2017 4/14/2017 Elizabeth Chiesa Patrick Dunn footnote issue
167 AQ0167TVP03A Hilcorp North Slope, LLC Flow Station #1 (FS 1) 4/19/2017 4/28/2017 Samantha Hoover Aaron Simpson PN draft ready for supervisor review. No further work till the BACT full load issue is resolved.
200 AQ0200TVP03A Hilcorp Alaska, LLC Milne Point Production Facility (MPU) 6/19/2017 6/19/2017 8/2/2019 9/3/2019 Cory McDonald Scott Faber Supervisor review of response to comments/EPA review
181 AQ0181TVP03A Hilcorp Alaska, LLC Endicott Production Facility (END) 7/14/2017 Cory McDonald Jesse Jack Next: Completeness Review
264 AQ0264TVP03A US Air Force (Eielson) Eielson Air Force Base 10/16/2017 Elizabeth Chiesa Brittany Crutchfield waiting for permit application addendum from permittee
58 AQ0058TVP03A Hilcorp Alaska, LLC Trading Bay 2/16/2018 Rachel McKenna Kathie Mulkey on hold pending EPA guidance for reclass of CISWI
881 AQ0881TVP01A Hilcorp Alaska, LLC MGS Onshore Facility 2/16/2018 Monique Witsel Jacoby Kathie Mulkey on hold pending EPA guidance for reclass of CISWI 7/12/2021 MWJ: see " Hold Periods (2) Notes"
942 AQ0942TVP02A Hilcorp Alaska, LLC Beluga River Unit 7/9/2018 Anna Roller Kathie Mulkey see review notes
191 AQ0191TVP04A Barrow Utilities & Electric Cooperative, Inc. Barrow Power Plant 9/17/2018 7/14/2021 8/13/2021 Shawn Osborn Scott Faber Supervisor review of response to comments / EPA review
94 AQ0094TVP04A Hilcorp Alaska, LLC Kenai Gas Field 14-6 Pad 9/26/2018 Alan Pefley Scott Faber Drafting permit / Supervisor review
1527 AQ1527TVP01A Hilcorp Alaska, LLC Milne Point L-Pad 4/3/2019 9/17/2019 10/17/2019 Cory McDonald Scott Faber Supervisor review of response to comments/EPA review
1121 AQ1121TVP03A Doyon Utilities, LLC Fort Wainwright (Privatized Emission Units) 5/3/2019 4/22/2021 5/25/2021 Elizabeth Chiesa Kathie Mulkey supervisor review/EPA
1190 AQ1190TVP03A Alaska Electric and Energy Cooperative Nikiski Combined Cycle Plant 9/9/2019 9/9/2019 2/19/2021 3/22/2021 Alan Pefley Scott Faber Supervisor review of response to comments/EPA review
87 AQ0087TVP04P Hilcorp Alaska, LLC Kenai Gas Field Pad 34-31 9/8/2021 Alan Pefley David Jones
214 AQ0214TVP04A Nushagak Electric Cooperative, Inc Dillingham Power Plant 2/11/2020 11/30/2020 12/30/2020 Rachel McKenna Scott Faber Supervisor review of response to comments/EPA review
72 AQ0072TVP04A Alyeska Pipeline Service Company PS #01, TAPS Pump Station 2/6/2020 9/14/2021 10/14/2021 Nilima Hullavarad David Jones
1189 AQ1189TVP02A Alaska Electric and Energy Cooperative Soldotna Combustion Turbine Plant 2/25/2020 2/25/2020 5/12/2021 6/11/2021 7/15/2021 Alan Pefley Scott Faber Supervisor review / EPA review
311 AQ0311TVP03A Petro Star, Inc. Petro Star Valdez Refinery 3/20/2020 9/9/2021 10/11/2021 Shawn Osborn Kathie Mulkey PN ends 10/11
70 AQ0070TVP04A Hilcorp Alaska, LLC Beaver Creek Production Facility 6/11/2020 Alan Pefley Scott Faber Supervisor review / Public notice
307 AQ0307TVP04A US Air Force, PACAF Regional Support Center Eareckson Air Station, Shemya Island 7/28/2020 Rachel McKenna Brittany Crutchfield
489 AQ0489TVP03A ConocoPhillips Alaska, Inc. Alpine Central Processing Facility 7/31/2020 7/31/2020 Cory McDonald Scott Faber Preparing draft permit / Supervisor review
433 AQ0433TVP04A Westward Seafoods, Inc. Dutch Harbor Seafood Processing Facility - Captain's Bay Plant 9/22/2020 Alan Pefley Patrick Dunn
