Site Report: Yute Air Terminal Dillingham

Site Name: Yute Air Terminal Dillingham
Address: Airport Runway R.O.W., Dillingham, AK 99576
File Number: 2540.38.009
Hazard ID: 1889
Status: Cleanup Complete - Institutional Controls
Staff: IC Unit, 9074655229 dec.icunit@alaska.gov
Latitude: 59.042023
Longitude: -158.514204
Horizontal Datum:NAD83

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Yute Air Alaska had a LUST. While pumping fuel from tanks to AGT, they suffered a 2,000 gallon spill. Snow plow hit 2" pipeline, discharging avgas to soils surface. Winter and 1,000 gallons recovered. Contaminated soils remain. Ground water contamination occurred. ESI has recently picked up the ball and is doing a re-visit of the site during the week of 8/15/95. Too late in the season to start remediation. Last staff assigned was Burger. Yute has filed for bankruptcy but entered into a COBC with ADEC to address remaining contamination.

Action Information

Action Date Action Description DEC Staff
9/1/1994 Update or Other Action (Old R:Base Action Code = RPL1 - Initiate Dialog with RP). Data from new site form. Ray Dronenburg
9/15/1994 Update or Other Action (Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Listed as CAPR on new site form. Plan approved. Ray Dronenburg
9/27/1994 Site Characterization Report Approved Shannon and Wilson report that defined the nature and extent of soil contamination at the site. The report did not adequately define groundwater conditions. Remediation alternatives were also proposed. Jim Frechione
9/30/1994 Update or Other Action (Old R:Base Action Code = RARR - Remedial Action Report Review (CS)). Plan approved. Listed as RI on new site form. Ray Dronenburg
10/15/1994 Update or Other Action (Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). Review a corrective action plan. Ray Dronenburg
1/3/1995 Site Added to Database Data entered from new site form from Ray. Ray Dronenburg
1/3/1995 Site Ranked Using the AHRM Initial ranking. Ray Dronenburg
1/20/1995 Meeting or Teleconference Held ADEC met with Yute Air to discuss remedial alternatives at the site. Yute agreed to excavate and transport the soil to William Johnson's (owner of Yute Air) for passive treatment under a plan prepared by Environmental Management Inc. Jim Frechione
8/3/1995 Update or Other Action EMI submit remedial action plan for excavation and removal of soil from the Yute Air site. Plan was revised in October 1995 to address ADEC comments. Jim Frechione
8/9/1995 Update or Other Action (Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Environmental Management, Inc. doing the remedial action plan - not approved. Ray Dronenburg
8/16/1995 Site Number Identifier Changed Changed workplan from "01" to "09". Combined data from two Reckeys into this one. Ray Dronenburg
8/30/1995 Update or Other Action (Old R:Base Action Code = CORR - Correspondence (General)). Sent a letter to the RP discussing the leachability of the material. Ray Dronenburg
8/30/1995 Update or Other Action (Old R:Base Action Code = RAU - Remedial Actions Underway (General)). TOTH suggested but not approved pending further investigation. Ray Dronenburg
9/20/1995 Site Ranked Using the AHRM Site reranked. Variables changed but the score remains the same. Bill Wright
10/24/1995 Cleanup Plan Approved (Old R:Base Action Code = RAPA - Remedial Action Plan Approval). Excavated 250 cubic yards on 9-10-96. Looking to treat remaining benzene exceedences in situ. Ray Dronenburg
4/30/1996 Site Ranked Using the AHRM Site reranked. Score still 60.48. Ray Dronenburg
12/12/1996 Update or Other Action EMI submit report on 1996 cleanup activity. Approximately 300 cubic yards was excavated and samples collected to confirm contamination remaining at the site. Jim Frechione
4/16/1998 Meeting or Teleconference Held ADEC met with DOTPF, Yute and EMI to discuss current site status. EMI proposed alternative cleanup levels using Method 3 approach. ADEC expressed concern about elevated GRO and benzene levels and lack of groundwater data. Jim Frechione
2/8/1999 Update or Other Action ADEC is informed Yute Air has filed Chapter 11 Bankruptcy. Jim Frechione
10/1/1999 Update or Other Action EMI submit Site Characterization workplan and proposed alternative cleanup levels. ADEC responded with comments on 10/05/1999. Jim Frechione
3/24/2000 Update or Other Action Site Characterization Report from Environmental Management Inc. with soil results from 3 sample locations and groundwater information from one monitoring well collected in October 1999. Jim Frechione
4/7/2000 Update or Other Action ADEC letter to EMI regarding October 1999 sampling data and the need to further characterize the site. Also, the proposed ACLs were not approved because a groundwater determination related to drinking water was not substantiated. Jim Frechione
