Action Date |
Action |
Description |
DEC Staff |
9/17/1990 |
Update or Other Action |
Spill notification certified letter sent to Tyonek Native Corporation on this date for Oil Spill #90230124901. |
Grant Lidren |
9/17/1990 |
Update or Other Action |
On this date, a surface water samples were collected from the lake adjacent to the surface water intake and a water sample was collected from within the well house from the vertical riser. both samples were ND. However, the well house contained a strong hydrocarbon odor and the floor was stained with petroleum products. |
Grant Lidren |
6/20/1991 |
Site Characterization Workplan Approved |
On this date, ADEC approved the Draft Work Plan Quality Assurance Plan Quality Control Plan Fuel Tank Investigation Tyonek Timber Camp submitted by Wooward-Clyde Consultants dated April 1991. |
Don Fritz |
11/6/1992 |
Site Added to Database |
Petroleum contamination. |
Former Staff |
12/9/1992 |
Site Ranked Using the AHRM |
Initial ranking. |
Former Staff |
8/17/1993 |
Update or Other Action |
(Old R:Base Action Code = TECH - Technical Assistance). Provided TECH to CIRI and TNC. regarding cleanup levels and cleanup procedures for this site. |
Former Staff |
8/23/1993 |
Update or Other Action |
(Old R:Base Action Code = TECH - Technical Assistance). Discussed cleanup levels with site contractor. Cleanup levels revised based on adjacent lake being utilized as DW source. |
Former Staff |
9/16/1993 |
Update or Other Action |
(Old R:Base Action Code = SA2R - Phase II SA Review (CS)). Reviewed excavation closure proposal from Chemtrack. Sent letter requesting additional data to review closure plans. Also reviewed long term storage plans. |
Former Staff |
9/20/1993 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Reviewed long term contaminated soil stockpiling plan. Requested additional information from consultant. |
Former Staff |
9/22/1993 |
Update or Other Action |
(Old R:Base Action Code = SA2R - Phase II SA Review (CS)). Additional excavation sampling data reviewed. Approval given to backfill the excavations. |
Former Staff |
9/28/1993 |
Update or Other Action |
(Old R:Base Action Code = TECH - Technical Assistance). Daily technical assistance with consultant, Tyonek Native Corporation and CIRI concerning the status of the cleanup and long term storage cell plan review between 9/28/93 thru 10/1/93. The department is waiting for additional information to complete the review. |
Former Staff |
11/15/1993 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Sent letter to Chem Track, consultants for RP, as to status of long term soil stockpiling plans. Plans are incomplete. If not completed shortly, they will not have the long term cell completed prior to the onset of winter. |
Former Staff |
8/15/1994 |
Update or Other Action |
(Old R:Base Action Code = SI - Site Investigation). |
Donald Seagren |
10/19/1994 |
Update or Other Action |
(Old R:Base Action Code = FI - Field Inspection (General)). Tyonek heating fuel USTs. |
Former Staff |
5/10/2004 |
Update or Other Action |
File number assigned and entered into the Fileroom DB and CS DB. |
Alyce Hughey |
8/4/2004 |
Update or Other Action |
Sent letter requesting copy of assessment report approved in 91. If assessment not conducted, work plan must be updated, based on current regulations, prior to conducting the assessment. |
Donald Seagren |
10/21/2005 |
GIS Position Updated |
Using Figures 1 and 2 from a Work Plan Quality Assurance Plan Quality Control Plan, from Woodward-Clyde Consultants, dated November 30, 1990, in conjunction with TopoZone Pro and the KPB Parcel Lookup, entered the coordinates for this site. Metadata includes No Topo Basemap, TopoZone Pro Street Maps, Black and White Aerial Photo, on a Medium Size Map, View Scale 1:10,000, Coordinate Datum NAD83. High degree of confidence in accuracy of location. |
Alyce Hughey |
5/9/2007 |
Exposure Tracking Model Ranking |
|
Donald Seagren |
6/11/2008 |
Update or Other Action |
Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. |
Alyce Hughey |
6/3/2009 |
Update or Other Action |
File transferred from Soldotna to Anchorage 6-3-09. Project Manager changed from Paul Horwath to Linda Nuechterlein to Grant Lidren. |
Alyce Hughey |
4/15/2010 |
Update or Other Action |
In April 2010, a Class B public drinking water well was advanced 1,000 feet north of the Tyonek Timber Camp contaminated site at the coordinates: 61.049834, -151.200199. The drinking water well is 137 feet bgs and supplies the AK Division Inc., Tyonek Duplex Housing. |
Grant Lidren |
3/4/2013 |
Update or Other Action |
File Transferred from Anchorage to Soldotna. Project manager changed from Grant Lidren to Paul Horwath. |
Annie Ariel |
1/10/2020 |
Workplan Requested |
Work Plan Request Letter sent to RP. |
Jessica Hall |
2/4/2020 |
Update or Other Action |
David Kroto who works with Land and Natural Resources (907-272-0707 dkroto@tyonek.com) at 12:50 pm. They are looking for an extension for the Work Plan submittal and are planning to have Environmental Compliance Consultants (ECC) prepare a work plan, but will not ready for submittal by February 29th. They are requesting an extension.
