All Applications (119 items)  Show/Hide Results  Excel Download *
ID Owner Stationary Source Permit Writer Current Status/Next Step Received Received Complete Fees Paid Draft to Super Start Public Notice End Public Notice Final to Super Transmit to EPA Project Classification Total Elapsed Days Modeler Processing Status Contract Status
AQ0231TVP05A Trident Seafoods Akutan Seafood Processing Facility Klina, Joshua Drafting ORL section associated with recent addendum. 10/22/2025 2021|11|17 TV Renewal 812 Awaiting Applicant Response 05/02/2024 In-house
AQ0231MSS04A Trident Seafoods Akutan Seafood Processing Facility Klina, Joshua Drafting permit and TAR. 2022|02|24 2022|06|17 Minor Modification 18 AAC 50.508(6) 655 In Completeness Review 06/17/2022 In-house
AQ0231MSS03P Trident Seafoods Akutan Seafood Processing Facility Klina, Joshua Drafting 2024|10|10 Install Rain Cap on EU ID 30 500 Joshua Klina In-house
AQ0489TVP03A ConocoPhillips Alaska, Inc. Alpine Central Processing Facility Faber, Scott Pre-public notice review / Public notice 2020|07|31 2020|07|31 TV Renewal 0 Supervisor Review 12/08/2022 In-house
AQ1788ORL02A Alyeschem, LLC Alyeschem Methanol Plant Leibert, Adam Permit writer assigned. Next step: application review 2025|12|04 2025|12|22 ORL to Avoid Title I Minor 80 In-house
AQ0624TVP05A Municipality of Anchorage Anchorage Regional Landfill Saengsudham, Peter 11/13/25 Peter S. - Incompleteness determination sent to Permittee. Awaiting response. Soft dateline is 12/5. 2025|10|02 TVP Renewal 41 Awaiting Applicant Response 11/13/2025 In-house
AQ0062TVP05A Hilcorp Alaska, LLC Anna Platform Rea, Jonathon Public Notice 2024|10|18 2025|11|20 2025|12|22 TVP Renewal 476 Public Notice End 12/22/2025 In-house
AQ0062MSS02A Hilcorp Alaska, LLC Anna Platform Rea, Jonathon Public Notice 2024|10|18 2025|11|20 2025|12|22 476 James Renovatio Public Notice End 12/22/2025 In-house
AQ0417TVP04A Savant Alaska LLC Badami Development Facility Boyden, Zachary 12/11/25 Permit Writing 2023|03|09 2023|03|10 2024|07|03 2024|08|02 Renewal 666 Public Notice End 08/02/2024 In-house
AQ1957MSS01A ConocoPhillips Alaska, Inc. Bear Tooth 1 (BT1) Drill Site Rea, Jonathon 2026|02|18 BT1 Drill Site 4 Zachary Boyden In-house
AQ0106TVP05A Chugach Electric Association Beluga River Power Plant Faber, Scott Supervisor review of EPA documents 2025|01|02 2025|01|02 2025|12|03 2026|01|02 TVP Renewal 416 Public Notice End 01/02/2026 In-house
AQ0942TVP02A Hilcorp Alaska, LLC Beluga River Unit Leibert, Adam Second Public Notice Terminated due to technical inaccuracies. NN 10.30.2025 2018|07|09 2024|02|06 2024|03|07 TVP Renewal 948 2nd Public Notice End 03/07/2024 In-house
AQ0942MSS02P Hilcorp Alaska, LLC Beluga River Unit Leibert, Adam Second Public Notice Terminated due to technical inaccuracies. NN 10.29.2025 2024|03|08 2025|10|03 2025|10|29 POGO Project 18 AAC 50.508(6) 716 Zachary Boyden Public Notice End 10/29/2025 In-house
AQ0064TVP05A Hilcorp Alaska, LLC Bruce Platform Saengsudham, Peter 3/20/25 Peter S. - Informal application complete. Drafting permit. 2025|01|21 2025|03|20 TVP Renewal 339 In Completeness Review 03/20/2025 In-house
AQ0166MSS02A Hilcorp Alaska, LLC Central Compressor Plant (CCP) Application, On Hold Permti on hold. EPA rejected proposed footnote revision. 2013|10|28 Revision of Terms and Conditions of AQ0166CPT04 0 In-house
AQ0166TVP02A Hilcorp Alaska, LLC Central Compressor Plant (CCP) Application, On Hold Working RTC and EPA/45 version. Footnote issue. 2008|03|06 2008|05|30 2008|07|23 2013|09|13 2013|10|29 2013|09|09 TVP Renewal 2230 Public Notice End 10/29/2013 In-house
AQ0166TVP01P Hilcorp Alaska, LLC Central Compressor Plant (CCP) Jones, David On hold - application is related to footnote issue. 2024|11|26 Update Table 5 - Emission Factors 0 In-house
AQ0270TVP01P Hilcorp Alaska, LLC Central Gas Facility (CGF) Jones, David 2020|04|21 Minor Modification 902 In-house
AQ0270TVP01P Hilcorp Alaska, LLC Central Gas Facility (CGF) Jones, David On hold - application is related to footnote issue. 2022|06|30 Admin Amendment 0 In-house
AQ0270TVP02A Hilcorp Alaska, LLC Central Gas Facility (CGF) Application, On Hold PN draft sent to JNU admin. Footnote issue. 2008|03|06 2008|05|06 2013|05|17 2013|08|29 2013|10|15 2013|08|27 TVP Renewal 2254 Public Notice End 10/15/2013 In-house
AQ0270MSS02A Hilcorp Alaska, LLC Central Gas Facility (CGF) Application, On Hold Permti on hold. EPA rejected proposed footnote revision. 2013|10|15 Minor Amendment 0 In-house
AQ0315TVP05A Aurora Energy LLC Chena Power Plant Leibert, Adam 2024|07|05 TVP Renewal 597 In-house
AQ0267TVP02A ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 Faber, Scott 5/7/2025 Updating permit documents 2007|11|19 2011|06|17 2012|11|29 2012|12|31 2011|06|27 TV Renewal 2423 Awaiting Applicant Response 07/03/2014 In-house
AQ0267TVP01P ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 Application, On Hold 3.13.23 On hold for footnote issue. 2019|09|24 CPF1 Minor Mod 2343 In-house
AQ0273TVP01P ConocoPhillips Alaska, Inc. CPF 2, Kuparuk Central Production Facility #2 Application, On Hold 3.13.23 On hold due to footnote issue 2018|01|22 non-applicability of NSPS Subpart Kb 2953 In-house
AQ0273TVP02A ConocoPhillips Alaska, Inc. CPF 2, Kuparuk Central Production Facility #2 Application, On Hold Footnote issue. 2007|06|25 Renewal 2570 Begin Work 04/04/2008 In-house
AQ0171TVP02A ConocoPhillips Alaska, Inc. CPF 3, Kuparuk Central Production Facility #3 Application, On Hold App Addendum for renewal application received. Footnote issue. 2007|07|03 2010|12|06 Renewal 2562 Draft to Super. 12/06/2010 In-house
AQ0171TVP01P ConocoPhillips Alaska, Inc. CPF 3, Kuparuk Central Production Facility #3 Application, On Hold include in renewal (on hold due to footnote issue) - see review notes 2018|01|22 non-applicability to NSPS Subpart Kb 2953 In-house
