Action Date |
Action |
Description |
DEC Staff |
1/13/1992 |
Document, Report, or Work plan Review - other |
Date of receipt document entitled North Slope Borough Spill Assessment - Point Lay, September 1991 by VCRA. |
Keather McLoone |
3/16/1992 |
Document, Report, or Work plan Review - other |
Date of receipt of document entitled Point Lay Power Generation Facility, Summary of Activities and Investigations by VCRA. |
Keather McLoone |
3/24/1992 |
Site Added to Database |
Diesel. |
Former Staff |
4/15/1992 |
Meeting or Teleconference Held |
Met with URCA/NSB to discuss updated SA, site condition, fiscal limitations. To review and respond. |
Former Staff |
4/16/1992 |
Document, Report, or Work plan Review - other |
Date of receipt of document entitled Point Lay Power Generation Facility Fuel Spill, Summary of Activities and Investigations. This appears to be a revision of a document with same title submitted one month earlier. |
Keather McLoone |
6/24/1992 |
Update or Other Action |
ADEC staff sent PRP-CS Database Notification Letter to PRP requesting update and additional environmental information concerning the contaminated site. As of this "complete date" no response has been received. (Old R:Base Action Code = RPL2 - Site Information Request Letter). |
Jeff Peterson |
7/22/1992 |
Meeting or Teleconference Held |
Met with NSB representatives to discuss cleanup options. Will send letter to NSB requesting additional action. |
Cindy Thomas |
7/22/1992 |
Update or Other Action |
Staff inspected and photo documented site conditions at site. 2-3 acres of tundra and gravel pad heavily impacted with fuel spill. Sheen in puddles. Some acres and patches are revegetating. (Old R:Base Action Code = RECN - Site Reconnaissance (CS)). |
Cindy Thomas |
8/1/1992 |
Update or Other Action |
Staff received report by VCRA regarding Release Investigation Summary. (Old R:Base Action Code = SA2 - Phase II Site Assessment (General)). |
Cindy Thomas |
8/25/1992 |
Update or Other Action |
Staff requested Release Investigation, corrective action plan. (Old R:Base Action Code = CORR - Correspondence (General)). |
Cindy Thomas |
8/25/1992 |
Update or Other Action |
Date of letter from DEC to NSB regarding Field Inspection and Status Update of the North Slope Borough Tank Farm at Point Lay. Now a former tank farm as of 2014 - not sure when the tank farm was decommissioned. |
Keather McLoone |
9/14/1992 |
Meeting or Teleconference Held |
Met with NSB, VRCA and Point Lay villagers to discuss status of site. Will submit to ADEC release investigation by 11-1-92 and draft corrective action plan by 12-25-92. |
Cindy Thomas |
9/15/1992 |
Update or Other Action |
Staff sent letter to NSB outlining results of 9-14 meeting. Also notified NSB of pending compliance order. (Old R:Base Action Code = CORR - Correspondence (General)). |
Cindy Thomas |
10/1/1992 |
Update or Other Action |
Staff sent draft compliance order by consent to NSB to address continuation in gravel pad, tundra wetlands. 30 day review deadline. (Old R:Base Action Code = CORR - Correspondence (General)). |
Cindy Thomas |
11/9/1992 |
Update or Other Action |
Release investigation presented as required in COBC, will review and comment. (Old R:Base Action Code = SA2 - Phase II Site Assessment (General)). |
Former Staff |
11/9/1992 |
Document, Report, or Work plan Review - other |
Date of receipt of document entitled Point Lay Power Generation Facility Diesel Fuel Spill, Release Investigation Summary dated November 1992 by VCRA. |
Keather McLoone |
12/1/1992 |
Document, Report, or Work plan Review - other |
December 1992 document entitled Recommendations for Remediation, Point Lay Power Generation Facility prepared by RZA AGRA. |
Keather McLoone |
12/7/1992 |
Site Characterization Report Approved |
Staff reviewed Release Investigation and determined that sufficient information has been gathered to develop a corrective action plan. Will await final plan under COBC. (Old R:Base Action Code = SA2R - Phase II SA Review (CS)). |
Cindy Thomas |
1/10/1993 |
Update or Other Action |
Sent final version of COBC to North Slope Borough for signature. COBC includes release investigation and corrective action phase. Cleanup to be completed by September 1994. |
Cindy Thomas |
2/18/1993 |
Document, Report, or Work plan Review - other |
Staff reviewed and rejected draft corrective action plan (entitled Corrective Action Report (McLoone edit), submitted by VRCA for NSB. Plan inadequate and needs significant revisions. Letter to NSB 2/22/93 outlined deficiencies. Final Corrective action plan due 3/30/93 as per COBC. (Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). |
Cindy Thomas |
2/22/1993 |
Meeting or Teleconference Held |
