Site Report: City of Fairbanks 60K Gallon AGSTs
Site Name: | City of Fairbanks 60K Gallon AGSTs |
---|---|
Address: | 1300 1st Avenue, Fairbanks, AK 99701 |
File Number: | 102.38.090 |
Hazard ID: | 1385 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 64.848336 |
Longitude: | -147.733926 |
Horizontal Datum: |
![]() | ![]() |
![]() | ![]() |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
FMUS removed three tanks and associated piping near Chena #6 pump. Two were removed in 1997 and one in 1998. Contamination was mostly removed, but there was residual under the tanks and possibly under some of the fuel lines. These were subsequently removed and confirmation samples submitted in a separate report. The main excavation, down to approx. 15 feet, was clean at the bottom and no groundwater was encountered. There were monitoring wells in the area for other releases. Significant groundwater contamination from these tanks is not suspected. COCs are DRO and BTEX.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
6/24/1997 | Interim Removal Action Approved | Approval to remove contaminated soil from excavations associated with 3, 60,000 gallon tanks. | Laura Noland |
6/18/1998 | Update or Other Action | Report from AGRA on soil screening and sampling. | Renee Evans |
10/23/1998 | Update or Other Action | Certificates of remediation submitted to ADEC from City of Fairbanks for stockpiled soil. | Renee Evans |
10/26/1998 | Update or Other Action | Requested information on soil samples taken after additional soil excavation, depth to GW, and soil conditions between bottom of excavation and GW. | Renee Evans |
12/2/1999 | Site Added to Database | Petroleum contamination. | Renee Evans |
4/20/2000 | Site Ranked Using the AHRM | Initial ranking. | Renee Evans |
8/16/2000 | Update or Other Action | Phone call to Pat Smith, City of Fairbanks, regarding status of 10/98 information request, he will check on status and call back. | Renee Evans |
7/10/2002 | GIS Position Updated | Changed the Latitude, Longitude, Method Accuracy, Accuracy and Unit fields. | Heather Goldman |
6/2/2008 | Update or Other Action | Staff changed to Farris | Ann Farris |
6/22/2009 | Cleanup Complete Determination Issued | The City of Fairbanks found the final report with confirmation sample results. The subsurface contamination was completely removed from this area, including beneath the fuel lines (see the August 1991 Report). Based on this information, DEC determines the site meets applicable cleanup levels and no longer poses a risk. The Cleanup complete with no institutional controls letter was sent today. | Ann Farris |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
DRO | < Method 2 Most Stringent | Soil | the soil was excavated to the Method 2 migration to groundwater level for DRO and BTEX. Removed soil was thermally treated off-site. |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. |
No associated sites were found.