AQ0265TVP04A Hilcorp Alaska, LLC Crude Oil Topping Unit (COTU) Faber, Scott Supervisor review of response to comments / EPA review 2023|07|03 2023|07|03 2024|07|10 2024|08|09 Crude Oil Topping Unit 965 Supervisor Review 10/09/2024 In-house
AQ0494TVP05A Copper Valley Electric Association CVEA Cogeneration Project Leibert, Adam Initial permit assignment. Next step: completeness review 2025|09|17 TVP Renewal 158 In-house
AQ0060TVP05A Hilcorp Alaska, LLC Dolly Varden Platform Saengsudham, Peter 2/6/26 Peter S. - PN comments received. Reviewing and drafting RTC to prepare EPA 45-day pkg. 2024|10|18 2024|12|17 2026|01|06 2026|02|06 TVP Renewal 424 Public Notice End 02/06/2026 In-house
AQ1552TVP01A ConocoPhillips Alaska, Inc. Doyon 26 Extended Reach Drilling (ERD) Rig Hirsch, Brian Reviewing application and drafting permit 2024|06|03 Doyon 26 Drill Rig POGO, Initial 602 In-house
AQ0264TVP03A US Air Force (Eielson) Eielson Air Force Base Boyden, Zachary 1/2/26 Technical Review by 2/6 2017|10|16 Renewal 2236 Awaiting Applicant Response 10/13/2025 In-house
AQ0264MSS07A US Air Force (Eielson) Eielson Air Force Base Boyden, Zachary 1/2/26 Technical Review by 2/6 2025|02|21 2025 EAFB Minor Permit Rev. 366 Awaiting Applicant Response 10/13/2025 In-house
AQ1086TVP02P Matanuska Electric Association, Inc Eklutna Generation Station Rea, Jonathon Public Notice 2025|05|01 2026|01|13 2026|02|13 Integrated Review with AQ1086TVP03 Rev 1 243 Public Notice End 02/13/2026 In-house
AQ1086MSS03P Matanuska Electric Association, Inc Eklutna Generation Station Rea, Jonathon Public Notice 2025|05|01 2026|01|13 2026|02|13 Eklutna Generation Station 243 Zachary Boyden Public Notice End 02/13/2026 In-house
AQ0181TVP03A Hilcorp Alaska, LLC Endicott Production Facility (END) Application, On Hold BACT table contains footnote on full-load. 2017|07|14 Renewal 0 In-house
AQ0167TVP03A Hilcorp Alaska, LLC Flow Station #1 (FS 1) Application, On Hold PN draft ready for supervisor review. No further work till the BACT full load issue is resolved. Footnote issue. 2017|04|19 2017|04|28 Renewal 0 In Completeness Review 04/28/2017 In-house
AQ0268TVP02A Hilcorp Alaska, LLC Flow Station #2 (FS 2) Application, On Hold Withdrawing from EPA/45 to solve PSD BACT. Footnote issue. 2008|06|11 2012|11|30 2013|05|20 2013|06|19 2013|05|08 TVP renewal 2218 Awaiting Applicant Response 04/16/2014 In-house
AQ0268TVP01P Hilcorp Alaska, LLC Flow Station #2 (FS 2) Jones, David 2022|06|30 Admin Amendment 0 In-house
AQ0269TVP01P Hilcorp Alaska, LLC Flow Station #3 (FS 3) Jones, David On hold - application is related to footnote issue. 2024|10|24 Update Table 5 - Emission Factors 53 In-house
AQ0269TVP02A Hilcorp Alaska, LLC Flow Station #3 (FS 3) Application, On Hold Withdrawing from EPA/45 to solve PSD BACT. Footnote issue. 2007|10|02 2009|02|18 2013|06|11 2013|07|11 2013|06|04 FS #3 TV Renewal 2471 Awaiting Applicant Response 04/16/2014 In-house
AQ0236TVP05A US Army (Fort Wainwright) Fort Wainwright Rea, Jonathon Drafting permit 2024|12|10 TVP Renewal 439 In-house
AQ1121TVP03A Doyon Utilities, LLC Fort Wainwright (Privatized Emission Units) Application, On Hold withdrawn from EPA - permit on hold until we solve the serious SIP issue 2019|05|03 2021|04|22 2021|05|25 TVP Renewal 951 EPA Review End 12/13/2021 In-house
AQ1524CPT02A 8 Star Alaska LLC Gas Treatment Plant (GTP) Klina, Joshua Application received 2025|02|10 Alaska LNG 377 Zachary Boyden In-house
AQ0182TVP02A Hilcorp Alaska, LLC Gathering Center #1 (GC 1) Application, On Hold Footnote issue. 2008|05|21 2009|04|28 2011|11|02 2012|04|19 2012|06|18 2012|04|09 TV Renewal 1897 Public Notice End 06/18/2012 In-house
AQ0182TVP01P Hilcorp Alaska, LLC Gathering Center #1 (GC 1) Jones, David 2019|04|23 Well Pad Disaggregation 1266 In-house
AQ0182TVP01P Hilcorp Alaska, LLC Gathering Center #1 (GC 1) Jones, David 2020|06|02 Minor Modification 860 In-house
AQ0182TVP01P Hilcorp Alaska, LLC Gathering Center #1 (GC 1) Jones, David 2022|06|30 Admin Amendment 0 In-house
AQ0183TVP01P Hilcorp Alaska, LLC Gathering Center #2 (GC 2) Jones, David *App amendment in attachments 5.19.20 2018|12|27 Minor Modification 1383 In-house
AQ0183TVP01P Hilcorp Alaska, LLC Gathering Center #2 (GC 2) Jones, David 2022|06|30 Admin Amendment 0 In-house
AQ0183TVP02A Hilcorp Alaska, LLC Gathering Center #2 (GC 2) Application, On Hold Footnote issue. 2008|05|28 2011|11|02 2012|04|19 2012|06|04 2012|04|09 TV Renewal 2232 Public Notice End 06/04/2012 In-house
AQ0184TVP01P Hilcorp Alaska, LLC Gathering Center #3 (GC 3) Jones, David 2019|08|14 Dissagregation of Well Pads 1153 In-house
AQ0184TVP01P Hilcorp Alaska, LLC Gathering Center #3 (GC 3) Jones, David App. Received 2020|06|09 Minor Modification 853 In-house
AQ0184TVP01P Hilcorp Alaska, LLC Gathering Center #3 (GC 3) Jones, David 2022|06|30 Admin Amendment 0 In-house
AQ0184TVP02A Hilcorp Alaska, LLC Gathering Center #3 (GC 3) Application, On Hold Working PN2 draft. Footnote issue. 2008|07|01 2008|08|07 2011|11|02 2012|04|19 2012|05|21 2012|04|09 TVP Renewal 2161 Public Notice End 05/21/2012 In-house
AQ0287TVP06A Copper Valley Electric Association Glennallen Diesel Plant Jurado, Victoria EPA 45 day review 2025|06|05 2025|08|29 2025|11|18 2025|12|18 TV Renewal 133 EPA Review End 03/01/2026 In-house
AQ0069CPT02A Hilcorp Alaska, LLC Grayling Platform Faber, Scott 7/29/24 reviewing RFI response 2023|12|04 Fuel Gas H2S Increase 811 Zachary Boyden In-house
AQ0173TVP04A Golden Valley Electric Association Healy Power Plant Klina, Joshua 2023|06|26 TVP Renewal 972 In-house
AQ0173MSS03A Golden Valley Electric Association Healy Power Plant Klina, Joshua 2025|04|03 Healy Power Plant 179 In-house
AQ0087TVP05A Hilcorp Alaska, LLC Kenai Gas Field Pad 34-31 Boyden, Zachary 1/12/26 Supervisor review 2025|11|17 TVP Renewal 97 Supervisor Review 01/12/2026 In-house
AQ0090TVP04A Kenai LNG LLC Kenai Liquefied Natural Gas (LNG) Plant Hirsch, Brian 2024|04|23 TVP Renewal 587 In-house
