Site Report: Green's Construction Drum Site
| Site Name: | Green's Construction Drum Site |
|---|---|
| Address: | 11465-11495 Mendenhall Loop Road, Juneau, AK 99801 |
| File Number: | 1513.38.026 |
| Hazard ID: | 1449 |
| Status: | Active |
| Staff: | Sarah Durand, 9072628223 sarah.durand@alaska.gov |
| Latitude: | 58.393762 |
| Longitude: | -134.623378 |
| Horizontal Datum: | WGS84 |
| ![]() |
![]() | ![]() |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Approximately 400 drums of aged asphalt. Drums are in disrepair, partially buried. 1996: Site visit determined these drums were located on property near Goat Hill, Back Loop Road in Juneau, Alaska. Drums are stacked three high in rows, and also stored in conex and trailers. No drums were buried, many were leaking and pools of asphalt evident in the area. Potential hazard to area wildlife. Facility name changed from "Montana Creek Road Drum Site" in 1996. No evidence that drums are stored at a site on Montana Creek Road. It is possible these drums were moved to their current location. Leaking drums and pooled of emulsified asphalt; probably CRS-1 typically used in paving projects.
Action Information
| Action Date | Action | Description | DEC Staff |
|---|---|---|---|
| 8/26/1993 | Site Added to Database | Drums of aged asphalt. | Former Staff |
| 6/19/1996 | Update or Other Action | Staff conducted site visit of property and determined drums existed and were leaking. Trip report written and site referred to PERP staff for immediate action. | Sally Schlichting |
| 7/30/1996 | Update or Other Action | Trip report memorandum sent to PERP referring this site for PERP action. Project Manager assigned was Roy Warren. | Sally Schlichting |
| 10/9/1996 | Site Ranked Using the AHRM | This site is currently in PERP (10/96). | Roy Warren |
| 10/10/1996 | Update or Other Action | Update on PERP action. Warren reported that the property has been cleaned up somewhat, the drums are being prepared for winter storage. In the spring, Hanna will drain the material out. | Roy Warren |
| 2/20/2002 | Update or Other Action | Reply from Scott Tiernen. There is a letter from Mr. Hanna to Roy Warren outlining what was to be done and giving a short history of the site and its problems. However there is no follow up information on file. | Bill Janes |
| 11/28/2006 | Spill Transferred from Prevention Preparedness and Response Program | Project manager changed to Wanstall and status changed to Active. Inquire to PERP about contacts or location data. Message left with Mr. Hanna to contact DEC about site status. | Bruce Wanstall |
| 11/28/2006 | GIS Position Updated | GIS data calculated using ArcMap and personal knowledge of the site; GIS data updated. | Bruce Wanstall |
| 7/24/2013 | Potentially Responsible Party/State Interest Letter | Recalled phone conversation and advised Mr. Hanna State Interest in site cleanup. The department was informed that cleanup activities were to begin August 2013. | Denise Elston |
| 3/19/2014 | Update or Other Action | Spoke to RP and discussed plans for moving the asphalt in May. Rec'd letter detailing these plans: they will have CDI do an assessment of the site during and after the drum handling to ensure we have no remaining asphalt contamination on the property. | Danielle Duncan |
| 4/23/2014 | Update or Other Action | Sent letter documenting prior phone and written communications and requested work plan be submitted. | Danielle Duncan |
| 5/16/2014 | Site Visit | Site visit with CDI and RP to discuss workplan. | Danielle Duncan |
| 11/18/2014 | Update or Other Action | Spoke to RP and he is actively working on removing debris from the property prior to moving the asphalt drums off site to his Lemon Creek property. He will contact me when the drums are ready to be moved. No word yet from CDI on a work plan, but need the area clear of debris first anyways. | Danielle Duncan |
| 3/13/2015 | Update or Other Action | Spoke with RP- planning on moving the drums to his industrial site (Concrete Way) beginning in April; will let me know when. The drums will be placed on top of concrete pads to eliminate any possible leaks to the ground. The house is connected to city water. | Danielle Duncan |
| 6/4/2015 | Update or Other Action | Have an arrangement to lease property for asphalt plant and should get things rolling soon. | Danielle Duncan |
| 3/17/2016 | Update or Other Action | The RP is preparing the site - should receive a work plan from CDI soon. | Danielle Duncan |
| 7/15/2016 | Update or Other Action | Rec'd an update: the RP is moving old equipment and materials out of the way at the drum site and hauled in some clean pit run and stockpiled it off to one side. They are pretty close to being ready to move drums and are making preparations to haul it to an industrial property at Lemon Creek. I should see a work plan soon once the consultant is back in town. | Danielle Duncan |
| 10/7/2016 | Update or Other Action | Requested a work plan this date. Certified: 7014 2120 0001 4210 0964 | Danielle Duncan |
| 10/14/2016 | Update or Other Action | Update: Should have a work plan soon - plans are in the works to move the asphalt drums. | Danielle Duncan |
| 11/8/2016 | Cleanup Plan Approved | Approved Cleanup Plan Green Construction Drum Site completed by Dahlberg Design. The work plan outlines activities to relocate approximately 1,100 55-gallon drums of asphalt and cleanup any soil contamination resulting from their storage. | Danielle Duncan |
| 4/17/2019 | Workplan Requested | Sent Certified # 7017 1450 0002 0295 6034 | Danielle Duncan |
| 8/1/2019 | Update or Other Action | Although the drums have not been moved yet, the responsible party is in the process of preparing the new site for the drums. | Danielle Duncan |
Contaminant Information
| Name | Level Description | Media | Comments |
|---|
Control Type
| Type | Details |
|---|
Requirements
| Description | Details |
|---|
There are no documents for this site report.
No associated sites were found.