9/30/2004 Meeting or Teleconference Held File review indicates Yute Air dissolved under Chapter 7. David Allen
6/21/2005 Update or Other Action Reviewed file and requested DOT and EMI to review their file for any additional information. Can NFRAP is no funds are available for site assessment and to follow up on stockpiled soils. Asked for input from DOT & Frechione on decision. Donald Seagren
11/2/2005 Update or Other Action Reviewed additional information from DOL. Sent letter informing RP on change of ADEC project manager. Also requested copies of all reports, workplans, correspondence since submittal of March 00 assessment report. If nothing has been done, required submittal, within 45 days of additional assessment workplan and timetable for completion of assessment. cleanup & remediation. Donald Seagren
11/8/2005 GIS Position Updated Using the Site Location Map from a Remedial Action Plan for Continued Clean-up of Yute Air Alaska Spill at Dillingham, from Environmental Management Incorporated, dated October 19, 1995, in conjunction with TopoZone Pro, entered the coordinates for this site. Metadata includes USGS Topo Map 1:63K, on a Medium Size Map, View Scale 1:24,000, Coordinate Datum NAD83. Moderate to High degree of confidence in accuracy of location. Alyce Hughey
12/12/2005 Update or Other Action Telephone call form Mr. Phillip Bingman. He has repossedd the hangar after the purchaser failed to complete the purchase. He will send his file for ADEC to copy so that we will have everything he has. He will be hiring a new consultant to develop a plan to bring the sit eto closure the summer of 06. Donald Seagren
3/15/2007 Exposure Tracking Model Ranking Donald Seagren
8/14/2007 Interim Removal Action Approved Approved work plan, dated 13 August 07, for additional interim cleanup and furthe site characterization, including soil treatment in an unlined cell on airport property. Coordinated review and approval with ADOT&PF, Airport Leasing. Donald Seagren
9/1/2008 Update or Other Action Status update- The stockpile located on Will Johnson's property has not been addressed since it was originally excavated in 1996 and the excavation remains open and filled with water. New lessee Newt Ball is interested in filling in the excavation as soon as possible and ADEC will meet with interested parties later this month to discuss the way forward. Bill O'Connell
9/24/2008 Meeting or Teleconference Held Meeting today with ADEC, ADOT&PF, EMI Consulting and interested stakeholders. please see attached meeting minutes for details. Bill O'Connell
11/24/2008 Meeting or Teleconference Held Meeting today with Will Johnson. Will will grant access to his property to remove the stockpile next year. The stockpile is currently on a liner, but the cover has degraded. Bill O'Connell
6/17/2009 Document, Report, or Work plan Review - other Reviewed work plan to sample water in excavation at former spill site. One sample will be collected from the 'pond' and analyzed for BTEX and PAHs. If sample results show no contamination, the excavation will be dewatered into a nearby ditch. Bill O'Connell
7/6/2009 Update or Other Action Contaminants were not detected in surface water samples from the 'pond'. Dewatering is tentatively scheduled for 7/9/09. Bill O'Connell
7/16/2009 Update or Other Action Site visit on 7/9/9. The former excavation has been dewatered and backfilled and will be turned into a parking lot in the near future. The soil stockpile was located and three samples were collected from test pits and analyzed for DRO, GRO, and BTEX. Results have not been received as of this date. Bill O'Connell
8/3/2009 Update or Other Action Received data from stockpile sampling. In the three test pits, DRO was detected up to 431 mg/kg, GRO was detected up to 2,120 mg/kg and benzene was detected up to 0.06 mg/kg, It is anticipated that the stockpile will be moved and possibly landspread in 2010. The monitoring well located at the former excavation was reportedly destroyed during backfilling operations. Bill O'Connell
6/20/2011 Cleanup Plan Approved Reviewed Contaminated Soil Remediation Work Plan for former Yute Air Dillingham. The 250 cy stockpile currently on private property will be removed and transported to the old Instrument Landing System site located northeast of the airport terminal buildings. The soil will be placed in a bermed, unlined landfarm and tilled weekly for 9 weeks. Performance samples will be collected in Summer 2010 to gauge the effectiveness of landfarming operations. The former stockpile location will be field screened and three soil samples collected to confirm the removal of all impacted soil. Bill O'Connell
