Site Report: Pioneer Equipment Facility
Site Name: | Pioneer Equipment Facility |
---|---|
Address: | 8 Miles E. of Delta Jct., Delta Junction, AK 99737 |
File Number: | 170.38.004 |
Hazard ID: | 1687 |
Status: | Cleanup Complete - Institutional Controls |
Staff: | IC Unit, 9074655229 dec.icunit@alaska.gov |
Latitude: | 63.973886 |
Longitude: | -145.511134 |
Horizontal Datum: | WGS84 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
A 1992 complaint contained pictures of suspected waste oil and oil contaminated soil. Site inspection showed evidence of recent cleanup, however, drums in pictures had been removed, and soil scraped where former surface staining had been present. Inspection did reveal a pallet of used car batteries on site. Groundwater or surface water impact unlikely.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
3/19/1992 | Site Added to Database | Waste oil is primary contaminant of concern. | Former Staff |
3/19/1992 | Site Ranked Using the AHRM | Initial ranking. | Former Staff |
4/24/1992 | Update or Other Action | On 11/15/19991 John Bauer inspected Pioneer Equipment facility after receiving an anonymous complaint about the presence of leaking drums (with photos of the drums and their location) . During his site visit Bauer observed that the former location of the drums had been cleared and graded. There was no evidence of surface staining or remaining contamination. Two piles of used vehicle batteries were identified, and the owner stated that the batteries, along with other wastes were to be cleared from the site and that the property was to be sold. | Shannon Oelkers |
6/20/1994 | Update or Other Action | (Old R:Base Action Code = RPL2 - Site Information Request Letter). Sent PRP-CS Database Notification Letter to RP requesting update and more environmental information concerning contaminated site. RP received letter, but no response yet. | Jeff Peterson |
5/22/2000 | Update or Other Action | Teleconference with Light about his visit he will do this summer. | Bill Janes |
5/2/2007 | Update or Other Action | ADEC staff Oelkers and Williams conducted site visit. Shop building was semi-abandoned. Behind the building a large pile of trash included disintegrated batteries, oil filters, crushed drums. | Shannon Oelkers |
12/6/2007 | Update or Other Action | Talked to Teri Wiland on the phone- gave us correct address. She said they would like to cleanup property to sell it. She asked realtor to find consultant but did not receive response. | Neal Everson |
12/10/2007 | Update or Other Action | Sent letter to PRP asking if they are willing/able to perform cleanup. | Neal Everson |
12/27/2007 | Exposure Tracking Model Ranking | Initial ranking with ETM completed. | Neal Everson |
6/25/2008 | Update or Other Action | ADEC staff Everson and Frechione visited site. There is a well on east side of bldg- unknown depth and use. Surface soil staining exists on western side of property- probably caused by parked vehicles. Batteries were observed on western side of property- not leaking or corroded. No evidence of significant contamination was observed. | Neal Everson |
6/30/2008 | Institutional Control Record Established | Neal Everson | |
6/30/2008 | Conditional Closure Approved | Neal Everson | |
5/3/2011 | Institutional Control Compliance Review | IC review conducted, staff changed to IC Unit, reminder system activated. | Evonne Reese |
1/22/2013 | Update or Other Action | Site symbol visually adjusted using ArcGIS.com, Google satellite imagery, and documents from the file. | Laurel Gale |
12/2/2013 | Institutional Control Update | An IC reminder letter was issued to the responsible party on this date. | Kristin Thompson |
12/27/2016 | Institutional Control Compliance Review | IC compliance review conducted and IC reminder letter issued. Next follow-up is scheduled for 2019. | Kristin Thompson |
5/8/2020 | Institutional Control Compliance Review | An IC compliance review was conducted on this date and a reminder letter of the current site conditions was issued to the responsible party on record. The next compliance review will occur in 2022. | IC Unit |
6/11/2024 | Institutional Control Compliance Review | IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in five years’ time. | Gaige Robinson |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
DRO | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil | |
GRO | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil | |
BTEX | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil | |
Lead - Total | Other | Soil |
Control Type
Type | Details |
---|---|
CS Database Notation And Letter To Landowner/RP |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. | Must be approved by ADEC prior to removal. Standard condition. |
Groundwater Use Restrictions | ADEC recommends sampling water well if used for drinking purposes. |
Other | ADEC recommends batteries stored on site by properly managed and maintained to prevent leaks and corrosion. |
Other | If shop building has floor drains, this must be reported to EPA and properly closed. |
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) | Standard condition. |
No associated sites were found.