Action Date |
Action |
Description |
DEC Staff |
2/15/1995 |
Update or Other Action |
RFI?CMS Final Report, Volume 9, Site 17/23 - Old Power Plant submitted |
Donald Seagren |
8/11/1995 |
Update or Other Action |
USCG requests approval to stockpile contaminated soils generated from oily water separator and UST removal and replacemnt projects, prior to construction of the propose bio-venting storage cells. |
Donald Seagren |
8/14/1995 |
Update or Other Action |
USCG submits UST closure notices and request a waiver of the 15 day advance closure notice requirement |
Donald Seagren |
11/9/1995 |
Site Added to Database |
Site added to database. |
Kent Patrick-Riley |
11/28/1995 |
Site Ranked Using the AHRM |
Site ranked. Score = 15. |
Kent Patrick-Riley |
1/2/1996 |
Update or Other Action |
USCG submits proposed approach for closure of USTs. Further site characterization, remedial actions and final closure will occur under the RCRA Consent Order. |
Donald Seagren |
4/10/1996 |
Update or Other Action |
ADEC conditionally approves USCG approach for closure of UST N6 |
Rich Sundet |
8/22/1996 |
Update or Other Action |
Corrective Measures Study Work Plan submitted |
Donald Seagren |
9/10/1996 |
Meeting or Teleconference Held |
USCG holds public meeting on Kodiak |
Donald Seagren |
9/17/1996 |
Update or Other Action |
EPA provides comments on technical review of draft CMS work plan |
Donald Seagren |
10/16/1996 |
Update or Other Action |
USCG responds to EPA comments on draft CMS work plan |
Donald Seagren |
11/26/1996 |
Update or Other Action |
EPA provides technical comments on CMS and Risk Assessment work plans |
Donald Seagren |
12/30/1996 |
Update or Other Action |
ADEC letter informaing USCG about reorganization and areas of responsibility |
Rich Sundet |
1/17/1997 |
Update or Other Action |
USCG submits proposed approach for closure of UST P30. They pro[pose NFA under UST regulations and additional work leading to site closure done under RCRA Consent Order. |
Donald Seagren |
5/15/1997 |
Update or Other Action |
Draft CMS , Site 23 submitted |
Donald Seagren |
5/19/1997 |
Update or Other Action |
USCG submits request to remove heating oil tanks (P26 and P29) from UST database/regulations and cleanup under RCRA Consent Order |
Donald Seagren |
7/15/1997 |
Update or Other Action |
Shannon and Wilson submits figures omitted form Draft CMS |
Donald Seagren |
10/15/1999 |
Update or Other Action |
EPA grants extension for submital of revised CMS. Report is now due 31 March 01 |
Donald Seagren |
4/3/2001 |
Update or Other Action |
Review Final Corrective Measures Study and Risk Assmessment report |
Donald Seagren |
5/24/2002 |
Update or Other Action |
Sent letter with review comments on Final CMS. |
Donald Seagren |
7/19/2002 |
Record of Decision |
10 X rule ROD for Nyman Peninsula signed by Frechione. |
Donald Seagren |
10/24/2002 |
Update or Other Action |
Draft Remedial Work Plan reviewed. Discused PCB cleanup levels with Tim Stott. |
Donald Seagren |
11/18/2002 |
Update or Other Action |
Provided USCG and EPA comments on Draft Renedial Work plan. |
Donald Seagren |
12/2/2002 |
Cleanup Plan Approved |
Reviewed PCB Remediation and Sampling plan. Issued conditional approval with correction of definition of what is surface and sub-surface soil. |
Donald Seagren |
6/5/2003 |
Update or Other Action |
Reviewed Sample and Analysis Plan, Site 23, PCB Remediation, dated 14 May 03. Work being ocnducted the week of 2 June 03. |
Donald Seagren |
9/16/2003 |
Update or Other Action |
Reviewed PCB Contaminated Soil characterization, Removal and Disposal report dated 2 September 03. 330 tons of PCB contaminated soil removed from the site (230 tons disposed of as RCRA HW). Lateral extent of PCB contamination has not yet been delineated. Further characterization of soil and GW required. |
Donald Seagren |
2/4/2004 |
Long Term Monitoring Established |
Reviewed and approved Groundwater Monitroing Work Plan, Site 23, Old Power Plant, USCG, ISC Kodiak, Kodiak, Alaska January 2004. |
Donald Seagren |
6/17/2004 |
Update or Other Action |
File number assigned and entered into the Fileroom DB and CS DB. |
Alyce Hughey |
10/22/2004 |
Site Characterization Workplan Approved |
Reviewed and approved Supplemental Corrective Measures Study Work plan. The asssessment will address possible PCB contamination in surface sils and sediments downgradient of Building 12. |
Donald Seagren |
1/19/2006 |
