8/29/1990 |
Preliminary Assessment Approved |
PA performed by site. Declined as candidate for NPL, but significant soil contamination found with PNAs and VOCs in drums. |
Dan Basketfield |
4/1/1992 |
Site Added to Database |
Multiple contaminants. |
Dan Basketfield |
11/13/1992 |
Update or Other Action |
(Old R:Base Action Code = NFA - No Further Action Required (CERCLA)). Score too low for NPL. "No Further Remedial Action Planned" recommended by EPA. |
Former Staff |
12/7/1992 |
Update or Other Action |
(Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). Reviewed EPA PA concerning the site. Significant soil contamination found PNAs and VOCs. |
Dan Basketfield |
4/9/1993 |
Site Ranked Using the AHRM |
Initial ranking. |
Former Staff |
7/20/1993 |
Update or Other Action |
(Old R:Base Action Code = FI - Field Inspection (General)). ADEC taken to site for field inspection. |
Former Staff |
2/14/1994 |
Update or Other Action |
(Old R:Base Action Code = RPL2 - Site Information Request Letter). Sent PRP-CS Database Notification Letter to RP requesting update and more environmental information. RP responded with update and completed information form. |
Jeff Peterson |
7/6/1999 |
Site Characterization Workplan Approved |
Letter sent approving "Draft Work Plan/Sampling and Analysis Plan, Maclaren Glacier Mine Site Characterization, Maclaren Glacier, Alaska" dated July 2, 1999. Since site work was underway at the time of work plan approval, the Department requested that photo documentation of site conditions and site activities be submitted to the Department within 30 days of completion of field work. In addition, ADEC requested that a meeting be held to determine requirements for interim removal or containment of drums and/or stained soils. |
Eileen Olson |
1/4/2000 |
Update or Other Action |
To date the Department has not received the requested photographic documentation of site conditions and site work. Project manager changed from Eileen Olson to Deborah Williams. |
Eileen Olson |
1/13/2000 |
Update or Other Action |
Site Characterization and Removal Action report received. |
Renee Evans |
2/24/2000 |
Meeting or Teleconference Held |
Teleconference with HLA, and BLM regarding Site Characterization. |
Renee Evans |
2/25/2000 |
Update or Other Action |
Method 3 parameters received by ADEC. |
Renee Evans |
2/29/2000 |
Update or Other Action |
Revised matrix score sheet received by ADEC. |
Renee Evans |
4/3/2000 |
Site Characterization Report Approved |
Site Characterization Report Approved this date. |
Renee Evans |
6/26/2000 |
Update or Other Action |
Method 3 calculations/corrections faxed to HLA. |
Renee Evans |
6/30/2000 |
Cleanup Level(s) Approved |
Method 3 level for DRO and Benzene approved by Jim Frechione. |
Jim Frechione |
7/11/2000 |
Record of Decision |
Record for Decision for alternative cleanup levels signed by Jim Frechione. |
Jim Frechione |
7/11/2000 |
Update or Other Action |
Cover letter with ROD requesting cleanup plan sent to BLM by ADEC. |
Renee Evans |
8/31/2000 |
Cleanup Plan Approved |
Cleanup plan approved for landspreading DRO and benzene contaminated soils. |
Renee Evans |
7/29/2004 |
Update or Other Action |
Recieved File from Anchorage. Review of the file indicates that work has been performed and BLM should be sampling soil stockpiled for bioremediation onsite. Will follow up with BLM project manager, Mike Sondergaard in Glenallen. File is limited and contains no letters or copy of ROD. |
Mike Jaynes |
1/25/2010 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 72679 name: BLM Maclaren Glacier Mine Dump Site |
Melody Debenham |
8/9/2013 |
Document, Report, or Work plan Review - other |
Approved the work plan for collecting multi-increment soil samples from the two landspread cells at the site to be analyzed for diesel range organics. |
Melody Debenham |
12/3/2013 |
Document, Report, or Work plan Review - other |
Approved the 2013 Maclaren Glacier Landspread Monitoring letter report describing multi-incremental sampling at the two landspread areas for diesel range organics. All results were below the applicable cleanup levels. |
Melody Debenham |
12/3/2013 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 72679 BLM Maclaren Glacier Mine Dump Site. |
Melody Debenham |
2/13/2015 |
Update or Other Action |
Provided Department of Natural Resources (landowner) update of site status. |
Melody Debenham |
12/7/2015 |
Cleanup Complete Determination Issued |
|
Melody Debenham |