Action Date |
Action |
Description |
DEC Staff |
8/2/2004 |
Site Added to Database |
Chlorinated solvent contamination. |
Deborah Williams |
8/2/2004 |
Update or Other Action |
DOD ranking is High. |
Deborah Williams |
8/30/2004 |
Meeting or Teleconference Held |
11th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/21/2004 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/5/2004 |
Meeting or Teleconference Held |
12th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/19/2004 |
Meeting or Teleconference Held |
Attended a week long meeting in San Antonio, Texas to participate in the formulation of an outline for the Galena Airport and Campion Air Station Remedial Investigation/Feasibility Study (RI/FS). |
Colin Craven |
1/12/2005 |
Update or Other Action |
Submitted comments to the Air Force to finalize the 2004 Site Recommendations for the upcoming Remedial Investigation report. The 2004 Site Recommendations were produced during the November 2004 meetings in San Antonio, Texas. |
Colin Craven |
1/28/2005 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
1/28/2005 |
Meeting or Teleconference Held |
13th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
3/18/2005 |
Update or Other Action |
Comment resolution between DEC and the Air Force has been achieved on the draft Human Health Risk Assessment Work Plan for the Galena Airport and Campion Air Station. The Air Force contractors are currently finalizing the work plan. |
Colin Craven |
4/19/2005 |
Meeting or Teleconference Held |
14th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
4/26/2005 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
5/13/2005 |
Meeting or Teleconference Held |
15th Galena Technical Project Team meeting in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
5/25/2005 |
Update or Other Action |
Received the full analytical data package from the 2003 - 2004 sampling of the drinking water well that serves the base. This sampling was conducted by the Air Force to demonstrate that groundwater contamination from this IRP site has not contaminated the base drinking water well. Sampling was conducted monthly for volatile organic compounds, and only toluene and methyl ethyl ketone were detected once at concentrations three orders of magnitudes under the cleanup level. Sampling of the drinking water system was conducted at a point before the air stripper treats the water. Based on these results, sampling of the drinking water well has returned to the routine public water system testing program. |
Colin Craven |
6/9/2005 |
Meeting or Teleconference Held |
16th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
7/20/2005 |
GIS Position Updated |
Updated the site location; interpolated from USGS quadrangle map. |
Colin Craven |
8/30/2005 |
Meeting or Teleconference Held |
17th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/12/2005 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/20/2005 |
Meeting or Teleconference Held |
18th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
1/3/2006 |
Update or Other Action |
DEC received the draft Remedial Investigation and Feasibility Study. The Air Force is proposing no active remediation, but instead long term monitoring and land use controls. DEC comments will be submitted in February. |
Colin Craven |
1/26/2006 |
Meeting or Teleconference Held |
19th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
3/7/2006 |
Update or Other Action |
The draft risk assessment found unacceptable risk at this site due to the potential for vapor intrusion of TCE if occupied buildings are placed over the groundwater contamination in the future. The Air Force proposed long term monitoring and land use controls as the remedy. DEC requested that the remedy include further study to elucidate the natural degradation mechanisms that have been effective in stabilizing the TCE plume, which are currently unclear. Furthermore, the full adequacy of this remedy will depend on comment resolution for the draft risk assessment. |
Colin Craven |
3/14/2006 |
Meeting or Teleconference Held |
20th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
6/20/2006 |
Meeting or Teleconference Held |
21st Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/6/2006 |
Meeting or Teleconference Held |
22nd Galena Technical Project Team meeting in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/17/2006 |
Meeting or Teleconference Held |
23rd Galena Technical Project Team meeting in Fairbanks. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
1/18/2007 |
Meeting or Teleconference Held |
24th Galena Technical Project Team meeting in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
1/23/2007 |
Exposure Tracking Model Ranking |
Baseline ranking completed. |
Colin Craven |
9/1/2010 |
Site Visit |
Site Visit |
Amanda Loomis |