AQ0090MSS01A Kenai LNG LLC Kenai Liquefied Natural Gas (LNG) Plant Hirsch, Brian Public Notice 2025|12|29 2026|02|20 2026|03|23 Import Terminal Project 38 Public Notice End 03/23/2026 In-house
AQ0035TVP03P Tesoro Alaska Company, LLC Kenai Refinery Hirsch, Brian In supervisor review. 10/13/2025 2025|06|24 TVP Revision 3 243 In-house
AQ0068TVP05A Hilcorp Alaska, LLC King Salmon Platform Boyden, Zachary 1/23/26 Drafting Permit 2025|12|02 TVP Renewal 82 In-house
AQ0982MSS11P Furie Operating Alaska, LLC Kitchen Lights Unit Saengsudham, Peter 10/31/25 Peter S. - Initial review and draft of preliminary permit. 2025|10|23 2025|10|31 Minor Modification under 18 AAC 50.508(6) 18 AAC 50.508(6) 114 In Completeness Review 10/31/2025 In-house
AQ0172TVP03A ConocoPhillips Alaska, Inc. Kuparuk Seawater Treatment Plant (STP) Application, On Hold BACT table contains footnotes on full load. No further work expected till footnote issue is resolved. 2013|08|29 2013|09|20 2014|08|28 TVP Renewal 291 Draft to Super. 08/28/2014 In-house
AQ0741MSS03P Cook Inlet Energy, LLC Kustatan Production Facility Jurado, Victoria Initial permit assignment. Next step: completeness review 2025|09|09 2025|12|05 Request to Rescind VOC Limit VOC Limit to Avoid Classification as PSD Major Source for EU IDs 79 In Completeness Review 12/05/2025 In-house
AQ0741TVP04P Cook Inlet Energy, LLC Kustatan Production Facility Jurado, Victoria Initial permit assignment. Next step: completeness review 2025|09|09 2025|12|05 Request to Rescind VOC Limit to Avoid Classification as PSD Major Source for EU IDs 79 In Completeness Review 12/05/2025 In-house
AQ1727TVP01A Harvest Alaska LNG, LLC Liquefied Natural Gas (LNG) Facility Prudhoe Bay Unit Hirsch, Brian 2025|07|07 Initial TVP 52 In-house
AQ0272TVP03A Hilcorp Alaska, LLC Lisburne Production Center (LPC) Application, On Hold Sent draft PN permit to supervisor for review 11/1/16. Held up by footnote issues 2016|08|01 2016|08|01 Renewal 0 In Completeness Review 08/01/2016 In-house
AQ0272MSS04A Hilcorp Alaska, LLC Lisburne Production Center (LPC) Saengsudham, Peter 01.09.26 D. Jones Sent to Permittee for review prior to EPA 45-Day Review. 2024|07|02 2025|10|22 2025|11|24 Power Export Project 18 AAC 50.508(6) 555 James Renovatio Supervisor Review 12/18/2025 In-house
AQ0881TVP01A Hilcorp Alaska, LLC MGS Onshore Facility Application, On Hold on hold pending EPA guidance for reclass of CISWI 7/12/2021 MWJ: see " Hold Periods (2) Notes" 8/8/2025 MWJ: see "Hold Period (3) Notes" 2018|02|16 Initial for incinerator 79 In-house
AQ1559TVP02A Hilcorp Alaska, LLC Milne Point Unit C-Pad Rea, Jonathon 2025|02|10 TVP Renewal 377 In-house
AQ0067TVP04A Hilcorp Alaska, LLC Monopod Platform Klina, Joshua Public Notice 2024|01|30 2024|01|30 2025|11|17 2025|12|17 TVP Renewal 365 Public Notice End 12/17/2025 In-house
AQ0325MSS03A US Ecology Alaska LLC (Formerly NRC Alaska) Moose Creek Facility Hasan, Ibnul Waiting on MCF's response on increased PM PTE. 2025|04|28 Moose Creek Facility 112 In-house
AQ1328ORL01A Mustang Holding LLC Mustang Pad Saengsudham, Peter 4/7/25 Peter S. - Awaiting signed ORL. 5/1/25 Peter S. - Currently under PL2 of annual limit of 500,000 gal (between the C9s and C15s) 2024|02|23 2024|03|05 2024|02|26 2024|04|29 2024|05|29 ORL 18 AAC 50.225 71 Public Notice End 05/29/2024 In-house
AQ1564TVP01A Oil Search Alaska, LLC, a Subsidiary of Santos Limited Nanushuk Drillsite B Saengsudham, Peter 2/17/25 Peter S. - Revising first draft. Separate original copy and SOB under review. 2024|02|12 2024|04|18 Initial TVP 645 Supervisor Review 12/10/2025 In-house
AQ1683TVP01A Oil Search Alaska, LLC, a Subsidiary of Santos Limited Nanushuk Processing Facility (NPF) Klina, Joshua 2024|12|19 Nanushuk Processing Facility 293 In-house
AQ0923TVP03A Hilcorp Alaska, LLC Nikaitchuq Development Faber, Scott EPA 45-day Review 2024|07|22 2025|11|04 2025|12|04 TVP Renewal 580 EPA Review End 03/22/2026 In-house
AQ0110TVP05A Golden Valley Electric Association North Pole Power Plant Leibert, Adam 2024|10|03 TVP Renewal 507 In-house
AQ0503TVP04A Hilcorp Alaska, LLC Northstar Production Facility (NOR) Boyden, Zachary 12/10/25 Response to Comments 2024|12|05 2025|02|03 2025|11|10 2025|12|10 TVP Renewal 384 Public Notice End 12/10/2025 In-house
AQ0083CPT08A Nutrien US LLC (formerly Agrium US Inc.) Nutrien Kenai Nitrogen Operations Saengsudham, Peter 1/22/26 Peter S. - 1st response to information request received. Reviewing. 2025|08|07 Nutrien Kenai Nitrogen Operations 136 Zachary Boyden In-house
AQ0235TVP05A Tesoro Logistics Operations, LLC Ocean Dock Terminal and Anchorage Terminal II Hasan, Ibnul 09.29.25 Assigned to Ibnul 2025|09|03 TVP Renewal 172 David Jones In-house
AQ1854MSS02A Hilcorp Alaska, LLC Omega Pad Klina, Joshua Public Notice 2025|09|05 2026|01|30 2026|03|02 Omega Pad 170 Public Notice End 03/02/2026 In-house
AQ0221TVP05A Cordova Electric Cooperative Orca Power Plant Saengsudham, Peter 2/19/26 Peter S. - Draft pkg preparing for PN. 2024|06|12 2024|07|26 TV Renewal 560 Supervisor Review 02/17/2026 In-house
AQ0186TVP04A Hilcorp Alaska, LLC PBU Central Power Station (CPS) Faber, Scott Supervisor review of response to comments 2021|08|09 2024|03|08 2024|04|08 TVP Renewal 1658 Supervisor Review 06/20/2024 In-house
AQ0186TVP03P Hilcorp Alaska, LLC PBU Central Power Station (CPS) Application, On Hold Application to be withdrawn on or before the effective date of AQ0186TVP04 2017|11|03 Update emissions unit inventory 1502 In-house
AQ0084TVP05A Hilcorp Alaska, LLC Platform A Leibert, Adam Supervisor review complete. Next step: Pre-notice courtesy technical review by Applicant 2023|12|14 2025|02|12 TVP Renewal 375 In Completeness Review 02/12/2025 In-house
AQ0085TVP05A Hilcorp Alaska, LLC Platform C, Middle Ground Shoal, Cook Inlet Hasan, Ibnul 2025|09|09 TVP Renewal 166 In-house
AQ0486TVP04A Providence Health System Providence Alaska Medical Center Faber, Scott Supervisor review of final documents 2024|01|31 2025|09|08 2025|10|08 TVP Renewal 734 EPA Review End 12/27/2025 In-house