Meeting or Teleconference Held |
Contaminated Sites staff participated in a Kodiak Island Borough Assembly meeting to discuss the recent documents available for the review and the field work the COE will be doing this summer in the island. The COE and DEC were interviewed on public radio to discuss the Kodiak projects and overall contaminated site cleanup process. There was also a public open house to give community members the opportunity to bring up concerns and ask questions in person. As typical for Kodiak turn out was light |
Janice Brinck |
3/16/2006 |
Update or Other Action |
Contaminated Sites staff reviewed a Supplemental Corrective Measures Study, PCB removal Report and a Groundwater Monitoring Report for Site 23 on the Coast Guard Base in Kodiak. Site 23 was the power plant for the base from 1940’s to 1978. A PCB cleanup on the west side of the building has removed about 400-tons of soil over action levels. Low level PCBs have been detected in surface soils and sediment downgradient of the former power plant. Aroclor 1260 has been detected in groundwater in five monitoring wells below cleanup levels. Diesel Range Organics (DRO) is present in groundwater above cleanup levels in wells near the building |
Jeff Brownlee |
7/17/2006 |
Cleanup Assumed by ADEC |
Site inlcuded in the USCG Land Use Control Assurance Plan. |
Jeff Brownlee |
9/14/2006 |
Update or Other Action |
Contaminated Sites staff reviewed a Land Use Assurance Plan for Environmental Activities for the U.S. Coast Guard Base in Kodiak. The document outlines a plan to track institutional controls (ICs) at the various contaminated sites on base. There are currently about fifteen sites on base with institutional controls. The plan objective is for the Coast Guard Environmental Section to screen contractor and other activity such as above or below ground construction, well drilling, etc. against the sites listed in the plan. Work can then be tailored to meet any existing ICs |
Jeff Brownlee |
9/19/2006 |
Update or Other Action |
Staff participated in site inspections at several Formerly Used Defense Sites and Coast Guard sites at Kodiak. The EPA and Coast Guard also participated in the inspections. Remedial actions were being conducted at Drury Gulch, Airport Staging Area Fire Training Pit and Building A-711. The team spent a fair amount of time going over historic data with the contractor for the PCB cleanup at Drury Gulch. We also observed a test run of direct push sampling using a Geoprobe rig at the gulch for sampling data gap areas that were erroneously backfilled due to an extraction method error at the lab |
Jeff Brownlee |
3/15/2007 |
Update or Other Action |
CS staff reviewed a Polychlorinated biphenyl (PCBs) characterization report for the Old Power Plant (Site 23) on the Coast Guard Base in Kodiak. PCBs were detected in surface soil above the cleanup level of 1 mg/kg. Subsurface samples were clean, but sampling was limited in some areas due to utility set back requirements. An estimated 425 cubic yards of PCB impacted material needs to removed from several areas near the building. Groundwater monitoring doesn’t show any impacts from PCBs |
Jeff Brownlee |
4/15/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Jeff Brownlee |
8/12/2008 |
Site Visit |
Contaminated Sites staff conducted site inspections with the EPA and Coast Guard at several Formerly Used Defense Sites (FUDS) and Coast Guard sites on Kodiak Island. Field work had been done this season at Building A-711, Building A-141, Drury Gulch, Airport Staging Area, and the Site 3 Laundry. PCB and TCE soil removals have been completed at Drury Gulch and the contractor is working on the cap over the entire gulch and the drainage channel realignment. The biosparging pilot study at the Fire Training Pit is being evaluated and the cleanup team has decided to go back to the feasibility study and consider other remedial alternatives for the site |
Jeff Brownlee |
1/22/2009 |
Meeting or Teleconference Held |
Contaminated Sites staff participated with the Corps of Engineers in a Kodiak Island Borough Assembly meeting and a public open house to discuss Formerly Used Defense Sites on Kodiak Island. An update was provided on sites currently being worked on including Drury Gulch, Buskin Beach, Airport Staging Area, and Building A-711 |
Jeff Brownlee |
11/16/2009 |
Document, Report, or Work plan Review - other |
