Action Date |
Action |
Description |
DEC Staff |
8/4/1993 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). During removal of underground heating fuel tanks, contaminated soils encountered and removed from the excavation. |
Former Staff |
10/29/1993 |
Site Added to Database |
Diesel contamination. |
Former Staff |
12/6/1993 |
Site Ranked Using the AHRM |
Initial ranking. |
Former Staff |
5/17/2002 |
GIS Position Updated |
Heather Goldman supplied updated latitude and longitude based on a report prepared for the Kenai River Special Management Area. |
Heather Goldman |
8/21/2002 |
Update or Other Action |
Copy files and send to current contact: Betsy Walatka, USFS, 709 West 9th Street, Room 831D, Juneau, Alaska 99801; 586-8723. |
Donald Seagren |
5/25/2004 |
Update or Other Action |
File number assigned and entered into the Fileroom DB and CS DB. |
Alyce Hughey |
3/5/2007 |
Exposure Tracking Model Ranking |
|
Anne Marie Palmieri |
12/21/2007 |
Update or Other Action |
Summary report approved this date. Groundwater samples were collected from 6 wells. Only the one well closest to the spill area was contaminated. DRO concentrations were 2.19 and 4.48, for the respective sampling events. Additional monitoring requested as a trend cannot be established. Previous sample results are from 1997. |
Anne Marie Palmieri |
7/28/2015 |
Site Characterization Workplan Approved |
Staff approved a limited work plan for the monitoring of the current groundwater wells on this date. Work will be conducted in August 2015. |
Anne Marie Palmieri |
7/28/2015 |
Meeting or Teleconference Held |
Staff participated in a teleconference with USFS staff and their consultant regarding data gaps that are still present at the site. Given that the UST removal occurred in 1993 and contamination was left in the excavation hole, it is unknown if concentrations of contaminants above the cleanup levels are still present in the soil. DEC staff have recommended that the USFS recharacterize the soil contamination at the site. The USFS stated that they intend on removing the trailer (possibly this fall/winter) and hope to sell the property. Additional discussions will be held in a few weeks. |
Anne Marie Palmieri |
7/27/2016 |
Document, Report, or Work plan Review - other |
Groundwater sampling report reviewed this date. |
Anne Marie Palmieri |
9/2/2016 |
Update or Other Action |
On this date, DEC sent a letter to the USFS requesting action on a number of sites. For this site, DEC stated: The contamination at this site is the result of heating oil tanks used at a trailer park. The tanks were removed in 1993 but not all of the contamination at Trailer #4 could be removed as the trailer was still in place. Groundwater wells were installed and groundwater contamination was found to be present. Bioventing was conducted for a year. Groundwater samples were collected in 1998, 2007 and 2015. In 2016, the USFS requested site closure based on the 2015 groundwater samples in order to sell the property. In a letter stated July 27, 2016, DEC stated that the site could not be closed as soil contamination which remained after the 1993 removal hasn’t been addressed and there is an insufficient amount of groundwater data in order to determine a contaminant trend. As the existing analytical data is 20 years old and Trailer #4 has been removed, DEC requested that a site characterization work plan be submitted for review by December 31, 2016. |
Anne Marie Palmieri |
10/11/2017 |
Meeting or Teleconference Held |
DEC, EPA, and USFS met to discuss roles and responsibilities for each agency. Specific actions regarding this site were not discussed at this meeting. |
Anne Marie Palmieri |
2/14/2018 |
Meeting or Teleconference Held |
DEC, EPA, and USFS met to discuss roles and responsibilities for each agency. Specific actions regarding this site were not discussed at this meeting. |
Anne Marie Palmieri |
5/8/2019 |
Meeting or Teleconference Held |
DEC and the USFS met on this date to discuss many sites and how to move the sites forward in the cleanup process. A next meeting was scheduled for August. |
Anne Marie Palmieri |
8/12/2019 |
Meeting or Teleconference Held |
CS Staff met with the USFS to discuss site issues on this date. |
Anne Marie Palmieri |
10/8/2019 |
Meeting or Teleconference Held |
CS Staff met with the USFS to discuss general coordination issues on this date. |
Anne Marie Palmieri |
2/12/2020 |
Meeting or Teleconference Held |
CS Staff met with the USFS to discuss general coordination and site issues on this date. |
Anne Marie Palmieri |
4/24/2020 |
Site Characterization Workplan Approved |
CS staff approved a site characterization work plan on this date. |
Anne Marie Palmieri |
9/14/2020 |
Site Characterization Report Approved |
Staff approved a Site Characterization report on this date. The report documented limited soil and groundwater sampling which was conducted in June 2020. A copy of the letter is included in the documents section. |
Anne Marie Palmieri |
12/2/2021 |
Meeting or Teleconference Held |
DEC met with USFS to discuss potential for clean-up in 2022. A possible opportunity for using much of the contaminated soil in asphalt has come up. DEC provided general comments about what the forthcoming work plan should contain. |
Nick Waldo |