AQ0271TVP03A Hilcorp Alaska, LLC Prudhoe Seawater Treatment Plant Application, On Hold footnote issue 2017|04|14 2017|04|14 Renewal 0 In Completeness Review 04/14/2017 In-house
AQ0072TVP05A Alyeska Pipeline Service Company PS #01, TAPS Pump Station Jurado, Victoria Permit writer assigned. NEXT STEP: application completeness review 2025|07|23 2025|09|22 TVP Renewal 153 In Completeness Review 09/22/2025 In-house
AQ0074TVP05A Alyeska Pipeline Service Company PS #03, TAPS Pump Station Faber, Scott Supervisor review 2025|07|29 2025|07|29 TVP Renewal 208 Supervisor Review 01/16/2026 In-house
AQ0075TVP05A Alyeska Pipeline Service Company PS #04, TAPS Pump Station Hasan, Ibnul EPA 45 day review 2025|07|29 2025|10|27 2025|11|27 TVP Renewal 195 EPA Review End 02/19/2026 In-house
AQ0290TVP04A Teck Alaska, Inc. (Teck) Red Dog Mine Leibert, Adam 2024|07|23 TVP Renewal 537 In-house
AQ0290MSS16A Teck Alaska, Inc. (Teck) Red Dog Mine Boyden, Zachary 7/29/25 Awaiting TVP Renewal; Incorporate by Reference 2025|05|19 Rescind MI-3 & MD-11 Limits 279 In-house
AQ0232TVP05A Trident Seafoods Sand Point Facility Klina, Joshua Writing pre-PN draft. 2024|09|30 2024|09|30 TVP Renewal 510 In Completeness Review 09/30/2024 In-house
AQ0170TVP03A Hilcorp Alaska, LLC Seawater Injection Plant East (SIPE) Application, On Hold PN draft ready for supervisor review. No further work until the BACT full load issue is resolved. Footnote issue. 2014|11|12 2014|11|12 2015|10|23 Renewal 0 Supervisor Review 10/23/2015 In-house
AQ0210TVP05A Nome Joint Utility System Snake River Power Plant Klina, Joshua 2024|12|23 TVP Renewal 426 In-house
AQ1955MSS01A Soil Treatment Technologies LLC Soil Remediation Unit 02 Boyden, Zachary 2/4/26: Drafting Permit. Sent information request. 2025|12|31 Soil Remediation Unit 02 34 In-house
AQ1938MSS01A Hilcorp Alaska, LLC Spartan-151 Cook Inlet POGO Jurado, Victoria Initial assignment of permit writer and ambient demonstration reviewer. NEXT STEP: application completeness review. 2025|07|02 2025|09|26 Spartan 151 Drilling Project 18 AAC 50.508(5),18 AAC 50.502(c)(2) 41 Zachary Boyden In Completeness Review 09/26/2025 In-house
AQ0319MSS04A City of Saint Paul St. Paul Power Plant Saengsudham, Peter 12/8/25 Peter S. - Reviewing application. 2025|12|04 Saint Paul Power Plant, Minor Permit Application 80 In-house
AQ0319TVP05A City of Saint Paul St. Paul Power Plant Saengsudham, Peter 12/5/25 Peter S. - MSS application to become minor source received. 2024|09|16 2024|11|05 TVP Renewal 322 In Completeness Review 11/05/2024 In-house
AQ0009MSS05A Hilcorp Alaska, LLC Steelhead Platform Application, On Hold Permit on hold due to BACT footnote issue. 2014|08|19 2014|09|11 Revise and Rescind changes to BACT limit footnotes from MSS04 18 AAC 50.508(6) 846 Draft to Super. 09/11/2014 In-house
AQ0009TVP05A Hilcorp Alaska, LLC Steelhead Platform Klina, Joshua Updating draft after supervisor's review 2024|07|24 2024|07|24 TVP Renewal 578 Awaiting Applicant Response 11/08/2024 In-house
AQ0059TVP04A Hilcorp Alaska, LLC Swanson River Field Hasan, Ibnul 2025|01|06 TVP Renewal 400 In-house
AQ0058TVP03A Hilcorp Alaska, LLC Trading Bay Application, On Hold on hold pending EPA guidance for reclass of CISWI 2018|02|16 Initial 79 In-house
AQ0091TVP03A Hilcorp Alaska, LLC Tyonek Platform Saengsudham, Peter 5/13/25 Peter S. - Reviewing comments and drafting RTC. 2013|09|27 2013|10|08 2025|04|11 2025|05|12 TVP Renewal 4137 Public Notice End 05/12/2025 In-house
AQ0091MSS03P Hilcorp Alaska, LLC Tyonek Platform Saengsudham, Peter 5/13/25 Peter S. - Reviewing comments and drafting RTC. 2022|12|21 2025|04|11 2025|05|12 Crane Replacement Project 18 AAC 50.508(6) 1107 Public Notice End 05/12/2025 In-house
AQ0241TVP06A Westward Seafoods, Inc. Unalaska Seafood Processing Facility Rea, Jonathon Drafting permit 2024|09|04 TVP Renewal 536 In-house
AQ0316TVP03P University of Alaska University of Alaska Fairbanks Campus Jones, David 2024|07|30 PM2.5 Nonattainment Area BACT Requirements 572 In-house
AQ0286TVP06A Copper Valley Electric Association Valdez Diesel Power Plant Faber, Scott Supervisor review 2025|07|23 TVP Renewal 214 Supervisor Review 10/02/2025 In-house
AQ0082TVP03A Alyeska Pipeline Service Company Valdez Marine Terminal Application, On Hold On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23) 2016|07|14 2016|07|14 2017|05|31 2017|06|30 Renewal 2532 Supervisor Review 07/18/2017 In-house
AQ0082TVP03A Alyeska Pipeline Service Company Valdez Marine Terminal Application, On Hold On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23) 2019|02|06 1595 In-house
AQ0082MSS04A Alyeska Pipeline Service Company Valdez Marine Terminal Application, On Hold On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23) 2019|02|06 Revisions to construction permit 082CP05 18 AAC 50.508(6) 1595 In-house
AQ1690MSS02A Hilcorp Alaska, LLC Z-PAD Jurado, Victoria Reviewing modeling protocol and drafting permit and modeling report. 2025|07|25 2025|09|23 Z-Pad T-130 Power Expansion 133 Brian Hirsch In Completeness Review 09/23/2025 In-house
AQ0109TVP05A Golden Valley Electric Association Zehnder Facility Faber, Scott Preparing draft permit 2025|11|03 TVP Renewal 111 In-house
AQ1865MSS01P ABC ZZZ 1900|01|01 Test - PTE Calc 46073 In-house

Title I Applications Only (30 items)  Show/Hide Results  Excel Download *
Owner Stationary Source ID Project Classification Received Received Complete Fees Paid Total Elapsed Days Start Public Notice End Public Notice Engineer Modeler Processing Status Contract Status Current Status/Next Step
Trident Seafoods Akutan Seafood Processing Facility AQ0231MSS03P Install Rain Cap on EU ID 30 2024|10|10 500 Joshua Klina Joshua Klina In-house Drafting
Hilcorp Alaska, LLC Tyonek Platform AQ0091MSS03P Crane Replacement Project 18 AAC 50.508(6) 2022|12|21 1107 2025|04|11 2025|05|12 Peter Saengsudham Public Notice End 5/12/2025 In-house 5/13/25 Peter S. - Reviewing comments and drafting RTC.
