Site Report: Alyeska Prospect Creek Camp

Site Name: Alyeska Prospect Creek Camp
Address: Mile 135.7 Dalton Highway, 277 Mi. S. of Deadhorse, Coldfoot, AK 99701
File Number: 330.38.048
Hazard ID: 16
Status: Cleanup Complete
Staff: IC Unit, 9074655229 dec.icunit@alaska.gov
Latitude: 66.794389
Longitude: -150.724400
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Multiple contaminants of soil and GW exist from historic releases during operation of a pipeline construction camp. Fresh water and wetlands present. TAPS Alignment: AS92; MP275. Day use/picnic area. Recreational and subsistence hunting, fishing and food gathering activities occur throughout the area. Jim River is an anadromous stream containing sensitive fish resources. Prospect Creek is considered critical habitat and sensitive all year.

Action Information

Action Date Action Description DEC Staff
6/30/1998 Site Ranked Using the AHRM Initial ranking. Donald Seagren
7/1/1998 Site Added to Database Site added by staff. Multiple contaminants. Donald Seagren
7/9/1998 Site Ranked Using the AHRM Site reranked by staff. Quantity Value changed from 3 to 4. The total spill was 47,500 gallons. Donald Seagren
1/24/2000 Update or Other Action Reviewed 1999 Surface and GW Monitoring Report. Donald Seagren
11/2/2000 Record of Decision Waiting for 2000 GW monitoring report for final site closure. Donald Seagren
11/3/2000 Update or Other Action Sent NFA letter along with signed ROD to Alyeska. Site closure awaiting review and approval of 2000 GW monitoring report. Donald Seagren
1/25/2001 Institutional Control Record Established Institutional Controls Established. Donald Seagren
1/25/2001 Long Term Monitoring Established Long term monitoring established on the surface water and the suprapermafrost groundwater for the site. Deborah Williams
1/25/2001 Conditional Closure Approved Files transferred to Deb Williams ADEC Fairbanks. Donald Seagren
1/25/2001 Update or Other Action 2000 Surface water and Groundwater Monitoring report reviewed and approved. Donald Seagren
8/15/2001 Cleanup Plan Approved Risk-based remedial action workplan approved for ground and surface water monitoring. Renee Evans
4/8/2002 Long Term Monitoring Complete Long term monitoring completed for this site. Water samples taken from the surface water and suprapermafost groundwater indicated stable or decreasing contaminant levels. Deborah Williams
3/14/2008 Update or Other Action Received Trans Alaska Pipeline System: 2007 Monitoring Well Decommissioning Report. Each of the seven monitoring wells installed at this site were successfully located and decommissioned. Keather McLoone
12/1/2011 Update or Other Action The current project manager chose to retain management of this site with the Cleanup Complete Determination that has Institutional Controls. Kristin Thompson
11/10/2013 Update or Other Action Staff changed from Linda Nuechterlein to IC Unit. Kristin Thompson
11/19/2013 Institutional Control Compliance Review IC review conducted. It was determined that ICs can be removed from this site due to the age of the site (closed in 2001), groundwater monitoring had shown that contaminant concentrations were below Table C, there was only one soil sample that was above the migration to groundwater cleanup level for DRO, and the low risk of exposure to the remaining contamination. Evonne Reese
11/19/2013 Institutional Control Record Removed The conditions at this site meet the 2009 closure policy, therefore ICs can be removed. The information included in the 2001 conditional closure decision document is still applicable along with the default requirement of no offsite transport of soil or groundwater without prior approval from ADEC. In accordance with 18 AAC 75.380(d)(2), ADEC may require additional site assessment, monitoring, remediation, and/or other necessary actions at this facility should new information become available that indicates contamination at this site may pose a threat to human health or the environment. Evonne Reese

Contaminant Information

Name Level Description Media Comments
DRO Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.