Action Date |
Action |
Description |
DEC Staff |
7/30/2004 |
Site Added to Database |
Petroleum contamination. |
Deborah Williams |
7/30/2004 |
Update or Other Action |
DOD ranking of High. |
Deborah Williams |
8/30/2004 |
Meeting or Teleconference Held |
11th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/21/2004 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/5/2004 |
Meeting or Teleconference Held |
12th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/19/2004 |
Meeting or Teleconference Held |
Attended a week long meeting in San Antonio, Texas to participate in the formulation of an outline for the Galena Airport and Campion Air Station Remedial Investigation/Feasibility Study (RI/FS). |
Colin Craven |
1/12/2005 |
Update or Other Action |
Submitted comments to the Air Force to finalize the 2004 Site Recommendations for the upcoming Remedial Investigation report. The 2004 Site Recommendations were produced during the November 2004 meetings in San Antonio, Texas. |
Colin Craven |
1/28/2005 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
1/28/2005 |
Meeting or Teleconference Held |
13th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
3/18/2005 |
Update or Other Action |
Comment resolution between DEC and the Air Force has been achieved on the draft Human Health Risk Assessment Work Plan for the Galena Airport and Campion Air Station. The Air Force contractors are currently finalizing the work plan. |
Colin Craven |
4/19/2005 |
Meeting or Teleconference Held |
14th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
4/26/2005 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
5/13/2005 |
Meeting or Teleconference Held |
15th Galena Technical Project Team meeting in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
6/9/2005 |
Meeting or Teleconference Held |
16th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
7/20/2005 |
GIS Position Updated |
Updated site location by interpolation from USGS quadrangle map. |
Colin Craven |
8/30/2005 |
Meeting or Teleconference Held |
17th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
9/15/2005 |
Update or Other Action |
DEC approved a plan to transport 230 cubic yards of petroleum-contaminated soil for storage at an old contaminated soil biopile at the Campion Air Station. The contaminated soil was generated during work on Valve Pit #10, located within the JP-4 Fillstands site. The Campion biopiles contain an unknown volume of petroleum-contaminated soils stockpiled in the middle 1990s that underwent incomplete treatment. The Air Force has proposed to treat all of the contaminated soil starting in 2006 via landfarming. |
Colin Craven |
10/12/2005 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/20/2005 |
Meeting or Teleconference Held |
18th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
1/3/2006 |
Update or Other Action |
DEC received the draft Remedial Investigation and Feasibility Study. The Air Force is proposing air injection bioventing to remediate petroleum contaminated soils, and additional installation of monitoring wells to better delineate the resultant groundwater plume. Long term monitoring and land use controls would be an integral part of the remedy. DEC comments will be submitted in February. |
Colin Craven |
1/26/2006 |
Meeting or Teleconference Held |
19th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
3/7/2006 |
Update or Other Action |
The draft risk assessment found unacceptable risk at this site due to benzene, toluene, ethylbenzene, and xylenes in soil. The Air Force proposed air-injection bioventing to remediate the petroleum contaminated soil, long term groundwater monitoring (LTM), and land use controls as the remedy. DEC concurred with this remedy, but requested better monitoring well coverage for LTM, and proper design of the bioventing system to help mitigate the potential for vapor intrusion into nearby buildings. |
Colin Craven |
3/14/2006 |
Meeting or Teleconference Held |
20th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
6/1/2006 |
Site Characterization Workplan Approved |
The Air Force and DEC came to agreement on a work plan for monitoring well installation and sampling that will serve to fill data gaps identified during the recent remedial investigation. One nested well cluster in the “mid-plume” and one monitoring well near the source area will be installed to better establish a sufficient well network for long-term monitoring. The new monitoring wells will also serve to clarify the contribution of source areas that have caused co-mingled plumes of petroleum contamination. |
Colin Craven |
6/20/2006 |
Meeting or Teleconference Held |
21st Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/6/2006 |
Meeting or Teleconference Held |
22nd Galena Technical Project Team meeting in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/17/2006 |
Meeting or Teleconference Held |
23rd Galena Technical Project Team meeting in Fairbanks. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/17/2006 |
Update or Other Action |
