| Action Date |
Action |
Description |
DEC Staff |
| 8/22/1992 |
Update or Other Action |
(Old R:Base Action Code = RAU - Remedial Actions Underway (General)). |
Former Staff |
| 12/10/1992 |
Site Characterization Report Approved |
UST Removal Site Assessment Repoort by Gilfillian Engineering, Inc. received. The USTs were removed between 23 - 28 October 92. A 2,000 gallon Diesel and a 2,000 gallon gasoline USTs were removed. These tanks were listed as Tanks # 16 & 17 for the Palmer Correction Center. The dispensers were located directly over the USTs. A small amount of diesel contamination was present, but the most obvious contamination was noted to be gasoline. 170 yds3 excavated and placed in short term storage. The excavation was stopped due to exceeding the depth accessible by the backhoe. No GW encountered. DRO and BTEX contamiantion remained, suspeted to mainly gasoline. A CAP was to be prepared. |
Mike Krieber |
| 1/13/1993 |
Update or Other Action |
(Old R:Base Action Code = NOR - Notice of Release Letter (LUST)). The letter confirmed notification of a release from an UST discovered during UST removal assessment on 25 October 92. |
Former Staff |
| 1/13/1993 |
Update or Other Action |
(Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). UST assessment report review comments. Significant comtaminant levels remain at the site. Provided guidance and specific items to be included in the corrective action plan being developed. |
Former Staff |
| 1/27/1993 |
Update or Other Action |
Received a letter from ADOT&PF clarifying that DOC is owner of all but one of the tanks at the Palmer Correctional Facility, not ADOT&PF. ADOT&PF was acting as contracting procurement agent for DOC |
Mike Krieber |
| 4/21/1993 |
Site Added to Database |
DRO soil contamination. |
Former Staff |
| 11/11/1993 |
Risk Assessment Report Approved |
Release Investigation Report, dated 11 November 93, by Gilfillian Engineering, Inc. received 9/24/93. A CAP was using passive ventilation was proposed for the contaminated soil stockpile. The plan was verbally approved on 10/26/93 and the cell constructed. In September & October 93 soil borings were advanced through the former UST location and in the area around it. The borings were advanced to about 41.5 feet bgs, No GW was encountered. Only Benzene and Toluene exceeded current cleanup levles in a single boring (TH4) at a depth of 19 - 20.5 feet bgs. All other contaminants analyzed were below cleanup levels. |
Mike Krieber |
| 1/18/1994 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Levels of contamination above cleanup action levels remain at the site. |
Former Staff |
| 1/18/1994 |
Update or Other Action |
(Old R:Base Action Code = SA2R - Phase II SA Review (CS)). Release investigation report review comments letter sent. It recommended further excavation to remove remaining contamiantion. Approved treatment of soil by passive ventilation in a treatment cell that has already been constructed. |
Former Staff |
| 2/15/1995 |
Update or Other Action |
(Old R:Base Action Code = RARR - Remedial Action Report Review (CS)). |
Former Staff |
| 2/15/1995 |
Site Ranked Using the AHRM |
Site ranked earlier by staff but no related action added to the database. |
Mike Krieber |
| 2/15/1995 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). |
Former Staff |
| 2/15/1995 |
Site Characterization Report Approved |
(Old R:Base Action Code = SA2R - Phase II SA Review (CS)). |
Former Staff |
| 8/15/1996 |
Update or Other Action |
Received 15 day prior notification for closure of UST #2 at the Shop Facility, Palmer Correctional Facility. Tank #2 is a 500 gallon UST that was used as a back up standby generator for the shop. |
Mike Krieber |
| 12/31/1997 |
Conditional Closure Approved |
No further action is required provided monitoring reflects stable or decreasing trends in contamination. |
Jim Frechione |
| 12/31/1997 |
Long Term Monitoring Established |
Biannual sampling required as condition of site closure. |
Jim Frechione |
| 12/31/1997 |
Cleanup Level(s) Approved |
Petroleum contamination currently to 100' in coarse sand and gravels. Water table at over 300'. |
Jim Frechione |
| 12/31/1997 |
Institutional Control Record Established |
Administrative update (10/24/07) |
Evonne Reese |
| 5/19/1998 |
Site Number Identifier Changed |
Changed workplan from LUST (00) to CS (01). |
Jim Frechione |
| 12/3/2002 |
GIS Position Updated |
Updated latitude and longitude based on coordinates supplied by Mike Crotteau of the Wellhead Protection Program as digitized using plat and/or orthophoto maps. Former coordinates derived from the USGS Place Name Utility gave the City of Sutton as the location. |
Former Staff |
| 10/5/2005 |
Update or Other Action |
Project manager changed from Jim Frechione to Dave Pikul. |
Sarah Cunningham |
| 12/4/2006 |
Update or Other Action |
File number updated 2245.38.032. |
Aggie Blandford |
| 6/10/2008 |
Update or Other Action |
Site transferred from Don Seagren to Linda Nuechterlein per Linda Nuechterlein. |
Alyce Hughey |
| 10/10/2014 |
Institutional Control Update |
IC compliance review on hold in order to find necessary documentation. |
Evonne Reese |
| 8/17/2016 |
Institutional Control Compliance Review |
Sent a letter on this date regarding re-documenting ICs and requesting written statement on any changes in land use since 1997 conditional closure. |
Nathan Maxwell |
| 8/22/2016 |
Institutional Control Update |
Received notification from Department of Corrections that contaminated soil has not been disturbed since closure and no demolition or excavation are planned in the near future. Will notify when conditions change or if disturbance is planned. |
Nathan Maxwell |
| 8/15/2024 |
Institutional Control Compliance Review |
IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in five years’ time. |
Gaige Robinson |