ADEC received and reviewed the June 2009 Quarterly Groundwater Sampling and Analysis Report. Groundwater from eight monitoring wells were sampled as part of the semiannual monitoring effort as required under the USCG-Kodiak EPA RCRA permit. Two monitoring wells exibited total PCB concentrations above the marine surface water screening level, but below the ADEC groundwater cleanup level. Three PAH compounds - benzo(a)pyrene, benzo(b)fluoranthene, and dibenzo(a,h)anthracene were detected above the respective ADEC groundwater cleanup levels in June 2009. |
Curtis Dunkin |
9/23/2010 |
Site Visit |
During an annual site prioritization meeting on Kodiak with representatives from the EPA, USCG, USACE, and ADEC, contaminated sites staff conducted site visits at the following Kodiak USCG sites: Site 3 Laundry, Site 06B Nyman Peninsula, Site 23 Old Power Plant, Site 22, and Site 6A Mogas Tanks. |
Curtis Dunkin |
5/18/2018 |
Document, Report, or Work plan Review - other |
ADEC reviewed the draft 2018 Storis Drive Geotechnical and Waterline Construction Sampling and Analysis Plan and submitted comments to the U.S. Coast Guard. |
Curtis Dunkin |
6/20/2018 |
Document, Report, or Work plan Review - other |
ADEC received and reviewed the USCG's responses to comments for the draft 2018 Storis Drive Geotechnical and Waterline Construction Sampling and Analysis Plan. ADEC participated in a comment resolution and technical planning meeting with representatives from the EPA, USCG, and their respective technical support teams and submitted approval to the USCG to finalize the document and implement the plan in the field. |
Curtis Dunkin |
9/27/2018 |
Site Visit |
ADEC traveled to Kodiak, AK and participated in a day-long annual planning meeting and conducted site inspections with project delivery team representatives from the USCG and Environmental Protection Agency. |
Curtis Dunkin |
7/10/2019 |
Meeting or Teleconference Held |
ADEC traveled to Seattle, WA and participated in two days of technical planning and project status update and prioritization meetings with representatives from the US Coast Guard, US Environmental Protection Agency, and their respective contracted technical support. |
Curtis Dunkin |
7/10/2019 |
Meeting or Teleconference Held |
ADEC traveled to Seattle, WA and participated in two days of technical planning and project status update and prioritization meetings with representatives from the US Coast Guard, US Environmental Protection Agency, and their respective contracted technical support. |
Curtis Dunkin |
8/22/2019 |
Site Visit |
ADEC traveled to the USCG Base Station, Kodiak and participated in two full days (August 21-22, 2019) of site inspections and technical project team meetings with representatives from the EPA, USCG, and their respective contracted technical support. |
Curtis Dunkin |
3/25/2020 |
Document, Report, or Work plan Review - other |
ADEC reviewed the draft 2020 Site 23 Remedial Investigation Work Plan and participated in a technical planning and comment resolution meeting via tele-Web with representatives from the US Coast Guard, the US Environmental Protection Agency, and their respective contracted technical support. |
Curtis Dunkin |
4/1/2020 |
Meeting or Teleconference Held |
ADEC participated in a technical planning and comment resolution meeting via tele-Web for the draft 2020 Site 23 Remedial Investigation Work Plan with representatives from the US Coast Guard, the US Environmental Protection Agency, and their respective contracted technical support. |
Curtis Dunkin |
7/22/2020 |
Meeting or Teleconference Held |
ADEC participated in annual project prioritization meetings on July 21 and 22 with representatives from the US Coast Guard, the Environmental Protection Agency, and respective contracted project technical support and implementation teams. The purpose of the annual meetings are for stakeholders to provide respective site status updates, conduct technical planning and site prioritization, and scheduling for implementation of projects through the current and upcoming fiscal years. |
Curtis Dunkin |
12/15/2020 |
Document, Report, or Work plan Review - other |
ADEC reviewed the draft 2020 Storis Drive Pre-Construction Site Investigation Report and the draft 2020 Storis Drive Construction Environmental Management Plan and submitted comments to the U.S. Coast Guard. The project will involve multiple phases implemented over several years across multiple sites that are adjacent to Inner Womens Bay. |
