Action Date |
Action |
Description |
DEC Staff |
11/20/1992 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). Written notification by Hart-Crowser, Inc. to WDO of free product occurrence in monitoring wells discovered on November 17, 1992 at the Frosty Fuel Tank Farm in Cold Bay. While making water level measurements Hart-Crowser personnel discovered 6.3 and more than 4.25 feet of fuel product in each of two monitoring wells. |
Former Staff |
12/17/1992 |
Notice of Violation |
NOV/RCA issued to Reeve Aleutian Airways, Inc. d.b.a. Frosty Fuel in Cold Bay. The NOV requests that information be provided to WDO by 12/23/92, that a Remedial Action Plan be submitted by 1/10/93, and specifies that the RAP must include commencement of product recovery by 1/15/93. |
Former Staff |
12/21/1992 |
Notice of Violation |
Notice of Release letter issued to Reeve Aleutian Airways DBA Frosty Fuel. |
Former Staff |
12/21/1992 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). Received letter from Hart-Crowser providing information requested in NOV/RCA of 12/17/92. Information requested by 12/23/92 included results of floating product laboratory analysis and a map showing all groundwater and surface water sources within a one-mile radius of the tank farm boundaries. Two wells owned by the FAA provide water to the community of Cold Bay and are located approximately 800 and 1000 feet from the Cold Bay tank farm. The Chem Lab analysis report includes this note: "Hydrocarbon sample appears to be a mixture of leaded gasoline and a middle distillate such as diesel fuel." Lead content of the sample was 211 ppm. |
Former Staff |
12/30/1992 |
Update or Other Action |
(Old R:Base Action Code = MS - Monitoring/Sampling). Telephone conversation with Matt Zukowski of Hart-Crowser, who reported that a Hart-Crowser technician traveled to the Frosty Fuel Tank Farm in Cold Bay on 12/28/92 to do a bail test on the monitoring wells to determine potential for fuel recovery. He said he hadn't assimilated the results yet but that the first indications are that bailing will be a very successful means of product recovery. VPH, EPH and 8020 tests will be run on water samples taken from monitoring wells in which floating product was not present, and a report of the bail test and sample analyses will be submitted to WDO. |
Former Staff |
1/4/1993 |
Site Ranked Using the AHRM |
Initial ranking. |
Former Staff |
1/11/1993 |
Site Added to Database |
Gasoline and diesel contamination. |
Former Staff |
4/27/1993 |
Update or Other Action |
(Old R:Base Action Code = SA2 - Phase II Site Assessment (General)). Telephone conversation with Matt Zukowski of Hart-Crowser, who reported that Phase II site assessment work, including installation of monitoring wells, to depths of up to 35 feet, is complete. Hart-Crowser personnel expect to measure water levels and determine whether floating product is present in the new wells nest week, after water levels have stabilized. At that time they will also report on the amount and fate of any product recovered to date. A Phase II SA report is not expected for at least a month, but Hart Crowser has agreed to provide weekly interim reports by telephone. |
Former Staff |
3/3/1994 |
Update or Other Action |
(Old R:Base Action Code = SA2R - Phase II SA Review (CS)). Remedial actions to date ineffective. |
Former Staff |
7/22/1994 |
Cleanup Plan Approved |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Plan approved, plan exceeds department's expectations. |
Former Staff |
3/25/1996 |
Cleanup Plan Approved |
(Old R:Base Action Code = RAPA - Remedial Action Plan Approval). Review modification for remedial action and approve, contingent upon water parameters not changing. |
Ray Dronenburg |
2/27/2004 |
Update or Other Action |
PM changed to Dave Pikul. |
David Pikul |
4/25/2006 |
Update or Other Action |
Project manager changed from Dave Pikel to Don Seagren per Paul Horwath. |
Alyce Hughey |
5/3/2006 |
GIS Position Updated |
Using the map in the file, in conjunction with TopoZone Pro and the DNR Land Survey, entered the coordinates for this site. Metadata includes USGS Topo Map 1:63K, TopoZone Pro Street Maps, on a Medium Size Map, View Scale 1:24,000, Coordinate Datum NAD83. Moderate to High degree of confindence in accuracy of location. |
Alyce Hughey |
6/1/2006 |
Update or Other Action |
Completed organizing and reviewing file and reports. Sent letter to current owner/operator requesting current project status update. If nothing has been done since the last report in 2000, at the minimum, a site assessment will be required to determine current site conditions. Any further actions to protect human health and the environment will be determined after review of any additional is submitted to, and reviewed by, ADEC. |
Donald Seagren |
4/14/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Donald Seagren |
6/12/2008 |
Update or Other Action |
Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. |
Alyce Hughey |
1/4/2016 |
Update or Other Action |
GIS position updated. Lat/long coordinates collected and verified using CS Internal ArcGIS.com web map (PH)
55.200949 -162.714592 |
Paul Horwath |
1/5/2016 |
Update or Other Action |
Contact Anchorage ADEC staff and request that confidential file be located and transferred to Soldotna. |
