Action Date |
Action |
Description |
DEC Staff |
1/7/1992 |
Preliminary Assessment Approved |
Preliminary Assessment Approved this date. |
Dick Farnell |
1/7/1992 |
Site Characterization Report Approved |
(Old R:Base Action Code = SI - Site Investigation). This report was combined with the PA by the contractor E&E. |
Dick Farnell |
2/1/1992 |
Update or Other Action |
Date of Draft Environmental Compliance Investigation Report (PA). |
Dick Farnell |
3/25/1994 |
Site Added to Database |
This site is being investigated under CERCLA and is separate from the buried drum site being cleaned up by the ACOE, and separate from the ADOT/PF Airport lease lot. |
Dick Farnell |
3/29/1994 |
Site Ranked Using the AHRM |
More than one possible contaminant at the site. Quantities and extent of contamination unknown. Endangerment of nearby shallow groundwater (used for drinking) is inconclusive. |
Dick Farnell |
12/22/1994 |
Update or Other Action |
EPA NFRAP under CERCLA; FAA plans additional cleanup pursuant to state direction. |
Dick Farnell |
7/17/1996 |
Update or Other Action |
Diesel release of an unknown amount was reported. The release was discovered during tank excavation on 7/16/96 from pipe fittings on tank 49-A-001 near RCAG Emergency Generator Building 606. FAA removed approximately 1 cubic yard from the excavation. |
Dick Farnell |
11/15/1996 |
Update or Other Action |
Received the Tank Decommissioning Assessment for UST 49-A-1. |
Dick Farnell |
5/1/1997 |
Update or Other Action |
No Further Action granted for Tank 49-A-1, 1,000gallon UST, located at the RCAG Facility, based on the sample results in the Decommissioning Assessment which were below the cleanup level for this site. UST Facility # 2562 and LUST Event ID# 2005. |
Dick Farnell |
6/11/1997 |
Update or Other Action |
Received the Final Release Investigation Plan. Well logs from the Final Release Investigation Report dated 1/16/98 show site characterization work outlined in the plan had already begun by 6/9/97 without ADEC approval. |
Eileen Olson |
1/27/1998 |
Update or Other Action |
Received Final Release Investigation Report documenting site characterization and cleanup activities at the RCAG. |
Dick Farnell |
11/9/1998 |
Update or Other Action |
Project management transferred from Dick Farnell to Eileen Olson. |
Eileen Olson |
5/12/2000 |
Update or Other Action |
FAA requested approval to transport an estimated 100 cubic yards of contaminated soil to USR in Juneau during the week of May 15, 2000. Transport approved on the condition that the soil be received by the facility by 5/31/00. |
Tim Stevens |
5/12/2000 |
Interim Removal Action Approved |
Conditional approval based on FAA fulfilling conditions relating to the stockpiling of soils, excavation below the water table, field screening and confirmation sample requirements, and monitoring well installation requirements. Additional work required was outlined and included sampling along the ditch, sampling below the groundwater table, and characterizing the extent of the smear zone, groundwater levels, contamination and flow direction. |
Tim Stevens |
1/14/2002 |
Update or Other Action |
Corrected database status from inactive to active. |
Elizabeth Stergiou |
1/29/2002 |
Meeting or Teleconference Held |
Elizabeth Stergiou and Eileen Olson met with David Jadhon of FAA regarding possible work in Gustavus in March while some building demolition work is conducted. Eileen requested the demolition workplan to be submitted also. David submitted the1992 Environmental Compliance Investigation Report which includes the 1990 Reconnaissance report. I will review the file and have an email or letter of the site issues to FAA by the end of this week or early next week. |
Elizabeth Stergiou |
1/30/2002 |
Update or Other Action |
Re-ranked site based on the 1992 Environmental Compliance Investigation Report. Changed Air Exposure Index from 0.1 to 0.2 based on the presence of stained soil at the location of an AST. |
Elizabeth Stergiou |
1/30/2002 |
Update or Other Action |
Two entries in this database are not in the file. Preliminary Assessment Approved action of 1/07/92 and Site Characterization Report Approved action of 1/07/92 are prior to the Draft Environmental Compliance Investigation Report which is the Preliminary Assessment. |
Elizabeth Stergiou |
2/5/2002 |
Update or Other Action |
Received sampling event report for the area of the new 500 gallon AST near Building 606, dated 10/25/96. During July 1996 samples were collected from 6 borings. Results showed DRO contamination of 5900 mg/kg in an area approximately 10 feet south of Building 606. |
Elizabeth Stergiou |
2/7/2002 |
Meeting or Teleconference Held |
Meeting with David Jadhon of FAA regarding site characterization and sampling at the Building 600 site and questions at the other sites at the station. |
Elizabeth Stergiou |
2/12/2002 |
Update or Other Action |
Project management transferred from Eileen Olson to Elizabeth Stergiou. |
Elizabeth Stergiou |
2/13/2002 |
Update or Other Action |
FAA Gustavus review and meeting summary letter sent. Letter addressed remaining work required at Building 606 which include installation of monitoring wells that were to be installed during the 2000 field season, requirements for sampling the floor of the previous excavation, measuring the groundwater flow direction, characterizing the extent of groundwater contamination and characterizing the vertical extent of soil contamination by sampling below the groundwater table. The letter also requested information on issues at Building 400, the Post Office Drum Disposal Area, the Dock Area Tank Farm, The Disposal Area at NW end of Airstrip and the Disposal Area at SE end of Airstrip. |
Elizabeth Stergiou |
9/19/2002 |
Update or Other Action |
Sent general letter requesting the following documents be submitted by 10/1/02: information requested in the Department's February 12, 2002 letter. |
Elizabeth Stergiou |
1/10/2005 |
Update or Other Action |
File transferred to the Fairbanks office from the Juneau office for project manager assignment. |
Bruce Wanstall |
4/13/2007 |
Exposure Tracking Model Ranking |
ETM ranking |
Anne Marie Palmieri |
4/25/2007 |
Cleanup Complete Determination Issued |
|
Erin Gleason |
4/25/2007 |
Update or Other Action |
Former AST at the RCAG was closed this date. Soil removal was conducted in 2000 with 134 tons of soil removed. All confirmation samples were below method 2 cleanup levels. Groundwater sample collected before removal was non-detect for all constituents. |
Anne Marie Palmieri |
9/8/2015 |
Update or Other Action |
Requested site update from FAA |
Melody Debenham |
2/8/2017 |
Update or Other Action |
Project management change back to the Juneau office. Examine the 1998 and 2000 remedial action reports to determine which areas of concern may have been resolved by the project manager. |
Bruce Wanstall |
4/4/2018 |
Institutional Control Record Removed |
Institutional Controls have been removed. |
Erin Gleason |