6/9/2011 |
Site Visit |
Site Visit |
Fred Vreeman |
6/15/2011 |
Document, Report, or Work plan Review - other |
SC workplan reviewed, comments sent to USAF |
Fred Vreeman |
6/15/2011 |
Conceptual Site Model Submitted |
SS019 CSM submitted |
Fred Vreeman |
6/15/2011 |
Conceptual Site Model Submitted |
SS006 CSM submitted |
Fred Vreeman |
9/9/2011 |
Update or Other Action |
SS006 and SS019 Response to Comment Summary replies sent to USAF |
Fred Vreeman |
9/29/2011 |
Update or Other Action |
Conditional approval of SC Workplan. TCE sampling accepted as screening level only. |
Dennis Shepard |
10/20/2011 |
Meeting or Teleconference Held |
TRIAD meeting held. Low levels of TCE reported at 22 feet below ground surface and deeper in northeast of the site. Two stepouts were approved by DEC. |
Dennis Shepard |
5/17/2012 |
Document, Report, or Work plan Review - other |
DEC received a Draft Remedial Investigation results report for the Site. |
Dennis Shepard |
10/10/2012 |
Update or Other Action |
DEC sent a letter to EPA concerning Risk Assessments (RAs) for Remedial Investigation Sites at Galena. DEC has asked EPA to provide an opinion on risk assessment issues requiring resolution for the remedial investigation sites at Galena. Specific issues of concern are: determination of risk assessment source area and calculation of exposure point concentrations |
Dennis Shepard |
4/30/2013 |
CERCLA RI Report Approved |
DEC approved the Remedial Investigation results report for Site SS006/SS019, Former Galena Forward Operating Location (FOL), Galena, Alaska. |
Dennis Shepard |
1/14/2014 |
Update or Other Action |
By Agreement between the Air Force and DEC, TCE contamination at site S1850 is being investigated as part of the investigations at Sites SS006 and SS019 |
Dennis Shepard |
1/14/2014 |
CERCLA RI Plan Approved |
The Alaska Department of Environmental Conservation (DEC) received a Draft 2013 Supplemental Remedial Investigation (RI) and Site Characterization (SC) Sampling Plan on May 24, 2013. The sampling plan presents step out sample locations and analytical protocols for supplemental remedial investigation at six Sites (B400, OWS1833, DSWD, SS006/SS019, and FT001). DEC provided review comments for the draft sampling plan on July 3, 2013. A response to comments (RTC) and a Draft Final version of the plan was submitted on July 25, 2013. DEC provided comments for the Draft Final on July 19, 2013. A comment resolution teleconference meeting was held on July 19, 2013 to resolve the final issues for the sampling plan. All issues were resolved in the meeting and DEC approval was given to finalize the plan. Final version of the sampling plan was received on December 16, 2013 and approval of the work plan was given on January 14, 2014. |
Monte Garroutte |
4/15/2014 |
Meeting or Teleconference Held |
A Technical Project Team meeting was held to meet the Air Force newly selected Performance Based Remediation Contractor for Galena. The 6.5 year remediation contract was awarded to Parsons Governmental Services (Parsons). The contract includes completing the risk assessments, remediation feasibility studies, proposed plans and record of decision for remedial investigations at 10 Sites (FT001, SS006, SS013, SS015, SS019, SS018/AOC023, SS022/B400, DP023/DSWD, OW024/OWS1833, and SS025). |
Monte Garroutte |
11/5/2014 |
Institutional Control Record Established |
Institutional Controls established and entered into the database. |
Dennis Shepard |
4/10/2015 |
Document, Report, or Work plan Review - other |
DEC approved the Soil Vapor Extraction (SVE), Pilot Test Work Plan, Former Galena Forward Operating Location (FOL), Alaska. The plan provides for installing pilot test SVE systems for 4 site in Galena (OW024, SS022, SS025 and SS019 are included).
|
Dennis Shepard |
5/21/2015 |
CERCLA RI Report Approved |
DEC approved the 2014 Supplemental Remedial Investigation (RI) Report, Trichloroethene (TCE) Area (Site SS006) and Building 1700 – Refueler Maintenance Shop (Site SS019), Former Galena Forward Operating Location (FOL), Alaska. |
Dennis Shepard |
7/22/2016 |
Document, Report, or Work plan Review - other |
DEC approved the Soil Vapor Extraction (SVE) Pilot Test Construction Completion Report, July 2016, Former Galena Forward Operating Location (FOL), Alaska. The report includes start up concentrations evaluation of the SS019 SVE system. |
Dennis Shepard |
10/26/2016 |
Meeting or Teleconference Held |
A restoration Advisory board meeting was held in Galena Alaska to discuss the general and specific status of site investigations and cleanup at Galena. |
Dennis Shepard |
1/19/2018 |
Meeting or Teleconference Held |
DEC participated in an on board comment resolution teleconference call to discuss the Air Force responses to comments for the draft Feasibility Study (FS) for Sites SS006/SS019, Former Galena Forward Operation Location. |
