Action Date |
Action |
Description |
DEC Staff |
7/30/2004 |
Site Added to Database |
Petroleum contamination. |
Deborah Williams |
7/30/2004 |
Update or Other Action |
DOD ranking of High. |
Deborah Williams |
8/30/2004 |
Meeting or Teleconference Held |
11th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
8/31/2004 |
Update or Other Action |
The USAF proposed the remedy of No Further Action (NFA) for both the Control Tower Drum Storage Area (CTDSA) and CTDSA South sites in their July 2004 Proposed Plan. DEC recommended administratively closing the original CTDSA site since it has been encompassed by the CTDSA South site. DEC recommended further remedial investigation for the CTDSA South site, and will be working with the USAF on the details of this recommendation. |
Colin Craven |
10/21/2004 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/5/2004 |
Meeting or Teleconference Held |
12th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
1/28/2005 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
1/28/2005 |
Meeting or Teleconference Held |
13th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
4/19/2005 |
Meeting or Teleconference Held |
14th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
4/26/2005 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
5/13/2005 |
Meeting or Teleconference Held |
15th Galena Technical Project Team meeting in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
6/9/2005 |
Meeting or Teleconference Held |
16th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
7/29/2005 |
GIS Position Updated |
Updated the location information in the database. |
Colin Craven |
8/30/2005 |
Meeting or Teleconference Held |
17th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
9/2/2005 |
Update or Other Action |
DEC commented on the draft final Proposed Plan that recommended site closure for five Installation Restoration Program sites. Since further site characterization is planned for the CTDSA South site, DEC could not concur with the proposed remedy of site closure. CTDSA South will be removed from the Proposed Plan since the remaining four sites were agreed to as ready for closure. This has no effect on the original CTDSA site (encompassed by the subsequent CTDSA South site), which was still recommended for administrative closure. |
Colin Craven |
10/12/2005 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/20/2005 |
Meeting or Teleconference Held |
18th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
1/3/2006 |
Update or Other Action |
DEC received the draft Remedial Investigation and Feasibility Study. The Air Force is proposing to install new monitoring wells to see if any trichloroethene contamination remains. DEC comments will be submitted in February. |
Colin Craven |
1/26/2006 |
Meeting or Teleconference Held |
19th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
3/7/2006 |
Update or Other Action |
Due to the late inclusion of this site into the Remedial Investigation, no risk assessment or feasibility study was conducted. The Air Force has proposed long term groundwater monitoring (LTM) and land use controls (LUCs) until residual contamination has attenuated to Method 2 cleanup levels. DEC agrees that LTM and LUCs will comprise minimum components of a remedy for the site if the presence of groundwater contamination is confirmed in future site investigations, but can not agree to the adequacy of this remedy until the additional investigation is conducted. If future site investigation finds no contamination above Method 2 cleanup levels, DEC will support site closure. |
Colin Craven |
3/14/2006 |
Meeting or Teleconference Held |
20th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
6/1/2006 |
Site Characterization Workplan Approved |
The Air Force and DEC came to agreement on a work plan for monitoring well installation and sampling that will serve to fill data gaps identified during the recent remedial investigation. Two long-screened monitoring wells will be installed to test whether a groundwater plume of trichloroethene (TCE) has resulted from former drum storage and waste disposal in the vicinity. The wells will be placed downgradient of former monitoring well 13-MW-38, where previously TCE was detected above groundwater cleanup levels, and downgradient of TCE contamination found in soil borings. |
Colin Craven |
6/20/2006 |
Meeting or Teleconference Held |
21st Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/6/2006 |
Meeting or Teleconference Held |
22nd Galena Technical Project Team meeting in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/17/2006 |
Meeting or Teleconference Held |
23rd Galena Technical Project Team meeting in Fairbanks. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/17/2006 |
Update or Other Action |
Two monitoring wells were installed downgradient of a destroyed monitoring well and soil borings that had previously documented trichloroethene (TCE) contamination. Samples from the new monitoring wells were either non detect for all volatile organic compounds (VOCs), or with VOC detections under the groundwater cleanup levels. While no samples detected TCE, cis-1,2-dichloroethene, a breakdown compound of TCE, was detected in one sample at low concentrations. |
Colin Craven |
1/18/2007 |
Meeting or Teleconference Held |
24th Galena Technical Project Team meeting in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
4/1/2010 |
Document, Report, or Work plan Review - other |
QAPP Review |
Fred Vreeman |
8/1/2010 |
Update or Other Action |
QAPP Approved |
Fred Vreeman |
4/15/2014 |
Meeting or Teleconference Held |
A Technical Project Team meeting was held to meet the Air Force newly selected Performance Based Remediation Contractor for Galena. The 6.5 year remediation contract was awarded to Parsons Governmental Services (Parsons). The contract includes completing the risk assessments, remediation feasibility studies, proposed plans and record of decision for remedial investigations at 10 Sites (FT001, SS006, SS013, SS015, SS019, SS018/AOC023, SS022/B400, DP023/DSWD, OW024/OWS1833, and SS025). |
Monte Garroutte |
10/26/2016 |
Meeting or Teleconference Held |
A restoration Advisory board meeting was held in Galena Alaska to discuss the general and specific status of site investigations and cleanup at Galena. |
Dennis Shepard |
3/23/2018 |
Document, Report, or Work plan Review - other |
REPORT RECEIVED: Draft Site Inspection Report for Site SS013, Control Tower Drum Storage Area (CTDSA) South, Former Galena FOL, Alaska |
Jamie McKellar |
4/9/2018 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 72924 name: Galena AFS - CTDSA/CTDSA South SS013 |
Jamie McKellar |
4/16/2018 |
Document, Report, or Work plan Review - other |
REPORT REVIEW: Draft Site Inspection Report for Site SS013, Control Tower Drum Storage Area (CTDSA) South, Former Galena FOL, Alaska. Prepared by Parsons. Dated March 2018. DEC sent a letter advising that Site SS013 is eligible for a Cleanup Complete determination, which will be addressed under separate cover. DEC requested that Parsons make changes to the Conclusions section of the report and submit a finalized version of the report. |
Jamie McKellar |
4/20/2018 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: Final Site Inspection Report for Site SS013, Control Tower Drum Storage Area South, Former Galena Forward Operating Location, Alaska. Prepared by Parsons. Dated April 2018. |
Jamie McKellar |
5/30/2018 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 72924 Galena AFS - CTDSA/CTDSA South SS013. |
Jamie McKellar |
8/13/2018 |
Cleanup Complete Determination Issued |
Based on the information provided to date, it has been determined that the contaminant concentrations remaining on site do not pose an unacceptable risk to human health or the environment and no further remedial action will be required unless new information becomes available that indicates residual contaminants may pose an unacceptable risk. |
Dennis Shepard |
8/13/2018 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 72924 Galena AFS - CTDSA/CTDSA South SS013. |
Dennis Shepard |