| Action Date |
Action |
Description |
DEC Staff |
| 5/28/1990 |
Interim Removal Action Approved |
(Old R:Base Action Code = SC - Site Control (Emergency Response)). ARRC contracted VRCA to respond to 165,420 gallon diesel and jet fuel spill at Dunbar siding. By 6/15/90, and estimated 81,000 gallons of product was recovered. |
Former Staff |
| 9/6/1990 |
Site Added to Database |
Jet A, diesel #2 and #4 fuel. |
Former Staff |
| 12/11/1990 |
Update or Other Action |
(Old R:Base Action Code = SI - Site Investigation). Draft site assessment of Dunbar Siding derailment and spill. Soil samples indicated up to 62,000 ppm TPH, 307 ppm xylenes, and up to 42 ppm PNAs. Groundwater samples collected in 8/90 and 9/90 showed up to 81 ppb TPH, 238 ppb xylenes, and 0.3 ppb PNAs. Surface water samples collected in 6/90 and 7/90 from Goldstream Creek showed less than 10 ppb BTEX compounds and 23,000 ppb TPH. Surface water samples from the west and east ponds in 7/90 and 8/90 indicated up to 9230 ppb TPH. Sediment samples from the east and west ponds showed up to 680 ppm TPH and 0.38 ppm xylenes. Preliminary environmental assessment indicated reduced levels of microinvertebrates, no detectable PNA compounds in fish, and low levels of n-alkanes in fish muscle tissue. Eight birds, three beavers, one muskrat, one snowshoe hare, and one vole were found dead at or near the spill site. |
Former Staff |
| 12/27/1990 |
Site Ranked Using the AHRM |
Initial ranking by staff. |
Former Staff |
| 2/23/1993 |
Update or Other Action |
(Old R:Base Action Code = RPL2 - Site Information Request Letter). Sent PRP-CS Database Notification Letter to RP requesting update and more environmental information concerning contaminated site. No response from RP as of this "complete date". |
Jeff Peterson |
| 12/18/1995 |
Update or Other Action |
(Old R:Base Action Code = SI - Site Investigation). ADEC received a sample report from sampling in June 95. Results where groundwater is impacted (MW-6 600 ppb DRO); "Soil 5" - 11,000 ppm (0.5 ft) and 26,000 ppm (2.5 ft); "Soil 1" - 12,300 ppm DRO; "Soil 6" - 4,200 ppm DRO. Site will be transferred to Contaminated Sites. |
Deborah Williams |
| 11/18/1997 |
Update or Other Action |
Updated site based on comprehensive review and meeting with AKRR. |
Laura Noland |
| 4/9/1998 |
Site Characterization Workplan Approved |
(Old R:Base Action Code = RI - Remedial Investigation). Workplan describes soil, sediment, surface water and groundwater sampling to be conducted by ARRC contractor in July 1998. Samples will be analyzed for DRO, GRO, BTEX, PAHs, and TOC to determine organic content. Remedial options will be evaluated based on results. |
Laura Noland |
| 5/15/1998 |
Update or Other Action |
A Site Characterization workplan (for a portion of the site) was approved. |
Laura Noland |
| 9/1/1998 |
Update or Other Action |
Received report with soil and water samples collected during the summer 1998 field season. DRO levels in the soil still elevated. |
Deborah Williams |
| 6/29/1999 |
Update or Other Action |
Sent letter to ARRC with comments and concerns from the Department on the August 1998 that should be addressed. |
Deborah Williams |
| 8/6/1999 |
Update or Other Action |
Reminder letter. |
Deborah Williams |
| 9/22/1999 |
Update or Other Action |
ADEC sent letter to ARRC addressing the concerns in the 6/29/99 letter and reminding them of the 11/30/99 deadline in the Consent Decree. |
Jim Frechione |
| 11/3/1999 |
Update or Other Action |
ADEC sent letter to ARRC stating that the ADEC has not received a response, also reminding them of the 11/30/99 Consent Decree deadline. |
Jim Frechione |
| 11/5/1999 |
Update or Other Action |
Email from Susan Schrader (ARRC) to Jim Frechione (ADEC) requesting extension on the deadline in the Consent Decree. |
Jim Frechione |
| 11/17/1999 |
Update or Other Action |
ADEC sent letter to ARRC extending the deadline in the Consent Decree from 11/30/99 to 11/30/00. |
Jim Frechione |
| 5/24/2000 |
Cleanup Level(s) Approved |
ADEC sent a letter to ARRC approving method 3 ACLs for the site and requested more sampling be conducted at the site in order to adequately characterize the site. |
Deborah Williams |
| 11/9/2000 |
Update or Other Action |
Letter to ARRC regarding consent decree and site status. |
Jim Frechione |
| 11/14/2000 |
Update or Other Action |
Letter to ARRC regarding dates of consent decree. |
Jim Frechione |
| 2/9/2001 |
Update or Other Action |
Submittal from ARRC - proposal for third party evaluation of Dunbar soils. |
Renee Evans |
| 3/2/2001 |
Update or Other Action |
File number updated from 110.02.006 to 110.38.006. |
Mitzi Read |
| 3/13/2001 |
Update or Other Action |
Letter to ARRC regarding modeling and long-term monitoring requirements. |
Jim Frechione |
| 3/23/2001 |
Meeting or Teleconference Held |
Meeting with ARRC and Geosphere regarding development of 4 phase equations to assess migration to groundwater and inhalation pathways. |
Renee Evans |
| 8/21/2001 |
Update or Other Action |
Information from ARRC regarding 4-phase model - should be submitted in near future. |
Renee Evans |
| 9/15/2001 |
Update or Other Action |
Draft NFRAP request received. |
Renee Evans |
| 11/15/2001 |
Update or Other Action |
Request for NFRAP submitted by Geosphere. |
Renee Evans |
| 3/13/2002 |
Record of Decision |
ROD signed - Approval of ACLs, NFRAP and ICs. |
Renee Evans |
| 3/13/2002 |
Institutional Control Record Established |
Established of IC - Prior approval must be given by ADEC prior to moving soil offsite. Cleanup level approved - Method 3 - 6190 mg/kg - above most stringent Method 2 - 250 mg/kg. |
Renee Evans |
| 3/13/2002 |
Conditional Closure Approved |
Record of Decision issued on 3/13/02 - NFRAP with ICs. |
Renee Evans |
| 6/13/2012 |
Update or Other Action |
Staff changed from Grant Lidren to IC Unit. |
Kristin Thompson |
| 7/9/2012 |
Institutional Control Compliance Review |
IC review conducted. |
Evonne Reese |
| 7/9/2012 |
Institutional Control Record Removed |
This site meets the 2009 closure policy therefore ICs can be removed. The default requirement of no offsite transport of soil or groundwater from this site is still applicable. |
Evonne Reese |