Site Report: Tyonek Timber Camp

Site Name: Tyonek Timber Camp
Address: Tyonek Timber Camp, Tyonek, AK 99682
File Number: 2337.38.014
Hazard ID: 1006
Status: Active
Staff: Dawn Wilburn, 9072628200 dawn.wilburn@alaska.gov
Latitude: 61.047222
Longitude: -151.197778
Horizontal Datum:NAD83

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

In 1990, petroleum contaminated soil was encountered during renovation of the historic Tyonek Timber Co. housing camp located one mile west of the pulp plant. The two areas of concern include: the well house and the former 2,500 gallon underground HOT. Approximately 50 cubic yards of contaminated soil was excavated from the 2,500 gallon HOT and stockpiled on site. The excavation of contaminated soil was halted when it was determined contamination was migrating off site. At the well house, contamination was encountered during the water supply system improvement activities. Improvements consisted of a new perforated pipe for collecting lake water and a treatment system for purifying lake water. During excavation for the new collector pipe, contaminated soil was encountered between the well house and the lake (note: according to a 1991 correspondence, the water well near the generator building had an oil smell and taste, and a water sample collected contained free product). Ten cubic yards of soil was removed at the limits of the pipe excavation to a depth of 1 foot bgs and added to the onsite stockpile. Contamination, which extended around the well house foundation, was left in place. The onsite stockpile was landspread on the old runway in 1991.

