Skip to content Skip to content

Site Report: Fort Wainwright (2P) Bldg. 1060

Site Name: Fort Wainwright (2P) Bldg. 1060
Address: Apple Street, Fort Wainwright, AK 99703
File Number: 108.38.067
Hazard ID: 1944
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 64.842583
Longitude: -147.611070
Horizontal Datum:

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

UST 208 contains 1,000 gallon diesel (was replaced in 7/91). During removal of old tank the fill pipe separated releasing 20 gallons of diesel. Soil samples taken from bottom of excavation resulted in DRPH between 35 and 91 ppm. An additional cubic yard of soil was excavated from area near building before installation of new UST. Consultant for COE on behalf of Army is CH2MHILL for screening site in summer 1993. (rpltr7) This site was reviewed on January 12, 2016. The site was formerly listed in Appendix A of the Two Party Agreement at Fort Wainwright. DEC is reviewing the Appendix A site list and has requested the Army to update the list based on confirmed cleanup complete/closure status of the original sites.

Action Information

Action Date Action Description DEC Staff
4/14/1993 Update or Other Action (Old R:Base Action Code = RELR - Release Investigation Review (LUST)). Reviewed COECON's workplan and wrote letter with comments and recommendations. Involves UST 208. 1,000 gallon diesel replaced 7/91 with similar UST, used for storage for standby generator at communication Center. During excavation, fill pipe separated from UST, approximately 20 gallons diesel spilled. Highest DRPH concentration in soil 390 ppm from pipe fitted at building wall. Eleanor Hung
6/14/1993 Update or Other Action (Old R:Base Action Code = RECN - Site Reconnaissance (CS)). ADEC Thomas and Hung inspected site. Ben Thomas
6/30/1993 Site Added to Database Diesel. Former Staff
6/30/1993 Site Ranked Using the AHRM Insufficient data to score. Former Staff
8/1/1993 Leaking Underground Storage Tank Corrective Action Underway A 1,000 gallon diesel UST was excavated and replaced by a new UST 1991. Approximately 10 cubic yards contaminated soil thermally treated summer 1993. RI in progress discovered subsurface and ground water contamination compounded by historical discovery that a dry cleaning operation was located near the site some years ago. Eleanor Hung
8/25/1993 Site Ranked Using the AHRM Reranked. Former Staff
10/14/1993 Site Ranked Using the AHRM Reranked using new modifications to AHRM. Former Staff
1/12/1994 Meeting or Teleconference Held RI indicated high levels hydrocarbons coming across Gaffney Road. Small amounts of chlorinated hydrocarbons from former dry cleaning establishment. Many MWs installed by 3 different RPCONs surrounding site indicate contamination coming from other sources in all directions. Inoperable pipeline exists nearby. Plans include treatability study around UST and further RI involving search for contributing sources. Eleanor Hung
3/3/1994 Update or Other Action (Old R:Base Action Code = NFA - No Further Action Required (CERCLA)). Closure letter sent this date due to referral to CERCLA process -3 party- upgradient contaminant plume. Ronan Short
3/3/1994 Site Closure Approved Site is referred to OU5 in 3 party agreement under CERCLA. Closure is recommended under Alaska UST Regulations. Letter this date to Army. Ronan Short
5/16/1994 Update or Other Action (Old R:Base Action Code = RPL2 - Site Information Request Letter). Sent PRP-CS Database Notification Letter to Cristal Fosbrook requesting update/confirmation of information concerning the contaminated site. Jeff Peterson
1/25/1996 Update or Other Action Received Building 1060 Treatability Study Annual Report (July 1994 to July 1995). Ronan Short
10/24/2006 Update or Other Action Changed file name from FTWW to Fort Wainwright per Project Manager. April Woolery
2/4/2011 Document, Report, or Work plan Review - other Technical Memorandum, Draft Doyon Support at Building 1060 and Building 1054 After Action Report, 28 January 2011 reviewed and have no comment. Please note though, DEC has no record of reviewing the Building 1054 Construction Support Work Plan Addendum. Debra Caillouet
4/11/2011 Document, Report, or Work plan Review - other Technical Memorandum, Doyon Support at Building 1060 and Building 1054 After Action Report, April 2011. The report documents field screening during utility construction at both sites. No contamination was identified at these limited areas. Debra Caillouet
1/12/2016 Update or Other Action This site was reviewed on January 12, 2016. The site was formerly listed in Appendix A of the Two Party Agreement at Fort Wainwright. DEC is reviewing the Appendix A site list and has requested the Army to update the list based on confirmed cleanup complete/closure status of the original sites. Dennis Shepard

Contaminant Information

Name Level Description Media Comments
For more information about this site, contact DEC at (907) 465-5390.

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

There are no documents for this site report.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close