Met with NSB and VRCA. All parties agreed that corrective action plan submitted 2/18/93 was inadequate. Discussed elements of proper workplan, and regulatory expectations. Will receive draft CAP 3/15/93, and final plan 3/30/93. |
Cindy Thomas |
3/15/1993 |
Document, Report, or Work plan Review - other |
Staff received "Interim Draft Corrective Action Plan for Point Lay", outlining strategy for action at site. Plan brief, but outlines 4 phases for completing project. Joint venture between VRCA and RZA-AGRA. Ex-situ bio-cell and tundra revegetation recommended. Final plan to be submitted 3-31-93. (Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). |
Cindy Thomas |
3/17/1993 |
Meeting or Teleconference Held |
Met with VRCA, RZA-AGRA, and NSB to discuss elements of workplan for corrective action. ADEC agreed that schedule and outline were acceptable, final plan forthcoming 3/31/93. |
Cindy Thomas |
3/31/1993 |
Document, Report, or Work plan Review - other |
Date of receipt of document entitled Final Corrective Action Plan, Power Generation Facility and Cully Corporation School prepared by RZA AGRA dated March 1993. |
Keather McLoone |
6/7/1993 |
Update or Other Action |
Staff reviewed and approved plan to abate petroleum leachate at new location of water tank next to impacted tundra. Project is separate but adjacent to NSB Power plant spill. (Old R:Base Action Code = CORR - Correspondence (General)). |
Cindy Thomas |
7/7/1993 |
Update or Other Action |
Staff met with FNSB, VRCA, Woodward and Clyde, and MAC to inspect 1993 field conditions at site. Consultants presented modifications to treatment plan including off-site soil washing. Told them conceptual plan well done. Will be mailed and will comment on modifications. Vegetation noted to be recovering well. Gravel pad still saturated. (Old R:Base Action Code = RECN - Site Reconnaissance (CS)). |
Cindy Thomas |
8/1/1993 |
Update or Other Action |
Staff verbally approved the removal of contaminated gravels from the pad to be relocated and stockpiled according to ADEC guidance at the Point Lay landfill. Approximately 3,000 yards of gravel was removed. Woodward-Clyde and VRCA have been at the site this summer preparing for soil removal and storage. Soil washing with hot water wash unit is slated for summer 1994. (Old R:Base Action Code = RAU - Remedial Actions Underway (General)). |
Cindy Thomas |
8/1/1993 |
Document, Report, or Work plan Review - other |
August 1993 document entitled Point Lay Power Plant & Cully School Modified Corrective Action Plan prepared by Woodward-Clyde. |
Keather McLoone |
11/17/1993 |
Document, Report, or Work plan Review - other |
Date of receipt of document entitled Summary Report for Point Lay Site Remediation. This is a brief, 3 page letter report. |
Keather McLoone |
7/1/1994 |
Document, Report, or Work plan Review - other |
July 1994 documents entitled Remediation Program Work Plan and Sampling and Analysis Plan prepared by VCRA. |
Keather McLoone |
9/20/1994 |
Update or Other Action |
Modified COBC to extend cleanup deadline from 9/30/94 to 9/30/95. Soil washing unit arrived late at Point Lay; cleanup schedule not completed. Unit will winter in village and commence cleanup next spring. |
Cindy Thomas |
12/1/1995 |
Document, Report, or Work plan Review - other |
December 1995 document entitled Field Report, Point Lay Soil Remediation, Power Generation Site Project, Volume II Appendix D. The other parts of this document should be in file for NSB Point Lay Kali School sit 425.38.004. |
Keather McLoone |
1/22/2002 |
Update or Other Action |
See Point Lay Cully School site. |
Renee Evans |
6/29/2005 |
Update or Other Action |
S&W SA from 2003 received. Containment liner was in poor condition. Soil stains, drums stored on site, some not labeled and dented, leaking or missing bung tops. Fuel transfer lines were missing some stabilization footings. PID readings were between 1 and 49 ppm. No analytical soil samples were taken. Analytical surface water sample was taken, DRO, toluene, ethylbenzene and xylenes were detected, but not above ADEC cleanup levels. |
Shannon Oelkers |
6/29/2005 |
Document, Report, or Work plan Review - other |
Date of cover letter for document entitled Areawide Contaminated Sites Assessment Summary Report which covers 7 NSB communities including Point Lay prepared by Shannon & Wilson. |
Keather McLoone |
9/22/2006 |
Cleanup Level(s) Approved |
8/9/05 - Larry Johnson met with representatives from NSB, ADEC Solid Waste, PERP, and ASCG. On a per site basis, ADEC agreed to allow characterized soil stockpiled in village to be used as landfill cover. Soil cannot exceed 12,500 mg/kg DRO. In areas that soils exceed ADEC levels, the borough will continue remediation. |
Shannon Oelkers |
9/25/2006 |
Update or Other Action |
Letter sent to NSB requesting current site information, further site characterization and plans for remediation. |