Hilcorp Alaska, LLC Central Compressor Plant (CCP) AQ0166MSS02A Revision of Terms and Conditions of AQ0166CPT04 2013|10|28 0 On Hold Application In-house Permti on hold. EPA rejected proposed footnote revision.
Hilcorp Alaska, LLC Central Gas Facility (CGF) AQ0270MSS02A Minor Amendment 2013|10|15 0 On Hold Application In-house Permti on hold. EPA rejected proposed footnote revision.
Hilcorp Alaska, LLC Steelhead Platform AQ0009MSS05A Revise and Rescind changes to BACT limit footnotes from MSS04 18 AAC 50.508(6) 2014|08|19 846 On Hold Application Draft To Super 9/11/2014 In-house Permit on hold due to BACT footnote issue.
Matanuska Electric Association, Inc Eklutna Generation Station AQ1086MSS03P Eklutna Generation Station 2025|05|01 243 2026|01|13 2026|02|13 Jonathon Rea Zachary Boyden Public Notice End 2/13/2026 In-house Public Notice
Cook Inlet Energy, LLC Kustatan Production Facility AQ0741MSS03P Request to Rescind VOC Limit VOC Limit to Avoid Classification as PSD Major Source for EU IDs 2025|09|09 2025|12|05 79 Victoria Jurado In-house Initial permit assignment. Next step: completeness review
Furie Operating Alaska, LLC Kitchen Lights Unit AQ0982MSS11P Minor Modification under 18 AAC 50.508(6) 18 AAC 50.508(6) 2025|10|23 2025|10|31 114 Peter Saengsudham In-house 10/31/25 Peter S. - Initial review and draft of preliminary permit.
Alyeska Pipeline Service Company Valdez Marine Terminal AQ0082MSS04A Revisions to construction permit 082CP05 18 AAC 50.508(6) 2019|02|06 1595 On Hold Application In-house On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23)
Hilcorp Alaska, LLC Beluga River Unit AQ0942MSS02P POGO Project 18 AAC 50.508(6) 2024|03|08 716 2025|10|03 2025|10|29 Adam Leibert Zachary Boyden Public Notice End 10/29/2025 In-house Second Public Notice Terminated due to technical inaccuracies. NN 10.29.2025
Trident Seafoods Akutan Seafood Processing Facility AQ0231MSS04A Minor Modification 18 AAC 50.508(6) 2022|02|24 2022|06|17 655 Joshua Klina In-house Drafting permit and TAR.
Hilcorp Alaska, LLC Grayling Platform AQ0069CPT02A Fuel Gas H2S Increase 2023|12|04 811 Scott Faber Zachary Boyden In-house 7/29/24 reviewing RFI response
Mustang Holding LLC Mustang Pad AQ1328ORL01A ORL 18 AAC 50.225 2024|02|23 2024|03|05 2024|02|26 77 2024|04|29 2024|05|29 Peter Saengsudham Public Notice End 5/29/2024 In-house 4/7/25 Peter S. - Awaiting signed ORL. 5/1/25 Peter S. - Currently under PL2 of annual limit of 500,000 gal (between the C9s and C15s)
Hilcorp Alaska, LLC Lisburne Production Center (LPC) AQ0272MSS04A Power Export Project 18 AAC 50.508(6) 2024|07|02 555 2025|10|22 2025|11|24 Peter Saengsudham James Renovatio Public Notice End 11/24/2025 In-house 01.09.26 D. Jones Sent to Permittee for review prior to EPA 45-Day Review.
Hilcorp Alaska, LLC Anna Platform AQ0062MSS02A 2024|10|18 476 2025|11|20 2025|12|22 Jonathon Rea James Renovatio Public Notice End 12/22/2025 In-house Public Notice
8 Star Alaska LLC Gas Treatment Plant (GTP) AQ1524CPT02A Alaska LNG 2025|02|10 377 Joshua Klina Zachary Boyden In-house Application received
US Air Force (Eielson) Eielson Air Force Base AQ0264MSS07A 2025 EAFB Minor Permit Rev. 2025|02|21 366 Zachary Boyden In-house 1/2/26 Technical Review by 2/6
Golden Valley Electric Association Healy Power Plant AQ0173MSS03A Healy Power Plant 2025|04|03 179 Joshua Klina In-house
US Ecology Alaska LLC (Formerly NRC Alaska) Moose Creek Facility AQ0325MSS03A Moose Creek Facility 2025|04|28 112 Ibnul Hasan In-house Waiting on MCF's response on increased PM PTE.
Teck Alaska, Inc. (Teck) Red Dog Mine AQ0290MSS16A Rescind MI-3 & MD-11 Limits 2025|05|19 279 Zachary Boyden In-house 7/29/25 Awaiting TVP Renewal; Incorporate by Reference
ABC ZZZ AQ1865MSS01P Test - PTE Calc 1900|01|01 46073 In-house
Hilcorp Alaska, LLC Spartan-151 Cook Inlet POGO AQ1938MSS01A Spartan 151 Drilling Project 18 AAC 50.508(5),18 AAC 50.502(c)(2) 2025|07|02 2025|09|26 41 Victoria Jurado Zachary Boyden In-house Initial assignment of permit writer and ambient demonstration reviewer. NEXT STEP: application completeness review.