Monitoring wells were installed in summer of 2006 along the presumed center axis of the dissolved phase hydrocarbon plume emanating from the Vehicle Maintenance Facility area. A nested well was installed at the location of a decommissioned well (southeast corner of the Combat Alert Cell), and another well was installed between the CAC and the presumed source area. Consistent with other deep monitoring wells at the base, the deeper interval well at the CAC cluster contained higher benzene concentrations than the shallower interval. The new monitoring wells seem to support the presumed trajectory of the plume, however, the downgradient edge of the plume remains undifferentiated from the Million Gallon Hill and Missile Storage Area plumes. |
Colin Craven |
1/18/2007 |
Meeting or Teleconference Held |
24th Galena Technical Project Team meeting in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
4/1/2010 |
Document, Report, or Work plan Review - other |
SC work plan reviewed as part of larger QAPP document |
Fred Vreeman |
4/12/2010 |
Meeting or Teleconference Held |
TPT meeting, site discussion. |
Fred Vreeman |
6/28/2010 |
Meeting or Teleconference Held |
TPT meeting, site discussion. |
Fred Vreeman |
8/1/2010 |
Conceptual Site Model Submitted |
Site specific CSM submitted as part of SC work plan |
Fred Vreeman |
8/1/2010 |
Site Characterization Workplan Approved |
SC Workplan approved as part of larger QAPP document. |
Fred Vreeman |
8/4/2010 |
Meeting or Teleconference Held |
TRIAD meeting, 2010 sample data discussed |
Fred Vreeman |
9/1/2010 |
Site Visit |
Site visit field work audit |
Amanda Loomis |
9/8/2010 |
Meeting or Teleconference Held |
TRIAD meeting, 2010 sample data discussed |
Fred Vreeman |
12/7/2010 |
Meeting or Teleconference Held |
TPT meeting, site discussion. |
Fred Vreeman |
2/15/2011 |
Meeting or Teleconference Held |
TPT meeting held, site discussion. |
Fred Vreeman |
6/9/2011 |
Site Visit |
Site visit, field work audit. |
Fred Vreeman |
7/5/2011 |
Meeting or Teleconference Held |
TRIAD meeting, 2011 sample data discussed |
Fred Vreeman |
7/12/2011 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 72393 name: auto-generated pm edit Galena AFS - JP4 Fillstands |
Amanda Loomis |
7/15/2011 |
Document, Report, or Work plan Review - other |
Draft Final Vapor Intrusion Work Plan received from USAF |
Fred Vreeman |
7/19/2011 |
Site Characterization Workplan Approved |
USAF is using its CERCLA authority.
Vapor Intrusion Work Plan approved. |
Fred Vreeman |
8/11/2011 |
Update or Other Action |
Final Vapor Intrusion Work Plan received from USAF |
Fred Vreeman |
5/3/2012 |
Document, Report, or Work plan Review - other |
DEC received a Draft Site Characterization results report for Site. |
Dennis Shepard |
9/28/2012 |
Document, Report, or Work plan Review - other |
DEC provided review comments for the Site Characterization results report for the Site. |
Dennis Shepard |
5/29/2013 |
Document, Report, or Work plan Review - other |
DEC received a response to comments and a Draft Final Site Characterization results report for Site |
Dennis Shepard |
6/14/2013 |
Document, Report, or Work plan Review - other |
DEC provided comments for the Draft Final Site Characterization results report for Site. |
Dennis Shepard |
6/26/2013 |
Meeting or Teleconference Held |
A teleconference was held to resolve the remaining issues for the Site Characterization results report. All remaining issues were resolved. |
Dennis Shepard |
7/16/2013 |
Document, Report, or Work plan Review - other |
DEC received the Final version of the Site Characterization results report for Site ST009. |
Dennis Shepard |
10/8/2013 |
Site Characterization Report Approved |
The Final Site Characterization results report for Site ST009 is approved. |
Dennis Shepard |
9/18/2014 |
Site Characterization Report Approved |
DEC approved the Supplemental Site Characterization report for Site ST009. |
Dennis Shepard |
3/5/2015 |
Document, Report, or Work plan Review - other |
Site Characterization (SC) Report Addendum, JP-4 Fill-stands, 1572 Liquid Fuel Pump Station, 3,000-gallon UST (Former UST 1572), and 2,000 gallon UST (Former UST 1572-2) (Site ST009), Former Galena Forward Operating Location (FOL), Alaska. |
Dennis Shepard |
7/22/2016 |
Cleanup Plan Approved |
DEC approved the Cleanup Plan for Site ST009, West Unit JP-4 Fuel Spill, Former Galena. The plan includes: Hot spot excavation of polycyclic aromatic hydrocarbons (PAH) contaminants in near surface soils, Soil Vapor Extraction (SVE), later converted to bioventing, for contaminants in unsaturated soil, including the vadose zone and in the variably saturated zone, and Sulfate-Enhanced Bioremediation for contaminants in saturated soil and in groundwater. |
Dennis Shepard |
10/26/2016 |
Meeting or Teleconference Held |
A restoration Advisory board meeting was held in Galena Alaska to discuss the general and specific status of site investigations and cleanup at Galena. |
Dennis Shepard |
3/28/2018 |
Document, Report, or Work plan Review - other |
REPORT RECEIVED: Draft Addendum to the Supplemental Site Characterization Report, West Unit JP4 Fuel Stands (Site ST009). Prepared by Parsons.
