9/19/1992 |
Update or Other Action |
(Old R:Base Action Code = RAU - Remedial Actions Underway (General)). Reported 130 cubic yards of heating oil contaminated soil thermally remediated at ESI facility. Four QC samples checked using 418.1. |
Don Gibler |
10/12/1992 |
Update or Other Action |
(Old R:Base Action Code = SA1 - Phase I Site Assessment (General)). Received assessment prepared by ESI for removal of 2 - 2,000 gallon heating oil tanks. Closure took place on 9/14-15, 1992. Migration of contaminates based on soil sample 2 feet above water table. |
Don Gibler |
12/1/1992 |
Site Added to Database |
Heating oil. |
Don Gibler |
12/1/1992 |
Update or Other Action |
(Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). Reviewed contaminated soil remains on site. Groundwater is impacted. soil classified as silty clay. ESI concluded no significant migration of contaminates based on soil sample 2 feet above water table. |
Don Gibler |
12/2/1992 |
Site Ranked Using the AHRM |
Initial ranking. |
Don Gibler |
12/3/1992 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). Reports letter to NSI - change matrix score, fluid extent of contamination. Do not use 418.1 analyses in future work. Use of water recovery-reinjection will require ADEC approval and permits. |
Don Gibler |
12/31/1992 |
Meeting or Teleconference Held |
Gibler and Kalu met with Carl Overpeck of ESI to discuss possible remediation methods. Overpeck says apparent failure to obtain equivalent results from 418.1 and 8100M was due to clerical error in reporting identical sample locations. He will clarify. Numerous 8100 vs. 418.1 results were given to substantiate agreement. |
Don Gibler |
6/29/1994 |
Update or Other Action |
(Old R:Base Action Code = RPL2 - Site Information Request Letter). Sent PRP-CS Database Notification letter to RP requesting update and more environmental information concerning contaminated site. Letter returned as unclaimed! |
Jeff Peterson |
1/9/2012 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 72625 name: heating oil tank |
Tamara Cardona-Marek |
8/12/2013 |
Update or Other Action |
Site symbol visually adjusted using ArcGIS, Bing satellite imagery, and documents from the file. 64.816978, -147.716433. 8/12/13; MLB. |
Michelle Barnes |
9/11/2013 |
Spill Transferred from Prevention Preparedness and Response Program |
Spill transferred by PERP staff Ashley Adamczak. Spill no. 13309913501; spill date = 5/15/13; substance = #2 diesel; quantity = unknown; source = fill pipe of 1,500-gallon underground heating oil tank; PERP file no. 102.02.001. |
Mitzi Read |
9/16/2013 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 72625 heating oil tank. |
Mitzi Read |
6/13/2014 |
Document, Report, or Work plan Review - other |
Received Tank Decommissioning and Site Assessment Report dated May 9, 2014 |
Willett Boger |
12/27/2016 |
Document, Report, or Work plan Review - other |
Reviewed Tank Decommissioning and Site Assessment Report dated May 9, 2014 and contacted consultant to ask about status of site. Groundwater at the site has been impacted and monitoring will be required. |
Michael Hooper |
12/29/2016 |
Update or Other Action |
Received an Interim Groundwater Monitoring Report dated November 8, 2014. |
Michael Hooper |
1/9/2017 |
Update or Other Action |
Mailed RP a letter requesting groundwater delineation. |
Michael Hooper |
4/5/2017 |
Update or Other Action |
Emailed RP and Consultant about status of workplan requested in January. |
Michael Hooper |
5/23/2017 |
Document, Report, or Work plan Review - other |
Received a work plan for groundwater delineation on May 16, 2017. Finished review and provided comment letter on May 23, 2017. Comment letter has a deadline of June 16, 2017 for the revised work plan. |
Michael Hooper |
6/16/2017 |
Document, Report, or Work plan Review - other |
Received response to comments and revision one to the release investigation workplan on June 13, 2017. On June 16, 2017 I reviewed and approved workplan and mailed workplan approval letter. Work is tentatively scheduled for the end of August. |
Michael Hooper |
5/4/2018 |
Offsite Soil or Groundwater Disposal Approved |
Approved transport of IDW from groundwater sampling event. |
Michael Hooper |
5/15/2019 |
Document, Report, or Work plan Review - other |
Reviewed 2017 groundwater monitoring report. The plume was delineated with installation of additional monitoring wells. Contamination does not appear to be migrating off property. ADEC is awaiting report for 2018 groundwater monitoring and will issue recommendations upon review of most recent site data. |
Michael Hooper |
9/23/2020 |
Document, Report, or Work plan Review - other |
Reviewed groundwater characterization report recommending additional groundwater sampling. |
Michael Hooper |
8/27/2021 |
Site Characterization Report Approved |
Reviewed groundwater monitoring report. ADEC agrees more sampling is necessary. |
Michael Hooper |
6/9/2022 |
Document, Report, or Work plan Review - other |
Reviewed 2021 Groundwater monitoring report. Groundwater concentrations have fluctuated and not yet shown a downward trend. Continued monitoring is recommended. |
Michael Hooper |
5/19/2023 |
Site Characterization Report Approved |
Approved GWM Report, approved recommendation to switch to biennial sampling starting in 2024. GW has not yet been shown to be stable and decreasing in the source area monitoring wells. |
Michael Hooper |