6/27/2011 Site Visit Site visit and mobilization meeting with contractors in preparation for landfarming impacted soil Bill O'Connell
12/2/2011 Document, Report, or Work plan Review - other Reviewed Draft Contaminated Soil Remediation Report, Former Yute Air Terminal Dillingham. This report details the removal and relocation of a stockpile of avgas contaminated soil from private property to a landfarm on ADOT&PF Property near the Dillingham airport. Initial estimates indicated the stockpile consisted of approximately 250 cubic yards of soil, however once the removal had been completed, the total was estimated at 370 cy. The soil was moved to a bermed landfarm located at the old ADOT&PF ILS site and the landfarm was tilled on 7 occasions in 2011. It is anticipated that follow up sampling will be conducted at the landfarm in 2012. The stockpile was found to have several layers of liner material present at various depths below the stockpile, so soil was removed to approximately one foot below grade in some areas. The northwest corner of the stockpile was saturated which caused difficulty for the heavy equipment working at the site, so some soil was left above grade in this location. After the stockpile had been removed, confirmation soil samples were collected from below the former stockpile liner from the locations with the highest field screening results. DRO was detected up to 819 mg/kg in a duplicate sample, the primary sample contained DRO at 379 mg/kg. Benzene was detected up to 0.182 mg/kg. Because hydrocarbon contamination had apparently migrated to below the liner, a series of test holes were augered to 6 feet bgs to evaluate the potential depth of the residual contamination. Field screening conducted on soil samples collected every two feet to this depth indicate hydrocarbon contamination is present to approximately 4 feet bgs in discrete locations, but is significantly lower at the 6 foot interval. Bill O'Connell
1/11/2012 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 72867 Fuel Spill. Bill O'Connell
3/22/2012 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 72867 Fuel Spill. Bill O'Connell
6/17/2013 Document, Report, or Work plan Review - other Reviewed Contaminated Soil Remediation Report for Yute Air Terminal, Dillingham. 2012 activities included tilling of the landfarmed soil at the Old ILS Site, landfarm sampling, and the delivery of additional fill to the Johnson property from where the stockpile had been removed. The landfarm was tilled four times between May and August 2012. In September 2012 the landfarm was divided into six cells and 25 field screening samples were collected, four from each cell, plus one additional sample. The sample with the highest PID reading from each cell was submitted for laboratory analysis for DRO, GRO,RRO, and BTEX and the sample with the highest PID reading was also analyzed for PAHs. An attempt was made to sample the drinking water well at the Johnson property, however the water system was not operating, so no sample was collected. Soil samples collected from the landfarm did not contain contaminants above cleanup levels. Bill O'Connell
8/1/2013 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 72867 Fuel Spill. Bill O'Connell
8/1/2013 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 72867 name: Fuel Spill Bill O'Connell
8/1/2013 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 79489 name: Former Stockpile Location Bill O'Connell
12/16/2013 Cleanup Complete Determination Issued The Alaska Department of Environmental Conservation, Contaminated Sites Program (ADEC) has completed a review of the environmental records associated with the Yute Air Terminal Dillingham, located on Lot 10, Block 500A of the Dillingham Airport in Dillingham Alaska. . Based on the information provided to date, it has been determined that the contaminant concentrations remaining on site do not pose an unacceptable risk to human health or the environment and no further remedial action will be required as long as the site is in compliance with established institutional controls. Bill O'Connell
12/16/2013 Institutional Control Record Established Institutional Controls established and entered into the database. Bill O'Connell
6/17/2024 Institutional Control Compliance Review IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in five years’ time. Gaige Robinson

Contaminant Information

Name Level Description Media Comments
GRO Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil
Benzene Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil
Benzene > Table C Groundwater

Control Type

Type Details
Signed CS Determination

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.
Groundwater Use Restrictions Groundwater is not to be used as a drinking water source at the property