Shannon Oelkers |
7/26/2007 |
Meeting or Teleconference Held |
ADEC staff met with NSB and their consultant to review open status village files and to propose responses to the ADEC's request for further information and characterization at this site. |
Bill O'Connell |
7/27/2007 |
Update or Other Action |
Site transferred from Oelkers to O'Connell. |
Shannon Oelkers |
8/30/2007 |
Exposure Tracking Model Ranking |
|
Bill O'Connell |
10/24/2007 |
Meeting or Teleconference Held |
Meeting today with NSB and their consultant to discuss current site status. |
Bill O'Connell |
4/1/2008 |
Document, Report, or Work plan Review - other |
April 2008 document entitled Contaminated Sites Review, Point Lay. Document is filed under NSB Point Lay Kali School sit 425.38.004. |
Keather McLoone |
5/6/2008 |
Update or Other Action |
Meeting with NSB and their consultant, and submittal of Contaminated sites review. The site investigated in 2003 was the current tank farm, not the Power Plant Tank Farm that is the source area for this site. No soil samples were collected. Surface water had DRO at 0.651 mg/L. Report recommends additional characterization. |
Bill O'Connell |
6/26/2009 |
Document, Report, or Work plan Review - other |
Reviewed 2008 Point Lay Site Assessment Report. The majority of the investigations reported in this document pertain to the Kali School Site, however three surface water samples were also collected at this site during the same investigation. Samples were collected from tundra ponds near the location of the former tanks. DRO and RRO were detected, but BTEX and PAHs were not detected. No sheen was observed in shovel sheen tests performed in the ponds. |
Bill O'Connell |
2/18/2011 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 72602 Former Bulk Fuel ASTs. |
Bill O'Connell |
3/2/2011 |
Cleanup Complete Determination Issued |
The Alaska Department of Environmental Conservation, Contaminated Sites Program (ADEC) has completed a review of the environmental records associated with the NSB Point Lay Former Tank Farm/Point Lay Power Plant located in Point Lay, Alaska. Based on the information provided to date, it has been determined that the contaminant concentrations remaining on site do not pose an unacceptable risk to human health or the environment and no further remedial action will be required as long as the site is in compliance with established institutional controls. |
Bill O'Connell |
3/2/2011 |
Institutional Control Record Established |
Institutional Controls established and entered into the database. |
Bill O'Connell |
2/9/2012 |
Institutional Control Compliance Review |
IC review conducted, staff name changed from O'Connell to IC Unit, periodic followup added as an IC Requirement, and the reminder system was updated. |
Evonne Reese |
8/14/2014 |
Update or Other Action |
Staff name changed from IC Unit to McLoone. |
Evonne Reese |
10/6/2014 |
Update or Other Action |
Location corrected on today's date to the former removal area. Conversation with NSB consultant suggests that site features previously limiting efforts at this site are still present. |
Keather McLoone |
10/6/2014 |
Institutional Control Update |
Current project manager chooses to retain management of the site at this time. |
Kristin Thompson |
4/4/2016 |
Institutional Control Compliance Review |
IC review conducted and the reminder system was updated. |
Joshua Barsis |
10/6/2016 |
Institutional Control Update |
Staff changed from Joshua Barsis to IC Unit. An IC reminder letter was issued. Reminder system set to follow-up every five years. |
Kristin Thompson |
7/20/2023 |
Site Characterization Report Approved |
In April 2022, NSB conducted a limited site characterization effort in support of a potential water source development project in Point Lay. Two borings (G22-EB01 and G22-EB02) were both advanced to 30 feet below ground surface (bgs) on Lot 4D on or near the NSB Point Lay Former Tank Farm/Point Lay Power Plant contaminated site (Hazard ID 1624). A third boring (G22-EB03) was advanced to 30 feet bgs on Lot 8, east of the site mentioned above and west of the NSB Point Lay DMS Drum Storage Area contaminated site (Hazard ID 25365) on Lot 8 at the water treatment plant. Three laboratory analytical samples were collected from each boring.
In borings G22-EB01 benzene and naphthalene exceeded were detected but below the Arctic Zone human health CUL. In G22-EB02 there were exceedances of GRO and DRO above Method 1 Table A2 CUL. Several other analytes were detected but were below the Arctic Zone human health CUL.
In boring G22-EB03 near the water treatment plant total xylenes, 1,2,4-trimethylbenzene, and naphthalene exceeded the Arctic Zone human health cleanup levels at 5-7.5 feet bgs.
|
Lisa Krebs-Barsis |