Site Report: FAA Northway Tank 52-C-01 (former) Shop Building 202
Site Name: | FAA Northway Tank 52-C-01 (former) Shop Building 202 |
---|---|
Address: | Former Building 202, Northway, AK 99764 |
File Number: | 170.38.016 |
Hazard ID: | 1694 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 62.964033 |
Longitude: | -141.924633 |
Horizontal Datum: | WGS84 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
The 1000 gallon heating oil tank was removed on 8/3/2000. Approximately 3 cubic yards were excavated for tank removal. An additional 12 cubic yards of potentially fuel contaminated soil was removed from the excavation after tank removal based on field screening. The soil was moved to a stockpile at the Central Area/Bulk Fuel storage site and shipped off-site with those soils.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
10/20/1990 | Site Added to Database | Former Staff | |
10/20/1990 | Interim Removal Action Approved | Approximately 15 cubic yards of contaminated soil stockpiled on site. | Former Staff |
10/26/1990 | Update or Other Action | (Old R:Base Action Code = NOR - Notice of Release Letter (LUST)). Sent notice of release letter. | Don Gibler |
2/23/1993 | Update or Other Action | (Old R:Base Action Code = RPL2 - Site Information Request Letter). Sent PRP-CS Database Notification Letter to RP requesting update and more environmental information concerning the contaminated site. RP responded with corrections on ADEC site report. | Jeff Peterson |
4/7/1993 | Site Ranked Using the AHRM | Initial ranking. | Former Staff |
9/29/1994 | Update or Other Action | (Old R:Base Action Code = TECH - Technical Assistance). Consulted with Larry Acomb, consultant for Northway LUST project, regarding CAP. He stated permafrost will not affect air sparging, soils are not as fine as initially thought; they will adjust blower to force more air through soils. Mounding not a problem, product is old with low solubility. VOCs are estimated to be low, probably won't do fertilizer and no studies are planned for microbes. Stated project will begin next May 1995. Subsequently sent letter further addressing ADEC concerns over this remediation plan. | Jackie Dupee |
10/5/1994 | Update or Other Action | Reviewed and updated file. | Jackie Dupee |
10/17/1994 | Site Characterization Report Approved | (Old R:Base Action Code = SA2R - Phase II SA Review (CS)). Reviewed Harding Lawson Associates Release Investigation dated 05/20/93. Extensive groundwater and soil contamination. Addressed contamination in letter dated 10/17/94 concerning RI and CAP. | Jackie Dupee |
10/17/1994 | Cleanup Plan Approved | (Old R:Base Action Code = CAPR - Corrective Action Plan Review (LUST)). Reviewed Corrective Action Plan dated 04/20/94. Sent letter dated 10/17/94 requesting additional information on proposed remediation plan not contained in CAP. | Jackie Dupee |
9/1/1999 | Update or Other Action | ADEC file review and letter sent requesting additional site characterization | Eileen Olson |
10/11/1999 | Meeting or Teleconference Held | Met with FAA staff and consultant to discuss department review of plan received November 3rd; due to short time frame was not able to complete review before work begun. Department staff requested additional borings and characterization work. | Eileen Olson |
9/18/2002 | Update or Other Action | Sent letter requesting groundwater monitoring for all existing wells on site, with a schedule of monitoring to be submitted by March 31, 2003 and the monitoring to be complete by June 30, 2003. | Elizabeth Stergiou |
9/19/2002 | Update or Other Action | Sent general letter requesting the following documents be submitted by 10/1/02: remedial action report for work completed in 2000. | Elizabeth Stergiou |
9/4/2003 | Update or Other Action | ADEC approved the workplan for the Fall 2003 Sampling and Analysis Plan for various sites. | Deborah Williams |
6/23/2008 | Exposure Tracking Model Ranking | Initial ranking with ETM completed. | Kim DeRuyter |
4/29/2013 | Update or Other Action | Request received from FAA for closure of tank 52-C-1 | Debra Caillouet |
5/2/2013 | Cleanup Complete Determination Issued | Staff reviewed file and found the site met the requirements for closure | Debra Caillouet |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
DRO | < Method 2 Most Stringent | Soil |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|
No associated sites were found.