|
Jamie McKellar |
4/20/2018 |
Document, Report, or Work plan Review - other |
TECHNICAL MEMO/WORK PLAN received and Approved: Draft Technical Memorandum, Expansion of Sites ST009 and ST010 Remediation Systems. Prepared by Parsons. Dated April 20, 2018. The tech memo provides a summary of additional activities proposed to be completed during the 2018 and 2019 field seasons at Sites ST009 and ST010. |
Jamie McKellar |
8/8/2018 |
Site Visit |
DEC conducted a site visit at the Former Forward Operating Location in Galena, AK on August 8-9, 2018. A photo log is available in DEC's electronic file. |
Jamie McKellar |
10/5/2018 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: Final Addendum to the Supplemental Site Characterization Report for West Unit JP-4 Fuel Stands (Site ST009). Prepared by Parsons. Dated September 2018. |
Jamie McKellar |
10/29/2018 |
Site Visit |
On October 23, 2018, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit with inspections of each site was conducted the following day (10/24/2018) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
1/2/2019 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: 2017 Performance Monitoring Report for Sites CPL006, CSS002, OW024, SS014/SS017, SS016, SS022, SS025, ST009, and ST010. Parsons, December 2018. The report presents and evaluates performance monitoring data for sites managed by Parsons with an approved Cleanup Plan or Record of Decision (ROD), and an active remedy installed and operating for fiscal year 2017. |
Jamie McKellar |
4/5/2019 |
Site Visit |
On April 2, 2019, DEC staff participated in a Technical Project Team meeting with representatives from USAF, Parsons, CH2M, and ADOT. The TPT meeting was held at the Fairbanks DEC office. On April 3-4, 2019, DEC staff traveled to Galena to participate in meetings with the City Mayor & RAB chair to discuss community concerns about site cleanup; a Proposed Plan meeting for Site DP023, and a community regional advisory board (RAB) meeting to discuss fieldwork completed during the 2018 field season and upcoming 2019 fieldwork. Site visits were also conducted. |
Jamie McKellar |
10/23/2019 |
Meeting or Teleconference Held |
On October 22, 2019, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit was conducted the following day (10/23/2019) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
10/30/2019 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: Final 2018 Performance Monitoring Report for Sites CPL006, CSS002, OW024, SS006/SS019, SS014/SS017, SS015, SS016, SS018, SS022, SS025, ST009, ST010, and FT001, Former Galena Forward Operating Location, Alaska (Parsons, October 2019) |
Jamie McKellar |
8/23/2023 |
Document, Report, or Work plan Review - other |
REPORT APPROVED: Final Remedial Process Optimization Evaluation Report, Former Galena Forward Operating Location, Alaska (Parsons, June 2023) |
Jamie McKellar |
11/15/2023 |
Site Visit |
DEC, DOT, USAF, and contractors met at the Fairbanks DEC office on May 2, 2023 for a Technical Project Team meeting. The following day a site visit and Regional Advisory Board (RAB) meeting were held in Galena. Meeting minutes for the TPT and RAB meetings were approved on November 15, 2023. |
Jamie McKellar |
4/23/2024 |
Meeting or Teleconference Held |
CS staff participated in the biannual Technical Project Team (TPT) meeting with representatives from USAF BRAC, Parsons, Jacobs/CH2M Hill, and EA Engineering. The meeting was held at the EA Engineering office in Anchorage, AK. |
Jamie McKellar |
7/16/2024 |
Document, Report, or Work plan Review - other |
DEC approved the Final 2023 Soil Vapor Extraction (SVE) Remediation System Annual Report. The document describes the results of the operations, monitoring, and maintenance (OM&M) activities from October 2022 through September 2023 for five SVE systems at the Former Galena Forward Operating Location. |
Tim Sharp |
12/10/2024 |
Document, Report, or Work plan Review - other |
DEC provided comments for the Draft 2023 Performance Monitoring Report (PMR) for Sites CPL006, CSS002, SS006/SS019, SS017, SS015, SS016, SS018, SS022, ST009, ST010, and FT001, Former Galena Forward Operating Location (FOL). The PMR details 2023 data for the listed sites at the Galena FOL and provides an evaluation of how selected remedies are progressing. The report also proposes recommendations for further monitoring, maintenance, and treatment options. |
Tim Sharp |