Paul Horwath |
1/14/2016 |
Update or Other Action |
A letter was issued to The Aleut Corporation, registered agent for Frosty Fuels, LLC, requesting an update on the status of site assessment and cleanup work, and requesting that any additional reports prepared since 2000 be provided for ADEC review and evaluation. A copy of ADEC's similar June 1, 2006 letter was attached to this January 14, 2016 letter. Letter sent Certified Mail - Receipt. |
Paul Horwath |
1/22/2016 |
Update or Other Action |
Received the signed Receipt for the letter sent Certified Mail. |
Paul Horwath |
2/26/2016 |
Potentially Responsible Party/State Interest Letter |
Issued PRP letter. |
Paul Horwath |
4/27/2017 |
Update or Other Action |
ADEC was contacted by Kanaga Environmental. Aleut Enterprises has hired Kanaga to perform environmental work, in response to ADEC's January 14, 2016 letter. Kanaga also submitted a Public Records Request, in order to obtain copies of records in ADEC's project file. |
Paul Horwath |
5/22/2017 |
Document, Report, or Work plan Review - other |
Reviewed and provided ADEC comments, in response to Susitna Environmental's May 2017 DRAFT Limited Field Investigation Work Plan. |
Paul Horwath |
8/1/2017 |
Update or Other Action |
Sent an e-mail to Shannon Oelkers, the RP's consultant, inquiring on status of report following the site inspection earlier this year. |
Paul Horwath |
5/9/2018 |
Document, Report, or Work plan Review - other |
Reviewed the Susitna Environmental prepared Limited Groundwater Investigation Report, dated August, 2017. |
Paul Horwath |
5/11/2018 |
Workplan Requested |
ADEC issued a letter-response to the Limited Groundwater Investigation Report, dated August 2017, and required that a site characterization work plan be prepared to submitted to ADEC by June 22, 2018. Focus of work plan to be identification of the extent and magnitude of the LNAPL plume, in order to support LNAPL recovery to the extent practical. |
Paul Horwath |
5/23/2018 |
Update or Other Action |
ADEC received letter from Aleut Enterprise's Rudy Tsukada, stating that Aleut would not be providing ADEC with the required work plan at this time. |
Paul Horwath |
6/12/2018 |
Update or Other Action |
ADEC issued a letter to Aleut Enterprise, responding to their May 23, 2018 letter to ADEC's Paul Horwath. ADEC's letter stated that Aleut Enterprise was deemed liable, following ADEC's review of their letter, and required their work plan for LNAPL assessment be submitted by July 13, 2018. |
Paul Horwath |
7/13/2018 |
Update or Other Action |
Received Aleut Enterprise's response to ADEC's letter dated June 12, 2018. Aleut has requested a 6-month extension of ADEC's July 13th deadline for work plan submittal to ID extent of LNAPL and recovery of LNAPL. |
Paul Horwath |
12/17/2019 |
Workplan Requested |
Sent Overdue Work Plan Request Letter to George Pollock, President
Aleut Enterprise, LLC. George replied via phone call on 12/17/2019, stated he received letter.
|
Jessica Hall |
1/10/2020 |
Meeting or Teleconference Held |
Spoke to Mr. Pollack via phone. Scheduled a meeting for February 7, 2020 to discuss 2020 field efforts and Work Plan requirements. |
Jessica Hall |
2/12/2020 |
Meeting or Teleconference Held |
In person meeting at 555 Cordova ADEC offices, with Shannon Oelkers(Integrity Environmental), George Pollock (Aleut Enterprises), Russ Beck, and Kara Kusche. Discussed 2020 field season efforts. The soil still needs to be characterized at this site. The ferry runs May and September to maybe mobilize some equipment. There are no drinking water wells on the property. There is no money available for drilling in 2020 per George Pollock. Aleut might seek closure with Institutional controls. |
Jessica Hall |
5/12/2020 |
Update or Other Action |
Sent email to George Pollock requesting information on plans for the field efforts for 2020 season. |
Jessica Hall |
8/28/2020 |
Update or Other Action |
Sent email to George Pollock of Aleut Enterprise Corporation and Shannon Oelkers of Integrity Environmental requesting information on plans for the field efforts for 2020 season. |
Jessica Hall |
10/2/2020 |
Update or Other Action |
Integrity Environmental LLC on behalf of Aleut Enterprise Corporation requested an extension of the 2020 field work to be done from the approved workplan to be done in 2021. ADEC approved this extension. See email in site file, dated 10.02.20. |
Jessica Hall |
12/14/2021 |
Update or Other Action |
Workplan implemented in August 2021 and Site Characterization report to follow in January 2022. |
Jessica Hall |
7/19/2022 |
Document, Report, or Work plan Review - other |
ADEC sent comments to Aleut Enterprises on the “Draft Product Characterization and Groundwater Monitoring Report Frosty Fuels Tank Farm”, dated July 2022 and requested and updated report be submitted for review. |
Jessica Hall |
10/19/2022 |
Site Characterization Report Approved |
ADEC sent the responsible party an approval letter for “Final Product Characterization and Groundwater Monitoring Report Frosty Fuels Tank Farm”, dated September 2022. |
Jessica Hall |
12/15/2023 |
Site Characterization Workplan Approved |
Sent RP approval of Groundwater Gauging, Product Recovery and Land Survey workplan dated December 13, 2023. |
Dawn Wilburn |