Hilcorp Alaska, LLC Z-PAD AQ1690MSS02A Z-Pad T-130 Power Expansion 2025|07|25 2025|09|23 133 Victoria Jurado Brian Hirsch In-house Reviewing modeling protocol and drafting permit and modeling report.
Nutrien US LLC (formerly Agrium US Inc.) Nutrien Kenai Nitrogen Operations AQ0083CPT08A Nutrien Kenai Nitrogen Operations 2025|08|07 136 Peter Saengsudham Zachary Boyden In-house 1/22/26 Peter S. - 1st response to information request received. Reviewing.
Hilcorp Alaska, LLC Omega Pad AQ1854MSS02A Omega Pad 2025|09|05 170 2026|01|30 2026|03|02 Joshua Klina Public Notice End 3/2/2026 In-house Public Notice
City of Saint Paul St. Paul Power Plant AQ0319MSS04A Saint Paul Power Plant, Minor Permit Application 2025|12|04 80 Peter Saengsudham In-house 12/8/25 Peter S. - Reviewing application.
Alyeschem, LLC Alyeschem Methanol Plant AQ1788ORL02A ORL to Avoid Title I Minor 2025|12|04 2025|12|22 80 Adam Leibert In-house Permit writer assigned. Next step: application review
Soil Treatment Technologies LLC Soil Remediation Unit 02 AQ1955MSS01A Soil Remediation Unit 02 2025|12|31 34 Zachary Boyden In-house 2/4/26: Drafting Permit. Sent information request.
Kenai LNG LLC Kenai Liquefied Natural Gas (LNG) Plant AQ0090MSS01A Import Terminal Project 2025|12|29 38 2026|02|20 2026|03|23 Brian Hirsch Public Notice End 3/23/2026 In-house Public Notice
ConocoPhillips Alaska, Inc. Bear Tooth 1 (BT1) Drill Site AQ1957MSS01A BT1 Drill Site 2026|02|18 4 Jonathon Rea Zachary Boyden In-house


Title V Applications Only (89 items)  Show/Hide Results  Excel Download *
Source ID ID Owner Stationary Source Received Received Complete Fees Paid Begin Work Draft to Super Start Public Notice End Public Notice Final to Super Transmit to EPA Facility Inspector PRT Assignment Comment
166 AQ0166TVP01P Hilcorp Alaska, LLC Central Compressor Plant (CCP) 2024|11|26 Robert Blume David Jones On hold - application is related to footnote issue.
270 AQ0270TVP01P Hilcorp Alaska, LLC Central Gas Facility (CGF) 2020|04|21 Nicholas Hansen David Jones
270 AQ0270TVP01P Hilcorp Alaska, LLC Central Gas Facility (CGF) 2022|06|30 Nicholas Hansen David Jones On hold - application is related to footnote issue.
268 AQ0268TVP01P Hilcorp Alaska, LLC Flow Station #2 (FS 2) 2022|06|30 Nicholas Hansen David Jones
269 AQ0269TVP01P Hilcorp Alaska, LLC Flow Station #3 (FS 3) 2024|10|24 Nicholas Hansen David Jones On hold - application is related to footnote issue.
182 AQ0182TVP01P Hilcorp Alaska, LLC Gathering Center #1 (GC 1) 2019|04|23 Shane Serrano David Jones
182 AQ0182TVP01P Hilcorp Alaska, LLC Gathering Center #1 (GC 1) 2020|06|02 Shane Serrano David Jones
182 AQ0182TVP01P Hilcorp Alaska, LLC Gathering Center #1 (GC 1) 2022|06|30 Shane Serrano David Jones
183 AQ0183TVP01P Hilcorp Alaska, LLC Gathering Center #2 (GC 2) 2018|12|27 Andrew Mohrmann David Jones *App amendment in attachments 5.19.20
183 AQ0183TVP01P Hilcorp Alaska, LLC Gathering Center #2 (GC 2) 2022|06|30 Andrew Mohrmann David Jones
184 AQ0184TVP01P Hilcorp Alaska, LLC Gathering Center #3 (GC 3) 2019|08|14 Shane Serrano David Jones
184 AQ0184TVP01P Hilcorp Alaska, LLC Gathering Center #3 (GC 3) 2020|06|09 Shane Serrano David Jones App. Received
184 AQ0184TVP01P Hilcorp Alaska, LLC Gathering Center #3 (GC 3) 2022|06|30 Shane Serrano David Jones
267 AQ0267TVP01P ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 2019|09|24 Caitlin Hawthorne On Hold Application 3.13.23 On hold for footnote issue.
273 AQ0273TVP01P ConocoPhillips Alaska, Inc. CPF 2, Kuparuk Central Production Facility #2 2018|01|22 Caitlin Hawthorne On Hold Application 3.13.23 On hold due to footnote issue
171 AQ0171TVP01P ConocoPhillips Alaska, Inc. CPF 3, Kuparuk Central Production Facility #3 2018|01|22 Caitlin Hawthorne On Hold Application include in renewal (on hold due to footnote issue) - see review notes
273 AQ0273TVP02A ConocoPhillips Alaska, Inc. CPF 2, Kuparuk Central Production Facility #2 2007|06|25 2008|04|04 Caitlin Hawthorne On Hold Application Footnote issue.
171 AQ0171TVP02A ConocoPhillips Alaska, Inc. CPF 3, Kuparuk Central Production Facility #3 2007|07|03 2008|04|04 2010|12|06 Caitlin Hawthorne On Hold Application App Addendum for renewal application received. Footnote issue.
269 AQ0269TVP02A Hilcorp Alaska, LLC Flow Station #3 (FS 3) 2007|10|02 2008|06|18 2009|02|18 2013|06|11 2013|07|11 2013|06|04 Nicholas Hansen On Hold Application Withdrawing from EPA/45 to solve PSD BACT. Footnote issue.
267 AQ0267TVP02A ConocoPhillips Alaska, Inc. CPF 1, Kuparuk Central Production Facility #1 2007|11|19 2008|04|04 2011|06|17 2012|11|29 2012|12|31 2011|06|27 Caitlin Hawthorne Scott Faber 5/7/2025 Updating permit documents
166 AQ0166TVP02A Hilcorp Alaska, LLC Central Compressor Plant (CCP) 2008|03|06 2008|05|30 2008|07|23 2013|09|13 2013|10|29 2013|09|09 Robert Blume On Hold Application Working RTC and EPA/45 version. Footnote issue.
270 AQ0270TVP02A Hilcorp Alaska, LLC Central Gas Facility (CGF) 2008|03|06 2008|05|06 2008|05|20 2013|05|17 2013|08|29 2013|10|15 2013|08|27 Nicholas Hansen On Hold Application PN draft sent to JNU admin. Footnote issue.
182 AQ0182TVP02A Hilcorp Alaska, LLC Gathering Center #1 (GC 1) 2008|05|21 2009|04|28 2009|07|29 2011|11|02 2012|04|19 2012|06|18 2012|04|09 Shane Serrano On Hold Application Footnote issue.