|
Jessica Hall |
3/9/2020 |
Workplan Requested |
Over due Work Plan Request Letter sent to the RP. |
Jessica Hall |
3/13/2020 |
Update or Other Action |
David L Kroto, Lands Administrator of Tyonek Native Corporation emailed and said Environmental Compliance Consultants (ECC) will do a site visit this summer to help them better prepare a work plan for submittal to ADEC. |
Jessica Hall |
10/29/2020 |
Document, Report, or Work plan Review - other |
ADEC reviewed and sent comments on the Draft Site Characterization Work Plan for Tyonek Native Corporation Tyonek Timber Camp, dated September 2020. Updates were requested to be included in the Final Work Plan. |
Jessica Hall |
3/11/2021 |
Site Characterization Workplan Approved |
ADEC Sent the RP an Approval Letter for the Draft Site Characterization Work Plan for Tyonek Native Corporation Tyonek Timber Camp, dated November 2020. |
Jessica Hall |
8/11/2022 |
Document, Report, or Work plan Review - other |
ADEC sent comments to Tyonek Native Corporation, Inc. for “Environmental Site Assessment Workplan”, dated April 2022. A revised workplan was requested to be submitted for review. |
Jessica Hall |
9/12/2022 |
Document, Report, or Work plan Review - other |
ADEC sent comments to Tyonek Native Corporation, Inc. for “Environmental Site Assessment Workplan”, dated April 2022. A revised workplan was requested to be submitted for review. |
Jessica Hall |
9/19/2022 |
Site Characterization Workplan Approved |
ADEC sent approval to Tyonek Native Corporation on the “Environmental Site Assessment Workplan”, dated April 2022, and received via electronic mail August 26, 2022. |
Jessica Hall |
10/19/2022 |
Update or Other Action |
Site characterization work to begin on Wednesday and Thursday this week.
|
Jessica Hall |
4/26/2023 |
Document, Report, or Work plan Review - other |
ADEC reviewed and sent comments on the "Environmental Site Assessment Report for Tyonek Timber Camp 2022", dated October 2022. A revised report was requested to be submitted for review. |
Dawn Wilburn |
6/16/2023 |
Site Characterization Report Approved |
Sent RP approval for 2022 Environmental Site Assessment-Tyonek Timber Camp, dated October 2022. Report summarized site characterization work completed at the heating oil tank site which consisted of soil excavation and sampling. No contamination was found in the soil. DEC request a new work plan addressing site characterization of the well house source area. |
Dawn Wilburn |
9/11/2023 |
Document, Report, or Work plan Review - other |
ADEC reviewed and sent comments to RP on the "Addendum to Environmental Site Assessment Workplan-Tyonek Timber Cam." A revised report was requested to be submitted for review. |
Dawn Wilburn |
9/13/2023 |
Site Characterization Report Approved |
Sent RP approval letter for revised report Addendum to: Environmental Site Assessment Workplan, dated July 15 and received on September 13, 2023. This workplan outlines the investigation for petroleum contamination around the well house at the Tyonek Timber Camp site. |
Dawn Wilburn |
2/1/2024 |
Document, Report, or Work plan Review - other |
Sent RP comments on Environmental Site Assessment Addendum from the well house area investigation in October 2023. Requested revised report. |
Dawn Wilburn |
2/1/2024 |
Document, Report, or Work plan Review - other |
Received response to DEC comments sent 1/31/2024 from RP's consultant for the Environmental Site Assessment Addendum from the well house area investigation in October 2023. Requested additional revisions to the document via email. |
Dawn Wilburn |
3/29/2024 |
Site Characterization Report Approved |
Sent RP approval letter for the addendum to "Environmental Site Assessment Report," dated October 2023. This addendum included the soil investigation around the well house at the site. Excavation pits were advanced on the west side and around the south east corner of the building to a depth of 18 feet below ground surface. Field screening did not indicate contamination was present. Two analytical samples were collected and analyzed for gasoline range organics (GRO), diesel range organics (DRO), volatile organic compounds (VOC), and polynuclear aromatic hydrocarbons (PAH). All analytes were non-detect. |
Dawn Wilburn |
4/17/2024 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 71985 UST & Well House. |
Dawn Wilburn |