Action Date |
Action |
Description |
DEC Staff |
5/1/1990 |
Update or Other Action |
(Old R:Base Action Code = MS - Monitoring/Sampling). Limited sampling conducted by Clark Engineering Co. at 5 locations resulted in TPH levels ranging from 2.8 - 423 ppm. Using Method 418.1. Subsequent sampling revealed that primary contaminant to be diesel. |
Former Staff |
7/25/1990 |
Interim Removal Action Approved |
(Old R:Base Action Code = REM - Removal / Excavation). 2,000 gallon tank removal. No holes in the tank were observed. Soil contamination encountered at the piping. PID readings were interpreted for gasoline, however further analysis revealed taht the primary contaminant is diesel, therefore more contamination could be present in the excavation hole. Not a clean hole. Information based on Shannon and Wilson report dated 8/29/90. Also excavated floor drain area and septic system area storing contaminated soils on site. Contaminated soils are still under the building when excavation had to halt due to threat to buildings structure. Drinking water well tested at 0.5 ppm TPH no BTEX detected. |
Former Staff |
2/1/1991 |
Site Added to Database |
Approximate date of add due to computer problems. Petroleum contaminated site with tank closure. |
Former Staff |
3/13/1991 |
Site Ranked Using the AHRM |
Site initially ranked by staff. Quantity Value unknown. |
Former Staff |
1/14/1994 |
Update or Other Action |
(Old R:Base Action Code = RPL2 - Site Information Request Letter). Sent PRP-CS Database Notification Letter to RP requesting update and more environmental information concerning contaminated site. Letter returned - Forwarding address was expired. Need to do RP address search to notify RP. (try P.O. Box 73454, 99709)? |
Jeff Peterson |
3/28/1996 |
Site Ranked Using the AHRM |
Site reranked by staff, score was 72. |
Shah Alam |
6/13/1996 |
Update or Other Action |
(Old R:Base Action Code = RDRA - Remedial Design / Remedial Action). Evans Industries requested to thermally remediate the stockpiled fuel contaminated soil. |
Shah Alam |
10/21/1996 |
Update or Other Action |
ADEC received water sample analyses results from Evans Industires consultant NORTECH. No BTEX and TPH compounds were detected. |
Shah Alam |
12/22/1997 |
Update or Other Action |
ADEC received a "Site Remediation Report" from Evans Industries. The report documented thermal remediation and impermeable membrane installation. |
Shah Alam |
5/8/1998 |
Update or Other Action |
Robert Evans of Evans Industries requested a closure letter. ADEC staff informed that institutional control needed to be recorded before closure. Evans Industries did not proceed with recording the institutional control. |
Shah Alam |
10/15/1999 |
Site Ranked Using the AHRM |
Site reranked. |
Shah Alam |
5/12/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Neal Everson |
1/2/2013 |
Update or Other Action |
Site symbol adjusted visually using ArcGIS.com, Google satellite imagery, and historical documents from the file. |
Laurel Gale |
7/6/2018 |
Update or Other Action |
DEC sent letter to Evans Industrial requesting update on contaminated site. Deadline of August 15, 2018. |
Janice Wiegers |
7/6/2018 |
Potentially Responsible Party/State Interest Letter |
DEC sent letter of state's interest to Evans Industrial as a potentially responsible party. |
Janice Wiegers |
8/15/2018 |
Update or Other Action |
Letter submitted from Evans Industries responding to DEC's letter. Engineering controls in the form of impermeable membranes was installed in 1993. Evans indicated that a Notice of Condition Affecting Title was intended to be filed in 1991, but was apparently not filed. Evans plans to file this document in the next 30 days. |
Janice Wiegers |
8/30/2018 |
Update or Other Action |
Called Evans Industries to discuss options for recording a notice and pending file review. Property may be subdivided. Plan to meet in October in Fairbanks to discuss. |
Janice Wiegers |
10/23/2018 |
Update or Other Action |
Received call from Robert Evans to discuss necessity of deed notice. ADEC will review file and evaluate site conditions against current closure requirements. |
Janice Wiegers |
2/15/2019 |
Meeting or Teleconference Held |
Meeting held with Mr. David Evans and Mr. Robert Evans to discuss site requirements that include an assessment of the vapor intrusion pathway and demonstration that groundwater is not being affected by the remaining contamination. They indicated they would retain a qualified environmental professional. Hand delivered prepared correspondence with requirements needed to move site towards closure. |
Megan Roberts |
8/7/2019 |
Document, Report, or Work plan Review - other |
Groundwater sampling workplan submitted for sampling the on-site drinking water well which is no longer in use. Plan was prepared by TPECI. |
Janice Wiegers |
8/7/2019 |
Document, Report, or Work plan Review - other |
Work plan submitted for Vapor Intrusion Assessment by Geosyntec Consultants. |
Janice Wiegers |
8/16/2019 |
Site Characterization Workplan Approved |
DEC approved groundwater sampling work plan prepared by TPECI and vapor intrusion assessment work plan prepared by Geosyntec Consultants. |
Rebekah Reams |
12/31/2019 |
Document, Report, or Work plan Review - other |
Report for a Vapor Intrusion Assessment by Geosyntec Consultants submitted on this date. Groundwater sampling of the on-site drinking water as described in the workplan submitted August 7, 2019 has not been completed. |
Rebekah Reams |
3/12/2020 |
Document, Report, or Work plan Review - other |
DEC provided comments on the Report for a Vapor Intrusion Assessment by Geosyntec Consultants submitted on December 31, 2020. |
Rebekah Reams |
9/4/2020 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 72052 2000-g tank and other spills. |
Rebekah Reams |
11/25/2020 |
Update or Other Action |
Sent correspondence requesting groundwater sampling from the on site drinking water well be completed as was proposed in the work plan approved by DEC on August 16, 2019. |
Rebekah Reams |
1/5/2021 |
Update or Other Action |
Received correspondence from Evans Industries, Inc. regarding sampling of the drinking water well on site. Evans Industries, Inc will proceed with sampling the drinking water well under the work plan that was prepared by Travis Peterson Environmental, Inc. and approved by DEC on August 16, 2019. |
Rebekah Reams |