Action Date |
Action |
Description |
DEC Staff |
8/7/1992 |
Update or Other Action |
Initial site inspection by Don Fritz and Monica English with Tom Harris, Tyonek Native Corporation (TNC), CEO. Stained soils, drums and miscellaneous solid waste observed on site. |
Don Fritz |
8/13/1992 |
Update or Other Action |
MSDS sheets for various products observed at the site received from Milpark Drilling Fluids |
Don Fritz |
2/26/1993 |
Site Added to Database |
Multiple petroleum spills, barrels, and improperly stored drilling materials leaking to the ground. |
Former Staff |
8/11/1993 |
Cleanup Plan Approved |
Letter from ENSR, consultants for Grace Drilling, concerning emergency removal of drums, pails and other items containing fuel, oil, water, paint, etc. Paul Horwath advised that ADEC did not need to be involved at the time. |
Donald Seagren |
8/17/1993 |
Update or Other Action |
Letter form CIRI with comments on proposed ENSR emergency removal plan. |
Donald Seagren |
8/23/1993 |
Update or Other Action |
MSDS sheets received from Baker Hughes for the drilling mud at the site. |
Donald Seagren |
8/25/1993 |
Update or Other Action |
(Old R:Base Action Code = TECH - Technical Assistance). Reviewed drilling mud additive MSDS's for TNC and CIRI and provided disposal options for site cleanup. |
Former Staff |
8/30/1993 |
Update or Other Action |
letter to TNC and CIRI related to MSDS sheets for drilling additives remaining at the site. |
Donald Seagren |
9/16/1993 |
Update or Other Action |
Coordination with the ADEC Solid Waste Program on trying to reach a reasonable solution for disposal of all of the solid waste left on site. |
Donald Seagren |
11/1/1993 |
Site Characterization Report Approved |
Emergency Removal Program and surface Soil Sampling Report submitted. |
Donald Seagren |
12/1/1993 |
Site Ranked Using the AHRM |
Initial ranking. |
Former Staff |
10/1/1994 |
Site Characterization Workplan Approved |
Phase II Soil Sampling Plan received and subsequently approved. CIRI approved plan, but no approval ever received from TNC. Work was never conducted. |
Donald Seagren |
10/17/1994 |
Update or Other Action |
Phase II Soil Sampling Plan submitted |
Donald Seagren |
10/19/1994 |
Update or Other Action |
(Old R:Base Action Code = FI - Field Inspection (General)). Central Alaska Utilities conducted site inspection. |
Former Staff |
12/8/1994 |
Update or Other Action |
Phase II review comments sent to Grace Drilling. |
Donald Seagren |
2/2/1995 |
Update or Other Action |
Response to ADEC review comments received. |
Donald Seagren |
2/28/1995 |
Update or Other Action |
Response adequate. Formal written approval of the plan awaiting approval by CIRI and TNC. There were legal and contractual issues between lessors and lessee that were to be addressed. |
Donald Seagren |
4/10/1995 |
Update or Other Action |
CIRI letter of non-objection to the Phase II plan. CIRI letter to TNC outlining their position on the cleanup, testing and that TNC is ultimately responsible. |
Donald Seagren |
5/19/1995 |
Update or Other Action |
Letter from Grace Drilling that due to not receiving approvals from TNC, work will not be conducted this year. |
Donald Seagren |
5/10/2004 |
Update or Other Action |
File number assigned and entered into the Fileroom DB and CS DB. |
Alyce Hughey |
10/21/2005 |
GIS Position Updated |
Using Figure 1 from a Phase II Soil Sampling Plan Tyonek Staging Area, from ENSR Consulting and Engineering, dated October 1994, in conjunction with TopoZone Pro and the KPB Parcel Lookup, entered the coordinates for this site. Metadata includes No Topo Basemap, TopoZone Pro Street Maps, Black and White Aerial Photo, on a Medium Size Map, View Scale 1:10,000, Coordinate Datum NAD83. High degree of confidence in accuracy of location. |
Alyce Hughey |
5/9/2007 |
Exposure Tracking Model Ranking |
|
Donald Seagren |
6/11/2008 |
Update or Other Action |
Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. |
Alyce Hughey |
6/3/2009 |
Update or Other Action |
File transferred from Anchorage to Soldotna 6-3-09. Project Manager changed from Paul Horwath to Linda Nuechterlein. |
Alyce Hughey |
3/4/2013 |
Update or Other Action |
File Transferred from Anchorage to Soldotna. Project manager changed from Grant Lidren to Paul Horwath. |
Annie Ariel |
7/20/2021 |
Update or Other Action |
Phase II dated 1994 and an Emergency Removal Program and Surface Soil Sampling Report dated 1993 is the entirety of the hard copy files. |
Jessica Hall |
7/20/2021 |
Workplan Requested |
Sent Tyonek Native Corporation Work Plan Request and Information Request Letter. Work Plan due September 30, 2021. |
Jessica Hall |