Action Date |
Action |
Description |
DEC Staff |
6/18/1999 |
Update or Other Action |
Picked up long dormant, incomplete project from former ADEC Project Manager. Responded to information request from realtor working with owner to sell property. Sent copies of site information to realtor. |
Donald Seagren |
6/28/1999 |
Update or Other Action |
Follow-up letter to telephone call with land owner concerning status of project and what information is needed for a site closure. |
Donald Seagren |
6/29/1999 |
Update or Other Action |
Provided Jim Frechione with site information to respond to information request from Linda Feiler concerning the project status and site cleanup. |
Donald Seagren |
7/15/1999 |
Update or Other Action |
Telephone conversation with consultant Ron Rozak, concerning information needs for site closure. Ron was working on report for realtor and lending institution. |
Donald Seagren |
11/3/1999 |
Site Ranked Using the AHRM |
Air Exposure Index Value changed from original in ranking model to 0.1. No "on-going" air exposure occurring. |
Donald Seagren |
11/26/1999 |
Site Added to Database |
A 1991 spill of approximately 400 gallons of heating fuel leaked from an AST. Soil and GW impacted with contamination. |
Donald Seagren |
4/4/2000 |
Update or Other Action |
Discussed status of Environmental Site Assessment report with engineer and SBA attorneys. Neither can give out copy of the report. Sent letter to site owner/RP requesting a copy of the report. |
Donald Seagren |
6/28/2000 |
Update or Other Action |
Discussed obtaining a copy of Site Assessment with Joyce Courtney of SBA. She will try to get me a copy since the current landowners are not responding. Loan is going into default and SBA will be becoming RP. |
Donald Seagren |
12/13/2000 |
Update or Other Action |
Received a copy of the Environmental Site Assessment report from SBA. Copies made for potential purchasers of the property. |
Donald Seagren |
12/26/2000 |
Update or Other Action |
Reviewed Rozak report. Sent letter to SBA with recommendations for additional site assessment that would lead to closure. |
Donald Seagren |
6/13/2002 |
Update or Other Action |
Sent letter to new owners, the Sargeants, to verify ownership and to set up a meeting to discuss outstanding contamination issues and develop assessment/remediation plan. |
Donald Seagren |
9/9/2002 |
Cleanup Plan Approved |
Reviewed and approved transport of stockpiled soils to ASR in Anchorage for treatment and disposal. Required sampling in stockpile footprint and documentation that soil was delivered and treated by ASR. |
Donald Seagren |
3/23/2004 |
Update or Other Action |
Reviewed and approved proposal for additional assessment & remediation at site. Requested development of work plan for proposed assessment activities. |
Donald Seagren |
4/12/2004 |
Update or Other Action |
Reviewed and approved Corrective Action Work Plan submitted by Rozak Engineering. |
Donald Seagren |
5/6/2004 |
Update or Other Action |
File number assigned and entered into the Fileroom DB and CS DB. |
Alyce Hughey |
6/23/2004 |
Update or Other Action |
Discussed sampling with Ron Rozak. Based on visual, olfactory and PID field screening readings, analysis of PAH sample was eliminated. |
Donald Seagren |
8/10/2004 |
Site Characterization Report Approved |
Reviewed corrective action report. Requested information on adjacent property GW source/use. A meeting will be held to review GW usage and discuss management options. |
Donald Seagren |
3/4/2005 |
Update or Other Action |
According to Jerry Farmington, EH, the restaurant is closed and the facility up for sale. |
Donald Seagren |
5/19/2005 |
Conditional Closure Approved |
Natural attenuation will address the remaining low levels of DRO contamination in the soil and perched groundwater. The perched GW is not utilized. |
Donald Seagren |
5/19/2005 |
Update or Other Action |
Met with landowners to discuss site. They provided a GW use survey showing that all the surrounding properties are or will be hooking up to the city water system. Groundwater in the are is not used as a drinking water source. |
Donald Seagren |
5/19/2005 |
Institutional Control Record Established |
The Sargeants are required to notify all future purchasers and their real estate about the residual soil and GW contamination remaining on the property. |
Donald Seagren |
5/19/2005 |
Long Term Monitoring Established |
|
Donald Seagren |
5/19/2005 |
GIS Position Updated |
Using the Site and Vicinity maps from an Environmental Site Assessment, from Rozak Engineering, dated August 23, 1999, in conjunction with TopoZone Pro and the KPB Parcel Lookup, entered the coordinates for this site. Metadata includes No Topo Basemap, TopoZone Pro Street Maps, on a Medium Size Map, View Scale 1:10,000, Coordinate Datum NAD83. High degree of confidence in accuracy of location. |
Alyce Hughey |
6/12/2008 |
Update or Other Action |
Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. |
Alyce Hughey |
6/6/2013 |
Long Term Monitoring Complete |
Administrative action added during a quality control check.
|
Kristin Thompson |
11/10/2014 |
Update or Other Action |
Staff changed from Paul Horwath to IC Unit. |
Kristin Thompson |
8/24/2015 |
Institutional Control Compliance Review |
IC compliance review conducted. Scheduled to send an IC reminder letter and to verify who the current property owner is. |
Evonne Reese |
10/13/2015 |
Institutional Control Update |
An IC reminder letter was issued to the two current property owners as listed with the Kenai Peninsula Borough Property Assessment Department. Affiliates information has been updated. |
Kristin Thompson |
6/2/2017 |
Institutional Control Compliance Review |
IC compliance review conducted. Closure/IC Details updated. Reminder system set to follow-up every five years, with the next review scheduled for 2020. |
Kristin Thompson |
8/20/2024 |
Institutional Control Compliance Review |
IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in five years’ time. |
Gaige Robinson |