Curtis Dunkin |
4/1/2021 |
Document, Report, or Work plan Review - other |
ADEC reviewed the responses to comments as well as the redline and revised draft documents for the draft 2020-21 Storis Drive Waterline Replacement Environmental Management Plan. ADEC submitted review determinations and additional comments to the USCG, including conditional approval for the USCG to finalize the document; conditional that the USCG develop and submit additional detailed work plans for regulatory review and approval which are more specific to the contaminated site management concerns within the specified areas of concern that will be specific to each of the three separate phases of the project. |
Curtis Dunkin |
5/7/2021 |
Document, Report, or Work plan Review - other |
ADEC reviewed the draft April 2021 FDCC-OPC-FRC Investigation Sampling and Analysis Plan and submitted review comments to the USCG. |
Curtis Dunkin |
6/16/2021 |
Site Characterization Workplan Approved |
ADEC participated in a comment resolution meeting with the USCG project team on May 20, 2021 for the draft 2021 OPC/FRC Sampling and Analysis Plan; and after which ADEC received and reviewed revised responses to comments from the USCG. The USCG's primary work plan objectives involve focused geotechnical and environmental characterization activities to facilitate the development of an environmental management plan that will support the implementation of the prospective OPC/FRC construction project. ADEC completed its review of the revised responses to comments as well as the revised redline and final versions of the work plan and submitted written approvals of the documents to the USCG and project team, including approval for the USCG to implement the plan in the field. |
Curtis Dunkin |
7/28/2021 |
Document, Report, or Work plan Review - other |
ADEC reviewed the draft 2021 Base Kodiak Monitoring Well Decommissioning Work Plan and submitted comments to the USCG. |
Curtis Dunkin |
8/3/2021 |
Site Visit |
ADEC participated in annual project delivery team meetings at the USCG Base Kodiak with representatives from the USCG, EPA, and their respective contracted technical support representatives, and conducted site visits and inspections of the active USCG Kodiak sites. |
Curtis Dunkin |
11/15/2021 |
Document, Report, or Work plan Review - other |
DEC reviewed and submitted comments on the Draft Environmental Sampling Report for the OPC/FRC Homeport. The report detailed results from soil borings, temporary and permanent monitoring wells, and sediment borings to support the design and construction of an Offshore Patrol Cutters and Fast Response Cutters Homeport. One onshore soil sample and one sediment sample showed DRO above MtG CULs, and the temporary MWs were not developed or screened and showed exceedances of DRO, RRO, chloroform, lead, and mercury. DEC requested further characterization. |
Tim Sharp |
1/28/2022 |
Document, Report, or Work plan Review - other |
ADEC reviewed the responses to comments and the redline revised draft final 2022 Monitoring Well Decommissioning Work Plan and submitted review determinations and approvals to the USCG to finalize the document and and implement the work plan in the field. |
Curtis Dunkin |
2/3/2022 |
Meeting or Teleconference Held |
ADEC reviewed the USCG's technical implementation proposal and preliminary draft design documents in support of the prospective Offshore Patrol Cutter/Fast Response Cutter Construction project that is planned for implementation in 2022-23 and participated in a technical planning meeting with the USCG, EPA, and their respective contracted technical support teams. |
Curtis Dunkin |
3/26/2022 |
Document, Report, or Work plan Review - other |
ADEC reviewed the revised draft 2022 USCG Storis Waterline Construction Environmental Management Plan and submitted comments to the USCG. |
Curtis Dunkin |
4/8/2022 |
Document, Report, or Work plan Review - other |
ADEC issued final approval to the USCG for the final 2022 Kodiak Storis Waterline Construction Environmental Management Plan. |
Curtis Dunkin |
4/26/2022 |
Document, Report, or Work plan Review - other |
ADEC reviewed the responses to comments on the draft 2021 OPC/FRC Homeport Environmental Sampling Report and submitted determinations and additional comments to the USCG. |
Curtis Dunkin |
7/29/2022 |
Site Characterization Workplan Approved |