Action Information

Action Date Action Description DEC Staff
9/17/1990 Update or Other Action Spill notification certified letter sent to Tyonek Native Corporation on this date for Oil Spill #90230124901. Grant Lidren
9/17/1990 Update or Other Action On this date, a surface water samples were collected from the lake adjacent to the surface water intake and a water sample was collected from within the well house from the vertical riser. both samples were ND. However, the well house contained a strong hydrocarbon odor and the floor was stained with petroleum products. Grant Lidren
6/20/1991 Site Characterization Workplan Approved On this date, ADEC approved the Draft Work Plan Quality Assurance Plan Quality Control Plan Fuel Tank Investigation Tyonek Timber Camp submitted by Wooward-Clyde Consultants dated April 1991. Don Fritz
11/6/1992 Site Added to Database Petroleum contamination. Former Staff
12/9/1992 Site Ranked Using the AHRM Initial ranking. Former Staff
8/17/1993 Update or Other Action (Old R:Base Action Code = TECH - Technical Assistance). Provided TECH to CIRI and TNC. regarding cleanup levels and cleanup procedures for this site. Former Staff
8/23/1993 Update or Other Action (Old R:Base Action Code = TECH - Technical Assistance). Discussed cleanup levels with site contractor. Cleanup levels revised based on adjacent lake being utilized as DW source. Former Staff
9/16/1993 Update or Other Action (Old R:Base Action Code = SA2R - Phase II SA Review (CS)). Reviewed excavation closure proposal from Chemtrack. Sent letter requesting additional data to review closure plans. Also reviewed long term storage plans. Former Staff
9/20/1993 Update or Other Action (Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Reviewed long term contaminated soil stockpiling plan. Requested additional information from consultant. Former Staff
9/22/1993 Update or Other Action (Old R:Base Action Code = SA2R - Phase II SA Review (CS)). Additional excavation sampling data reviewed. Approval given to backfill the excavations. Former Staff
9/28/1993 Update or Other Action (Old R:Base Action Code = TECH - Technical Assistance). Daily technical assistance with consultant, Tyonek Native Corporation and CIRI concerning the status of the cleanup and long term storage cell plan review between 9/28/93 thru 10/1/93. The department is waiting for additional information to complete the review. Former Staff
11/15/1993 Update or Other Action (Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Sent letter to Chem Track, consultants for RP, as to status of long term soil stockpiling plans. Plans are incomplete. If not completed shortly, they will not have the long term cell completed prior to the onset of winter. Former Staff
8/15/1994 Update or Other Action (Old R:Base Action Code = SI - Site Investigation). Donald Seagren
10/19/1994 Update or Other Action (Old R:Base Action Code = FI - Field Inspection (General)). Tyonek heating fuel USTs. Former Staff
5/10/2004 Update or Other Action File number assigned and entered into the Fileroom DB and CS DB. Alyce Hughey
8/4/2004 Update or Other Action Sent letter requesting copy of assessment report approved in 91. If assessment not conducted, work plan must be updated, based on current regulations, prior to conducting the assessment. Donald Seagren
10/21/2005 GIS Position Updated Using Figures 1 and 2 from a Work Plan Quality Assurance Plan Quality Control Plan, from Woodward-Clyde Consultants, dated November 30, 1990, in conjunction with TopoZone Pro and the KPB Parcel Lookup, entered the coordinates for this site. Metadata includes No Topo Basemap, TopoZone Pro Street Maps, Black and White Aerial Photo, on a Medium Size Map, View Scale 1:10,000, Coordinate Datum NAD83. High degree of confidence in accuracy of location. Alyce Hughey
5/9/2007 Exposure Tracking Model Ranking Donald Seagren
6/11/2008 Update or Other Action Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. Alyce Hughey
6/3/2009 Update or Other Action File transferred from Soldotna to Anchorage 6-3-09. Project Manager changed from Paul Horwath to Linda Nuechterlein to Grant Lidren. Alyce Hughey
4/15/2010 Update or Other Action In April 2010, a Class B public drinking water well was advanced 1,000 feet north of the Tyonek Timber Camp contaminated site at the coordinates: 61.049834, -151.200199. The drinking water well is 137 feet bgs and supplies the AK Division Inc., Tyonek Duplex Housing. Grant Lidren
3/4/2013 Update or Other Action File Transferred from Anchorage to Soldotna. Project manager changed from Grant Lidren to Paul Horwath. Annie Ariel
1/10/2020 Workplan Requested Work Plan Request Letter sent to RP. Jessica Hall
2/4/2020 Update or Other Action David Kroto who works with Land and Natural Resources (907-272-0707 dkroto@tyonek.com) at 12:50 pm. They are looking for an extension for the Work Plan submittal and are planning to have Environmental Compliance Consultants (ECC) prepare a work plan, but will not ready for submittal by February 29th. They are requesting an extension. Jessica Hall
3/9/2020 Workplan Requested Over due Work Plan Request Letter sent to the RP. Jessica Hall
3/13/2020 Update or Other Action David L Kroto, Lands Administrator of Tyonek Native Corporation emailed and said Environmental Compliance Consultants (ECC) will do a site visit this summer to help them better prepare a work plan for submittal to ADEC. Jessica Hall
10/29/2020 Document, Report, or Work plan Review - other ADEC reviewed and sent comments on the Draft Site Characterization Work Plan for Tyonek Native Corporation Tyonek Timber Camp, dated September 2020. Updates were requested to be included in the Final Work Plan. Jessica Hall
3/11/2021 Site Characterization Workplan Approved ADEC Sent the RP an Approval Letter for the Draft Site Characterization Work Plan for Tyonek Native Corporation Tyonek Timber Camp, dated November 2020. Jessica Hall
8/11/2022 Document, Report, or Work plan Review - other ADEC sent comments to Tyonek Native Corporation, Inc. for “Environmental Site Assessment Workplan”, dated April 2022. A revised workplan was requested to be submitted for review. Jessica Hall
9/12/2022 Document, Report, or Work plan Review - other ADEC sent comments to Tyonek Native Corporation, Inc. for “Environmental Site Assessment Workplan”, dated April 2022. A revised workplan was requested to be submitted for review. Jessica Hall
9/19/2022 Site Characterization Workplan Approved ADEC sent approval to Tyonek Native Corporation on the “Environmental Site Assessment Workplan”, dated April 2022, and received via electronic mail August 26, 2022. Jessica Hall
10/19/2022 Update or Other Action Site characterization work to begin on Wednesday and Thursday this week. Jessica Hall
4/26/2023 Document, Report, or Work plan Review - other ADEC reviewed and sent comments on the "Environmental Site Assessment Report for Tyonek Timber Camp 2022", dated October 2022. A revised report was requested to be submitted for review. Dawn Wilburn
6/16/2023 Site Characterization Report Approved Sent RP approval for 2022 Environmental Site Assessment-Tyonek Timber Camp, dated October 2022. Report summarized site characterization work completed at the heating oil tank site which consisted of soil excavation and sampling. No contamination was found in the soil. DEC request a new work plan addressing site characterization of the well house source area. Dawn Wilburn
9/11/2023 Document, Report, or Work plan Review - other ADEC reviewed and sent comments to RP on the "Addendum to Environmental Site Assessment Workplan-Tyonek Timber Cam." A revised report was requested to be submitted for review. Dawn Wilburn
9/13/2023 Site Characterization Report Approved Sent RP approval letter for revised report Addendum to: Environmental Site Assessment Workplan, dated July 15 and received on September 13, 2023. This workplan outlines the investigation for petroleum contamination around the well house at the Tyonek Timber Camp site. Dawn Wilburn
2/1/2024 Document, Report, or Work plan Review - other Sent RP comments on Environmental Site Assessment Addendum from the well house area investigation in October 2023. Requested revised report. Dawn Wilburn
2/1/2024 Document, Report, or Work plan Review - other Received response to DEC comments sent 1/31/2024 from RP's consultant for the Environmental Site Assessment Addendum from the well house area investigation in October 2023. Requested additional revisions to the document via email. Dawn Wilburn
3/29/2024 Site Characterization Report Approved Sent RP approval letter for the addendum to "Environmental Site Assessment Report," dated October 2023. This addendum included the soil investigation around the well house at the site. Excavation pits were advanced on the west side and around the south east corner of the building to a depth of 18 feet below ground surface. Field screening did not indicate contamination was present. Two analytical samples were collected and analyzed for gasoline range organics (GRO), diesel range organics (DRO), volatile organic compounds (VOC), and polynuclear aromatic hydrocarbons (PAH). All analytes were non-detect. Dawn Wilburn
4/17/2024 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 71985 UST & Well House. Dawn Wilburn

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details

Requirements

Description Details

There are no documents for this site report.

No associated sites were found.