Action Date |
Action |
Description |
DEC Staff |
1/23/1992 |
Site Added to Database |
|
Former Staff |
9/8/1992 |
Update or Other Action |
(Old R:Base Action Code = RPL2 - Site Information Request Letter). Sent PRP-CS Database Notification letter to RP requesting update and more environmental information concerning contaminated site. Jim Levine\COE called 10-5-92 and responded by returning updated DECRPTs. |
Jeff Peterson |
3/16/1993 |
Meeting or Teleconference Held |
Pre-construction conference at Corps of Engineers Fairbanks Resident Engineer Office. |
Bob Couch |
9/10/1993 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). 9/10/93 letter sent responding to 9/1/93 letter that proposed remediation levels. |
Bob Couch |
10/25/1993 |
Update or Other Action |
Scope of work received. |
Bob Couch |
11/19/1993 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). Letter commented on public notice dated October 22, 1993, and stated that ADEC had not agreed on alternate clean-up levels that had been discussed, and that are included in the Corps project documents. |
Bob Couch |
3/1/1994 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Work Plan and Quality Control Plan were submitted 3/1/94, and on 3/7/94 learned that the Corps had returned both plans to the Contractor for revision. |
Bob Couch |
4/1/1994 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Received Contractor's revised Work Plan and Quality Control Plan. |
Bob Couch |
8/16/1994 |
Site Ranked Using the AHRM |
Initial ranking. |
Former Staff |
9/27/1994 |
Update or Other Action |
(Old R:Base Action Code = F - Site Treatment, Soil/H2O). Approval letter for the use of General Permit 9440-DB006 for the treatment and discharge of wastewater at the site. |
Bill Smyth |
3/14/1996 |
Update or Other Action |
(Old R:Base Action Code = RA - Remedial Action). Received "DRAFT Remedial Action Report", Addendum, 1995 Work Season. |
Tamar Stephens |
8/26/1996 |
Update or Other Action |
ADEC staff Stephens and Himmelbauer met with James Baker of COE to scope out closure procedures and risk assessment needs for Nome area FUDS project sites. |
Tamar Stephens |
8/27/1996 |
Update or Other Action |
Supporting Documentation, Prison Site A, Part I, Analytical Data, and Part II, Supplemental Documentation, Nome Area Sites Project, Seward Peninsula, AK, Contract Number DACW41-89-D0133, Delivery Order Number 15, received August 27, 1996. |
Tamar Stephens |
8/27/1996 |
Update or Other Action |
(Old R:Base Action Code = RA - Remedial Action). Remedial Action Report, Prison Site A, Nome Area Sites Project, Seward Peninsula, Alaska, Contract Number DACW41-89-D0133, Delivery Order Number 15, received 8/27/1996. |
Tamar Stephens |
11/19/1999 |
Update or Other Action |
Received draft report on remediation of stockpiled soils. |
Tamar Stephens |
11/22/1999 |
Update or Other Action |
Current status: Have received and commented on draft closeout report. Briefed section manager. Site can be closed as meeting Method 2 cleanup levels. Corp of Engineers needs to finalize Closeout report and hold public review period. ADEC needs to prepare a short fact sheet that shows basis for ADEC decision to close site. Also need to show closure of on-site landfill, and adequate treatment of stockpiled soils. |
Tamar Stephens |
3/6/2001 |
Update or Other Action |
File number updated from 400.38.001 to 400.38.001J. |
Mitzi Read |
12/8/2003 |
GIS Position Updated |
Corrected location from site map. It is likely that actual location is east of current position. |
Torsten Ernst |
11/1/2004 |
Update or Other Action |
DEC received updated Closeout Report |
Tamar Stephens |
3/14/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Tamar Stephens |
1/6/2014 |
Update or Other Action |
Site transferred from Shepard to Savage. |
Rebecca Bryan |
10/1/2015 |
Cleanup Complete Determination Issued |
The selected remedy was to remediate soil contamination to risk-based levels. This work
was completed in 1994, 1995, and 1996. Contaminated soil was treated on-site or
removed and treated at the Tank Site soil remediation facility. Cumulative risk calculations indicate that risk from all remaining contaminants does not exceed 1 x 10-5 for carcinogens and does not exceed a hazard index of 1 for the non-carcinogenic compounds. The Final Prison Site A, FUDS Closeout Report was approved by ADEC on February 6, 2008.
The Alaska Department of Environmental Conservation (ADEC) has evaluated the Prison
Site "A" for closure. ADEC determined that this site meets the requirements for closure
under Method 2 (18 AAC 75.341 Tables Bl and B2, under 40-inch zone), and that no
additional cleanup actions are required at this site under the Site Cleanup Rules in 18
AAC 75.38.325-390. A DECLARATION OF PROJECT CLOSURE DECISION was signed by the Department on 6/06/2008. |