Action Date |
Action |
Description |
DEC Staff |
7/23/1991 |
Interim Removal Action Approved |
(Old R:Base Action Code = REM - Removal / Excavation). Two heating oil tanks were removed by Locher Interests Limited: One 500 gallon tank and one 4,000 gallon tank. Sampling determined that contamination by diesel range hydrocarbons ranging from 160 ppm to 7920 ppm remains near the building. |
Former Staff |
9/30/1991 |
Site Added to Database |
Heating oil contamination. |
Former Staff |
2/19/1992 |
Site Ranked Using the AHRM |
Initial ranking. |
Former Staff |
2/14/1994 |
Update or Other Action |
(Old R:Base Action Code = RPL2 - Site Information Request Letter). Sent PRP-CS Database Notification Letter to RP requesting update and more environmental information concerning contaminated site. RP responded with completed information form. |
Jeff Peterson |
5/31/1994 |
Site Ranked Using the AHRM |
Reranked. |
Former Staff |
9/8/1994 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Reviewed file and noted ground water contamination, all records in file cease after 9/91 Locker Interests Ltd. site assessment. Made request to RP for follow-up. RP states quarterly ground water sampling and testing in progress on one monitor well installed. Will send copies. |
Eleanor Hung |
9/14/1994 |
Update or Other Action |
(Old R:Base Action Code = RARR - Remedial Action Report Review (CS)). Received all back reports from RP 9/12/94 dated 7/28/92, 12/10/92, 6/8/93, 10/29/93, 4/21/94 and 7/20/94. Review indicates Benzene levels still exceed 5 ppb using EPA 602 method for ground water samples for Monitor well 3. Benzene 1/94= 35 ppb, 4/94=38 ppb and 7/94 = 8 ppb. |
Eleanor Hung |
5/3/2001 |
Update or Other Action |
New address listed. Address formerly listed as 526 Gaffney Road is in error according to FNSB Assessor's Office. |
Former Staff |
7/10/2002 |
GIS Position Updated |
Plotted latitude and longitude coordinates and found them to be acceptable for associated property or address. |
Heather Goldman |
3/3/2006 |
Meeting or Teleconference Held |
Met with David Pruse, local realtor, representing Access Alaska which may use the building. Questions concerning the impact of the west Gaffney Road PCE/TCE ground water plumes to the western annex of the store were discussed. It appears that vapor intrusion is a possibility - only testing will either prove or disprove the possibility. |
Douglas Bauer |
3/29/2007 |
Update or Other Action |
Telephone call with Chris Bellavory with EPA Region 10 UIC program concerning operation of cooling wells at the site. Agreed on a ground water testing program proposed by Summit Consulting after consultation with ADEC to determine if the installed wells will be impacted by the eastern TCE ground water plume originating in the Gaffney Road area. |
Douglas Bauer |
1/2/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Tamara Cardona-Marek |
1/4/2008 |
Update or Other Action |
Summit Consulting has not received directions from owner on whether to proceed with groundwater testing program proposed in 2007. |
Tamara Cardona-Marek |
1/8/2008 |
Update or Other Action |
Letter sent to Bachner Company (current property owner) requesting further sampling on the property. |
Tamara Cardona-Marek |
3/6/2008 |
Update or Other Action |
An e-mail was received from current owner (Bachner Company) in response to our letter stating their intentions to cooperate and characterize the site. They also requested information on the former location of the tanks. The e-mail was replied to. |
Tamara Cardona-Marek |
7/8/2008 |
Update or Other Action |
Sent letter to Bachner Co. requesting status and intentions on sampling groundwater well on site (if still there). Also sent location of the MW-3 well. |
Tamara Cardona-Marek |
7/31/2008 |
Update or Other Action |
Bachner Company has hired Hoefler consulting to do the requested site assessment/ status of site. |
Tamara Cardona-Marek |
7/17/2009 |
Document, Report, or Work plan Review - other |
Hoefler submitted work plan for the installation of two monitoring wells at the site. DEC commented on work plan and is waiting for requested revisions. |
Tamara Cardona-Marek |
8/26/2009 |
Document, Report, or Work plan Review - other |
Work plan submitted by Hoefler for groundwater sampling has been approved after revisions, clarifications, and addendums from July 22, July 24, and August 25. Two temporary monitoring wells will be installed (one at source area and one downgradient) to determine if there is still contamination in the groundwater resulting from the former bakery tank. RP has agreed to also collect sample for chlorinated solvents to evaluate the status of this existing plume (from another source) in the area. |
Tamara Cardona-Marek |
9/3/2009 |
Update or Other Action |
Consultant contacted DEC to inform that well MW-3 has been located and it's functional. They will sample MW-3 to investigate the current status of the source area. Based on these results a decision will be made regarding the need of a downgradient well. |
Tamara Cardona-Marek |
3/16/2012 |
Document, Report, or Work plan Review - other |
DEC received from SLR results from the sampling of the groundwater from a downgradient test boring installed during the Gaffney East investigation. DRO results were below the cleanup levels. DEC is requesting that source area well MW-3 is sampled annually for DRO and VOC's (in 2012). |
Tamara Cardona-Marek |
3/16/2012 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 72375 heating oil tank (removed). |
Tamara Cardona-Marek |
8/14/2013 |
Document, Report, or Work plan Review - other |
Reviewed and approved a work plan from SLR to do the annual sampling of MW-3 along with the decommissioning of two damaged monitoring wells at the site. |
Willett Boger |
1/8/2014 |
Update or Other Action |
Site symbol visually adjusted using ArcGIS and documents from file. 1/8/14; MLB. 64.837668, -147.716073. |
Michelle Barnes |
8/23/2017 |
Update or Other Action |
Emailed consultant requesting current status of site. |
Michael Hooper |
8/24/2017 |
Update or Other Action |
Sent letter to landowner requesting Groundwater Monitoring workplan by October 15, 2017. |
Michael Hooper |
3/21/2018 |
Update or Other Action |
Letter sent to RP requesting groundwater monitoring workplan by April 30, 2018. A workplan was never received after previous letters and discussion with the RP. |
Michael Hooper |
8/10/2018 |
Site Characterization Workplan Approved |
Approved a workplan for groundwater monitoring at the source area and down-gradient. |
Michael Hooper |
10/23/2023 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 72375 heating oil tank (removed). |
Kelly Ireland |