183 AQ0183TVP02A Hilcorp Alaska, LLC Gathering Center #2 (GC 2) 2008|05|28 2009|07|29 2011|11|02 2012|04|19 2012|06|04 2012|04|09 Andrew Mohrmann On Hold Application Footnote issue.
268 AQ0268TVP02A Hilcorp Alaska, LLC Flow Station #2 (FS 2) 2008|06|11 2009|08|04 2012|11|30 2013|05|20 2013|06|19 2013|05|08 Nicholas Hansen On Hold Application Withdrawing from EPA/45 to solve PSD BACT. Footnote issue.
184 AQ0184TVP02A Hilcorp Alaska, LLC Gathering Center #3 (GC 3) 2008|07|01 2008|08|07 2009|07|29 2011|11|02 2012|04|19 2012|05|21 2012|04|09 Shane Serrano On Hold Application Working PN2 draft. Footnote issue.
316 AQ0316TVP03P University of Alaska University of Alaska Fairbanks Campus 2024|07|30 Caitlin Hawthorne David Jones
172 AQ0172TVP03A ConocoPhillips Alaska, Inc. Kuparuk Seawater Treatment Plant (STP) 2013|08|29 2013|09|20 2013|10|14 2014|08|28 Caitlin Hawthorne On Hold Application BACT table contains footnotes on full load. No further work expected till footnote issue is resolved.
91 AQ0091TVP03A Hilcorp Alaska, LLC Tyonek Platform 2013|09|27 2013|10|08 2025|04|11 2025|05|12 Andrew Mohrmann Peter Saengsudham 5/13/25 Peter S. - Reviewing comments and drafting RTC.
170 AQ0170TVP03A Hilcorp Alaska, LLC Seawater Injection Plant East (SIPE) 2014|11|12 2014|11|12 2015|08|06 2015|10|23 Monique Witsel Jacoby On Hold Application PN draft ready for supervisor review. No further work until the BACT full load issue is resolved. Footnote issue.
186 AQ0186TVP03P Hilcorp Alaska, LLC PBU Central Power Station (CPS) 2017|11|03 Monique Witsel Jacoby On Hold Application Application to be withdrawn on or before the effective date of AQ0186TVP04
82 AQ0082TVP03A Alyeska Pipeline Service Company Valdez Marine Terminal 2016|07|14 2016|07|14 2017|05|31 2017|06|30 Breanna Howard On Hold Application On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23)
82 AQ0082TVP03A Alyeska Pipeline Service Company Valdez Marine Terminal 2019|02|06 Breanna Howard On Hold Application On hold pending EPA reconsideration of 40 CFR 63 Subpart EEEE (SFaber, 7/5/23)
272 AQ0272TVP03A Hilcorp Alaska, LLC Lisburne Production Center (LPC) 2016|08|01 2016|08|01 Shane Serrano On Hold Application Sent draft PN permit to supervisor for review 11/1/16. Held up by footnote issues
35 AQ0035TVP03P Tesoro Alaska Company, LLC Kenai Refinery 2025|06|24 Breanna Howard Brian Hirsch In supervisor review. 10/13/2025
271 AQ0271TVP03A Hilcorp Alaska, LLC Prudhoe Seawater Treatment Plant 2017|04|14 2017|04|14 Mandy Leach On Hold Application footnote issue
167 AQ0167TVP03A Hilcorp Alaska, LLC Flow Station #1 (FS 1) 2017|04|19 2017|04|28 Daniela Fawcett On Hold Application PN draft ready for supervisor review. No further work till the BACT full load issue is resolved. Footnote issue.
181 AQ0181TVP03A Hilcorp Alaska, LLC Endicott Production Facility (END) 2017|07|14 Robert Blume On Hold Application BACT table contains footnote on full-load.
264 AQ0264TVP03A US Air Force (Eielson) Eielson Air Force Base 2017|10|16 Mandy Leach Zachary Boyden 1/2/26 Technical Review by 2/6
58 AQ0058TVP03A Hilcorp Alaska, LLC Trading Bay 2018|02|16 Andrew Mohrmann On Hold Application on hold pending EPA guidance for reclass of CISWI
881 AQ0881TVP01A Hilcorp Alaska, LLC MGS Onshore Facility 2018|02|16 Monique Witsel Jacoby On Hold Application on hold pending EPA guidance for reclass of CISWI 7/12/2021 MWJ: see " Hold Periods (2) Notes" 8/8/2025 MWJ: see "Hold Period (3) Notes"
942 AQ0942TVP02A Hilcorp Alaska, LLC Beluga River Unit 2018|07|09 2024|02|06 2024|03|07 Daniela Fawcett Adam Leibert Second Public Notice Terminated due to technical inaccuracies. NN 10.30.2025
1121 AQ1121TVP03A Doyon Utilities, LLC Fort Wainwright (Privatized Emission Units) 2019|05|03 2021|04|22 2021|05|25 2021|10|29 Mandy Leach On Hold Application withdrawn from EPA - permit on hold until we solve the serious SIP issue
489 AQ0489TVP03A ConocoPhillips Alaska, Inc. Alpine Central Processing Facility 2020|07|31 2020|07|31 Caitlin Hawthorne Scott Faber Pre-public notice review / Public notice
1086 AQ1086TVP02P Matanuska Electric Association, Inc Eklutna Generation Station 2025|05|01 2026|01|13 2026|02|13 Daniela Fawcett Jonathon Rea Public Notice
186 AQ0186TVP04A Hilcorp Alaska, LLC PBU Central Power Station (CPS) 2021|08|09 2024|03|08 2024|04|08 Monique Witsel Jacoby Scott Faber Supervisor review of response to comments
741 AQ0741TVP04P Cook Inlet Energy, LLC Kustatan Production Facility 2025|09|09 2025|12|05 Breanna Howard Victoria Jurado Initial permit assignment. Next step: completeness review
231 AQ0231TVP05A Trident Seafoods Akutan Seafood Processing Facility 2021|11|17 Rachel McKenna Joshua Klina Drafting ORL section associated with recent addendum. 10/22/2025
417 AQ0417TVP04A Savant Alaska LLC Badami Development Facility 2023|03|09 2023|03|10 2024|07|03 2024|08|02 Breanna Howard Zachary Boyden 12/11/25 Permit Writing
173 AQ0173TVP04A Golden Valley Electric Association Healy Power Plant 2023|06|26 Robert Blume Joshua Klina
265 AQ0265TVP04A Hilcorp Alaska, LLC Crude Oil Topping Unit (COTU) 2023|07|03 2023|07|03 2024|07|10 2024|08|09 Monique Witsel Jacoby Scott Faber Supervisor review of response to comments / EPA review
84 AQ0084TVP05A Hilcorp Alaska, LLC Platform A 2023|12|14 2025|02|12 Andrew Mohrmann Adam Leibert Supervisor review complete. Next step: Pre-notice courtesy technical review by Applicant
486 AQ0486TVP04A Providence Health System Providence Alaska Medical Center 2024|01|31 2025|09|08 2025|10|08 2025|11|12 Daniela Fawcett Scott Faber Supervisor review of final documents
67 AQ0067TVP04A Hilcorp Alaska, LLC Monopod Platform 2024|01|30 2024|01|30 2025|11|17 2025|12|17 Nicholas Hansen Joshua Klina Public Notice
1564 AQ1564TVP01A Oil Search Alaska, LLC, a Subsidiary of Santos Limited Nanushuk Drillsite B 2024|02|12 2024|04|18 Robert Blume Peter Saengsudham 2/17/25 Peter S. - Revising first draft. Separate original copy and SOB under review.
