Action Date |
Action |
Description |
DEC Staff |
8/9/1993 |
Update or Other Action |
(Old R:Base Action Code = TECH - Technical Assistance). Technical assistance was provided to Unocal by ADEC in development of a Phase 2 Site Assessment Plan. |
Former Staff |
8/9/1993 |
Update or Other Action |
(Old R:Base Action Code = SA2 - Phase II Site Assessment (General)). Unocal began implementation of a Phase 2 Groundwater Assessment Plan. |
Former Staff |
8/12/1993 |
Meeting or Teleconference Held |
A meeting was held at KDO at the request of Unocal for purposes of submitting and discussing the proposed Phase 2 Site Assessment Plan. |
Former Staff |
8/20/1993 |
Site Ranked Using the AHRM |
Initial ranking. |
Former Staff |
8/20/1993 |
Site Added to Database |
|
Former Staff |
3/4/1994 |
Update or Other Action |
(Old R:Base Action Code = TECH - Technical Assistance). Treatment alternatives were discussed with representatives of Unocal (at Unocal's request). Treatment alternatives are being considered to assist Unocal in locating a gas compressor building in an area identified as contaminated. |
Former Staff |
7/27/1994 |
Update or Other Action |
(Old R:Base Action Code = TECH - Technical Assistance). TECH was provided to Unocal for the installation of a generator building at the facility. Problems were encountered when Unocal selected a contaminated area to locate the generator building. Unocal decided to relocate the building in an area believed to be free of contamination, rather than excavate contaminated soils (approximately 300 cubic yards). |
Former Staff |
8/31/1994 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). A remedial action plan for contaminated soils to be excavated in the footprint of a generator/switchgear building and the piping runs associated with this building was reviewed and rejected by departmental staff. Comments for non-acceptance were sent to the RP. |
Former Staff |
5/25/2004 |
Update or Other Action |
File number assigned and entered into the Fileroom DB and CS DB. |
Alyce Hughey |
11/1/2005 |
GIS Position Updated |
Using Figure 1 from a Groundwater Results for Monitoring Well MW-2 at the Granite Point Tank Farm, from OilRisk Consultants, dated May 24, 2004, in conjunction with TopoZone Pro and the KPB Parcel Lookup, entered the coordinates for this site. Metadata includes No Topo Basemap, TopoZone Pro Street Maps, Black and White Aerial Photo, on a Medium Size Map, View Scale 1:10,000, Coordinate Datum NAD83. High degree of confidence in accuracy of location. |
Alyce Hughey |
5/29/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Don Fritz |
11/16/2011 |
Update or Other Action |
Site transferred from Don Fritz to Peter Campbell per Paul Horwath. |
Alyce Hughey |
5/23/2013 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 72258 name: AMOCO Heater Treatr Area |
Alyce Hughey |
5/24/2013 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79463 name: Diesel Spill Site (Drum Storage Area) |
Alyce Hughey |
5/24/2013 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79464 name: CIPL Valve Standards |
Alyce Hughey |
5/24/2013 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79465 name: AMOCO Pig Trap |
Alyce Hughey |
5/24/2013 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79466 name: Flow Separator |
Alyce Hughey |
5/28/2013 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79467 name: Unocal Pig Trap |
Alyce Hughey |
5/28/2013 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79468 name: Unocal Heater Treater and Coalescer |
Alyce Hughey |
5/28/2013 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79469 name: Unocal Tank Containment |
Alyce Hughey |
5/28/2013 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79470 name: Old Flare Pit/Impoundment |
Alyce Hughey |
5/28/2013 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79471 name: New Flare Pit |
Alyce Hughey |
7/10/2013 |
Update or Other Action |
Review project file and send a letter to Hilcorp requesting a work plan for surface and ground water monitoring at the site. |
Peter Campbell |
9/5/2013 |
Document, Report, or Work plan Review - other |
Received a 2006 ground water sampling report for the Granite Point Tank Farm from Hilcorp via Chevron.
|
Peter Campbell |
9/5/2013 |
Document, Report, or Work plan Review - other |
Received September 2006 Groundwater Sampling Results, Granite Point Tank Farm, Oil Risk Consultants, prepared for Unocal. |
Peter Campbell |
9/5/2013 |
Document, Report, or Work plan Review - other |
Received a work plan for surface and groundwater monitoring to assess current conditions at the site. |
Peter Campbell |
9/6/2013 |
Update or Other Action |
Work plan approved. |
Peter Campbell |
8/8/2014 |
Document, Report, or Work plan Review - other |
Received Granite Point Tank Farm 2013 Groundwater Monitoring Report.. |
Peter Campbell |
9/16/2015 |
Site Visit |
Site walk with Hilcorp representative and consultant to examine monitoring network and site conditions. Many of the existing wells have been destroyed and or lost. Requested a work plan from Hilcorp designed to fill data gaps on the down gradient side of the facility including surface water sampling. |
Peter Campbell |
8/17/2016 |
Update or Other Action |
Hilcorp reported that sheen is day lighting at the ground surface after rainfall. The location of the seep is near the north central part of the facility between Tank 104 and a fuel storage area. The contaminated sites program has required that a spill assessment work plan be submitted to assess the extent of contamination and determine what remedial actions are necessary. |
Peter Campbell |
5/18/2017 |
Document, Report, or Work plan Review - other |
Work plan approved to assess an area hydrocarbon staining near tank 104. Hand auger boings will be used to determine the extent of surface staining. Up to 20 borings may be used to explore the area. Assessment will include sampling existing groundwater monitoring wells and extending the analytical sampling suite into VOCs and SVOCs. |
Peter Campbell |
12/1/2017 |
Document, Report, or Work plan Review - other |
Reviewed Contaminated Soil and Groundwater Management Plan for Cross Inlet Extension Project. Responded with a letter to Hilcorp correcting some of the proposed approaches to soils management, sample methods and parameters required for impacted soils. |
Peter Campbell |
12/1/2017 |
Document, Report, or Work plan Review - other |
Reviewed the Road Stain and Seep Investigation Report dated October 2017. The report covered sampling of groundwater seeps south of the property, road staining in the northern portion and monitoring well sampling. Soils impacted at the road staining area were heavily contaminated. ADEC will require cleanup of this area. It appears that ground water seeps and surface water are not being impacted based on testing results. |
Peter Campbell |
1/25/2018 |
Document, Report, or Work plan Review - other |
Conditional approval granted for Contaminated Soil Management plan for the Cross Inlet Extension Project. The plans cover the Granite Point Tank Farm, Middle Ground Shoal and East Forelands. |
Peter Campbell |
6/18/2020 |
Spill Transferred from Prevention Preparedness and Response Program |
Spill transferred by PPRP staff Mike Evans. Spill no. 18239907802; spill date = 3/19/2018; substance = crude oil; quantity = unknown; source = crude oil processing equipment; lat/long (WGS 84, CS web map) 61.017062, -151.421151; description: During excavation activities to investigate a gas alarm at the Granite Point Tank Farm Valve Building, petroleum-contaminated soil was encountered. Approximately 55 gallons of contaminated soil were removed. |
Mitzi Read |
10/20/2022 |
Long Term Monitoring Workplan or Report Review |
Review and approve Draft Groundwater Monitoring and Product Recovery Work Plan. |
Peter Campbell |
11/18/2022 |
Update or Other Action |
Approve the disposal of monitoring well purge water into the facility waste stream. |
Peter Campbell |