98 AQ0098TVP04A Alyeska Pipeline Service Company PS #05, TAPS Pump Station 9/17/2020 Nilima Hullavarad Scott Faber Supervisor review / Public notice
225 AQ0225TVP05A Alaska Power & Telephone Tok Power Generating Station 9/28/2020 9/28/2020 Nilima Hullavarad Scott Faber Supervisor review / Public notice
886 AQ0886TVP04A US Air Force - Joint Base Elmendorf-Richardson (JBER) Elmendorf AFB - Flight Line (SIC 45) 10/29/2020 Samantha Hoover Patrick Dunn
696 AQ0696TVP04A Cook Inlet Energy, LLC Osprey Platform 11/4/2020 11/4/2020 Alan Pefley Scott Faber Preparing draft permit / Supervisor review
74 AQ0074TVP04A Alyeska Pipeline Service Company PS #03, TAPS Pump Station 11/4/2020 9/14/2021 10/14/2021 Nilima Hullavarad David Jones
302 AQ0302TVP04A Hecla Greens Creek Mining Company (HGCMC) Hecla Greens Creek Mine 11/10/2020 Monique Witsel Jacoby Joshua Klina
164 AQ0164TVP04A Chugach Electric Association International Station Power Plant 11/19/2020 Sadie Gunter Kathie Mulkey drafting permit/ supervisor review
75 AQ0075TVP04A Alyeska Pipeline Service Company PS #04, TAPS Pump Station 11/19/2020 9/14/2021 10/14/2021 Nilima Hullavarad David Jones
36 AQ0036TVP04A Tesoro Logistics Operations, LLC Nikiski Terminal 12/2/2020 Alan Pefley Grace Germain
855 AQ0855TVP04A Titan Alaska LNG, LLC (formerly Fairbanks Natural Gas, LLC) Titan Alaska LNG, LLC 12/3/2020 Sadie Gunter Aaron Simpson
33 AQ0033TVP04A Tesoro Alaska Company, LLC Kenai Pipeline (KPL) Facility 12/15/2020 Alan Pefley Grace Germain Drafting Permit and SOB
1086 AQ1086TVP02A Matanuska Electric Association, Inc Eklutna Generation Station 12/14/2020 Anna Roller Kathie Mulkey drafting permit/supervisor review
911 AQ0911TVP03A Eni US Operating Co. Inc. Oooguruk Development Project 2/24/2021 Amanda Compton Grace Germain
21 AQ0021TVP05A Inside Passage Electric Cooperative (IPEC) Hoonah Facility 3/24/2021 3/24/2021 9/23/2021 10/25/2021 Amanda Compton Scott Faber Supervisor review / Public notice
289 AQ0289TVP04A Teck Alaska, Inc. (Teck) DMTS Port Facility 5/3/2021 Cory McDonald Kathie Mulkey review app/draft permit
243 AQ0243TVP05A Peter Pan Seafood Company, LLC King Cove Facility 6/24/2021 Anna Roller Kathie Mulkey
880 AQ0880TVP04A Golden Valley Electric Association Delta Power Plant 6/30/2021 Shawn Osborn Scott Faber Supervisor review / Public notice
837 AQ0837TVP03A Mystery Creek Resources, Inc. Nixon Fork Mine, McGrath 7/6/2021 Shawn Osborn David Jones
196 AQ0196TVP04A Kotzebue Electric Association Kotzebue Power Plant 7/6/2021 Shawn Osborn Kathie Mulkey
186 AQ0186TVP04A Hilcorp North Slope, LLC PBU Central Power Station (CPS) 8/9/2021 Samantha Hoover Scott Faber
1201 AQ1201TVP02A ExxonMobil Alaska Production Inc. Point Thomson Production Facility 8/16/2021 Denise Wiltse David Jones
326 AQ0326TVP04A Hilcorp Alaska, LLC Granite Point Tank Farm 8/24/2021 Rachel McKenna Joshua Klina
88 AQ0088TVP05A UniSea, Inc. Dutch Harbor Seafood Processing Plant 9/10/2021 Alan Pefley James Renovatio
53 AQ0053TVP04A Fairbanks Gold Mining Inc Fort Knox Mine 9/28/2021 Nilima Hullavarad Patrick Dunn
741 AQ0741TVP04A Cook Inlet Energy, LLC Kustatan Production Facility 9/30/2021 Alan Pefley Patrick Dunn
245 AQ0245TVP05A Anchorage Water & Wastewater Utility John M. Asplund Water Pollution Control Facility 10/14/2021 Samantha Hoover Patrick Dunn