DEC issued approval to the U.S. Coast Guard for the "Final (Revision) Supplemental RCRA Facility Investigation/Uniform Federal Policy for Quality Assurance Project Plan, Site 23 Old Power Plant, RCRA Solid Waste Management Unit, U.S. Coast Guard Base Kodiak, Kodiak, Alaska” revised July 2022. The document describes proposed sampling of soil, sediment, groundwater, and surface water for contaminants including diesel range organics, residual range organics, volatile organic compounds, polycyclic aromatic hydrocarbons, and polychlorinated biphenyls as part of determining nature and extent of contamination at Kodiak’s Site 23. The sampling is intended to evaluate the potential for impacts from contamination migrating through groundwater to Inner Women’s Bay. |
Melinda Brunner |
8/1/2022 |
Document, Report, or Work plan Review - other |
ADEC reviewed the revised final 2022 OPC/FRC Homeport Environmental Sampling Report and submitted a final approval letter to the U.S. Coast Guard. |
Curtis Dunkin |
8/1/2022 |
Document, Report, or Work plan Review - other |
ADEC reviewed the draft 2022 OPC/FRC Homeport Phase I Construction Environmental Management Plan and submitted comments to the U.S. Coast Guard. |
Curtis Dunkin |
8/25/2022 |
Document, Report, or Work plan Review - other |
ADEC reviewed the responses to comments and the revised draft 2022 OPC/FRC Environmental Management Plan and submitted review determinations to the U.S. Coast Guard. ADEC also participated in comment resolution and technical planning meetings with the USCG project team on August 18 and 25, 2022 in support of additional revisions and amendments to the plan. |
Curtis Dunkin |
9/8/2022 |
Document, Report, or Work plan Review - other |
ADEC reviewed the final 2022 Kodiak USCG Homeport OPC/FRC Environmental Management Plan and issued an approval letter to the U.S. Coast Guard accepting the final plan and also approval for the field team to implement the plan in the field. |
Curtis Dunkin |
9/13/2022 |
Meeting or Teleconference Held |
ADEC participated in two full days of annual project delivery team meetings with representatives from the USCG, EPA, and their respective contracted technical support staff. |
Curtis Dunkin |
9/23/2022 |
Offsite Soil or Groundwater Disposal Approved |
DEC approved transport of approximately 48 cubic yards of contaminated soil generated during implementation of the “Final 2022 USCG Kodiak Storis Water Main Replacement Environmental Management Plan (EMP)” to Roosevelt Regional Landfill in Seattle, WA. |
Melinda Brunner |
10/27/2022 |
Site Visit |
DEC conducted site visits with the USCG on 27 OCT 2022 at the USCG's Buskin Lake Commdet Tower Field, Buskin River Army/Navy USTs, Former Nemetz Housing, Site 6A, Site 03 Laundry, Site 06B Nyman Penin FF, Site 07A Barrel Stor. 1, Site 23 Old Power Plant, and Site 32 Marine Sediment sites to evaluate current conditions, including discussion of land use control implementation. |
Melinda Brunner |
4/20/2023 |
Document, Report, or Work plan Review - other |
ADEC reviewed the draft 2023 N6A Lift Station Construction Environmental Managment Plan and submitted comments to the U.S. Coast Guard. |
Curtis Dunkin |
4/27/2023 |
Document, Report, or Work plan Review - other |
ADEC reviewed the responses to comments, and the revised redline and final 2023 USCG Kodiak OPC-FRC Homeport Phase I Monitoring Well and Corrugated Metal Pipe Closure Plans and submitted review determinations and respective approvals for the final documents as well as approval for the USCG to implement the plan in the field. |
Curtis Dunkin |
5/15/2023 |
Document, Report, or Work plan Review - other |
ADEC reviewed the responses to comments and revised redline final documents for the draft 2023 N6A Lift Station Environmental Management Plan and submitted review determinations and approvals to the U.S. Coast Guard to finalize the document and to implement the plan in the field. |
Curtis Dunkin |
3/22/2024 |
Offsite Soil or Groundwater Disposal Approved |
ADEC reviewed the draft 2024 Phase II Storis Waterline Replacement Stockpile Characterization Report and Transport/Disposal Approval form associated with 420 cubic yards of stockpiled soil generated in 2023 from Phase II excavations and Environmental Management Plan implementation activities. ADEC submitted a review determination, disposal approval letter, and signed approved disposal form to the U.S. Coast Guard. |
Curtis Dunkin |