90 AQ0090TVP04A Kenai LNG LLC Kenai Liquefied Natural Gas (LNG) Plant 2024|04|23 Breanna Howard Brian Hirsch
221 AQ0221TVP05A Cordova Electric Cooperative Orca Power Plant 2024|06|12 2024|07|26 Shane Serrano Peter Saengsudham 2/19/26 Peter S. - Draft pkg preparing for PN.
315 AQ0315TVP05A Aurora Energy LLC Chena Power Plant 2024|07|05 Robert Blume Adam Leibert
923 AQ0923TVP03A Hilcorp Alaska, LLC Nikaitchuq Development 2024|07|22 2025|11|04 2025|12|04 2026|02|05 Mandy Leach Scott Faber EPA 45-day Review
290 AQ0290TVP04A Teck Alaska, Inc. (Teck) Red Dog Mine 2024|07|23 Robert Blume Adam Leibert
9 AQ0009TVP05A Hilcorp Alaska, LLC Steelhead Platform 2024|07|24 2024|07|24 Andrew Mohrmann Joshua Klina Updating draft after supervisor's review
1552 AQ1552TVP01A ConocoPhillips Alaska, Inc. Doyon 26 Extended Reach Drilling (ERD) Rig 2024|06|03 Caitlin Hawthorne Brian Hirsch Reviewing application and drafting permit
241 AQ0241TVP06A Westward Seafoods, Inc. Unalaska Seafood Processing Facility 2024|09|04 Breanna Howard Jonathon Rea Drafting permit
319 AQ0319TVP05A City of Saint Paul St. Paul Power Plant 2024|09|16 2024|11|05 Daniela Fawcett Peter Saengsudham 12/5/25 Peter S. - MSS application to become minor source received.
232 AQ0232TVP05A Trident Seafoods Sand Point Facility 2024|09|30 2024|09|30 Andrew Mohrmann Joshua Klina Writing pre-PN draft.
110 AQ0110TVP05A Golden Valley Electric Association North Pole Power Plant 2024|10|03 Caitlin Hawthorne Adam Leibert
62 AQ0062TVP05A Hilcorp Alaska, LLC Anna Platform 2024|10|18 2025|11|20 2025|12|22 Nicholas Hansen Jonathon Rea Public Notice
60 AQ0060TVP05A Hilcorp Alaska, LLC Dolly Varden Platform 2024|10|18 2024|12|17 2026|01|06 2026|02|06 Nicholas Hansen Peter Saengsudham 2/6/26 Peter S. - PN comments received. Reviewing and drafting RTC to prepare EPA 45-day pkg.
503 AQ0503TVP04A Hilcorp Alaska, LLC Northstar Production Facility (NOR) 2024|12|05 2025|02|03 2025|11|10 2025|12|10 Robert Blume Zachary Boyden 12/10/25 Response to Comments
236 AQ0236TVP05A US Army (Fort Wainwright) Fort Wainwright 2024|12|10 Mandy Leach Jonathon Rea Drafting permit
1683 AQ1683TVP01A Oil Search Alaska, LLC, a Subsidiary of Santos Limited Nanushuk Processing Facility (NPF) 2024|12|19 Mandy Leach Joshua Klina
210 AQ0210TVP05A Nome Joint Utility System Snake River Power Plant 2024|12|23 Robert Blume Joshua Klina
106 AQ0106TVP05A Chugach Electric Association Beluga River Power Plant 2025|01|02 2025|01|02 2025|12|03 2026|01|02 Daniela Fawcett Scott Faber Supervisor review of EPA documents
59 AQ0059TVP04A Hilcorp Alaska, LLC Swanson River Field 2025|01|06 Nicholas Hansen Ibnul Hasan
64 AQ0064TVP05A Hilcorp Alaska, LLC Bruce Platform 2025|01|21 2025|03|20 Andrew Mohrmann Peter Saengsudham 3/20/25 Peter S. - Informal application complete. Drafting permit.
1559 AQ1559TVP02A Hilcorp Alaska, LLC Milne Point Unit C-Pad 2025|02|10 Daniela Fawcett Jonathon Rea
287 AQ0287TVP06A Copper Valley Electric Association Glennallen Diesel Plant 2025|06|05 2025|08|29 2025|11|18 2025|12|18 2026|01|15 Shane Serrano Victoria Jurado EPA 45 day review
1727 AQ1727TVP01A Harvest Alaska LNG, LLC Liquefied Natural Gas (LNG) Facility Prudhoe Bay Unit 2025|07|07 Daniela Fawcett Brian Hirsch
72 AQ0072TVP05A Alyeska Pipeline Service Company PS #01, TAPS Pump Station 2025|07|23 2025|09|22 Daniela Fawcett Victoria Jurado Permit writer assigned. NEXT STEP: application completeness review
286 AQ0286TVP06A Copper Valley Electric Association Valdez Diesel Power Plant 2025|07|23 Shane Serrano Scott Faber Supervisor review
74 AQ0074TVP05A Alyeska Pipeline Service Company PS #03, TAPS Pump Station 2025|07|29 2025|07|29 Shane Serrano Scott Faber Supervisor review
75 AQ0075TVP05A Alyeska Pipeline Service Company PS #04, TAPS Pump Station 2025|07|29 2025|10|27 2025|11|27 2026|01|05 Shane Serrano Ibnul Hasan EPA 45 day review
235 AQ0235TVP05A Tesoro Logistics Operations, LLC Ocean Dock Terminal and Anchorage Terminal II 2025|09|03 Breanna Howard Ibnul Hasan 09.29.25 Assigned to Ibnul
85 AQ0085TVP05A Hilcorp Alaska, LLC Platform C, Middle Ground Shoal, Cook Inlet 2025|09|09 Andrew Mohrmann Ibnul Hasan
494 AQ0494TVP05A Copper Valley Electric Association CVEA Cogeneration Project 2025|09|17 Shane Serrano Adam Leibert Initial permit assignment. Next step: completeness review
624 AQ0624TVP05A Municipality of Anchorage Anchorage Regional Landfill 2025|10|02 Breanna Howard Peter Saengsudham 11/13/25 Peter S. - Incompleteness determination sent to Permittee. Awaiting response. Soft dateline is 12/5.
109 AQ0109TVP05A Golden Valley Electric Association Zehnder Facility 2025|11|03 Caitlin Hawthorne Scott Faber Preparing draft permit
87 AQ0087TVP05A Hilcorp Alaska, LLC Kenai Gas Field Pad 34-31 2025|11|17 Daniela Fawcett Zachary Boyden 1/12/26 Supervisor review
68 AQ0068TVP05A Hilcorp Alaska, LLC King Salmon Platform 2025|12|02 Andrew Mohrmann Zachary Boyden 1/23/26 Drafting Permit