Dennis Shepard |
1/29/2018 |
CERCLA FS |
DEC approved the Feasibility Study report for Trichloroethene (TCE) Area (Site SS006)/ Building 1700 – Refueler Maintenance Shop (Site SS019), Former Galena Forward Operation Location, Alaska (January 2018). The FS identified the preferred remedial alternative for the SS006 and SS019 sites. Common elements included: Soil vapor extraction (SVE) and bioventing to target TCE and petroleum contamination in soil, MNA for remediation of groundwater, and LUCs to mitigate potential exposures of human receptors to soil and groundwater until cleanup levels are achieved. For SS006, excavation of PAH contaminated soil and In situ treatment of groundwater using Enhanced Anaerobic Bioremediation/Enhanced Biogeochemical Transformation is included. |
Dennis Shepard |
4/11/2018 |
Meeting or Teleconference Held |
PUBLIC MEETING: A public meeting was held at the Larson Charlie Hall in Galena, Alaska on April 11, 2018. The purpose of the meeting was to discuss the Proposed Plan for TCE Areas, Building 1845 (Site SS006) and Building 1700 Refueler Maintenance Shop (Site SS019). Twenty-six people attended the meeting, which was recorded and transcribed by a court reporter. |
Jamie McKellar |
6/18/2018 |
Update or Other Action |
Document approval: Summary of Proposed Plan Public Meeting, dated April 11, 2018. |
Jamie McKellar |
6/26/2018 |
Update or Other Action |
REPORT RECEIVED: Draft Remedial Design and Remedial Action Work Plan for Trichloroethene (TCE) Area (Site SS006)/Building 1700 – Refueler Maintenance Shop (Site SS019), Former Galena Forward Operating Location, Alaska. Prepared by Parsons. Dated June 2018. |
Jamie McKellar |
7/5/2018 |
CERCLA ROD Approved |
DEC approved the Final Record of Decision for Trichloroethene (TCE) Area (Site SS006)/Building 1700 Refueler Maintenance Shop (Site SS019), Performance-Based Remediation. |
Dennis Shepard |
7/23/2018 |
Document, Report, or Work plan Review - other |
DEC provided comments for the draft CERCLA Remedial Design and Remedial Action Work Plan for Trichloroethene (TCE) Area (Site SS006)/Building 1700 – Refueler Maintenance Shop (Site SS019), Performance-Based Remediation at Former Galena Forward Operating Location, Alaska (June 2018). |
Dennis Shepard |
8/6/2018 |
CERCLA Remedial Design/Remedial Action Plan Approved |
DEC received the final approvedRemedial Design and Remedial Action Work Plan for Trichloroethene (TCE) Area (Site SS006)/Building 1700-Refueler Maintenance Shop (Site SS019), Performance-Based Remediation. |
Dennis Shepard |
8/8/2018 |
Site Visit |
DEC conducted a site visit at the Former Forward Operating Location in Galena, AK on August 8-9, 2018. A photo log is available in DEC's electronic file. |
Jamie McKellar |
10/29/2018 |
Site Visit |
On October 23, 2018, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit with inspections of each site was conducted the following day (10/24/2018) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
4/5/2019 |
Site Visit |
On April 2, 2019, DEC staff participated in a Technical Project Team meeting with representatives from USAF, Parsons, CH2M, and ADOT. The TPT meeting was held at the Fairbanks DEC office. On April 3-4, 2019, DEC staff traveled to Galena to participate in meetings with the City Mayor & RAB chair to discuss community concerns about site cleanup; a Proposed Plan meeting for Site DP023, and a community regional advisory board (RAB) meeting to discuss fieldwork completed during the 2018 field season and upcoming 2019 fieldwork. Site visits were also conducted. |
Jamie McKellar |
10/23/2019 |
Meeting or Teleconference Held |
On October 22, 2019, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit was conducted the following day (10/23/2019) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
10/30/2019 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: Final 2018 Performance Monitoring Report for Sites CPL006, CSS002, OW024, SS006/SS019, SS014/SS017, SS015, SS016, SS018, SS022, SS025, ST009, ST010, and FT001, Former Galena Forward Operating Location, Alaska (Parsons, October 2019) |
Jamie McKellar |
2/26/2020 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: Final Construction Completion Report, Trichloroethene (TCE) Area (Site SS006)/Building 1700 – Refueler Maintenance Shop (Site SS019), [Parsons, February 2020] |
Jamie McKellar |
9/4/2020 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 78115 TCE and Waste Injection. |
Jamie McKellar |
4/21/2021 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: 2020 Performance Monitoring Report for Sites CPL006, CSS002, SS006/SS019, SS017, SS015, SS016, SS018, SS022, ST009, ST010, and FT001, Former Galena Forward Operating Location, Alaska (Parsons, April 2021) |
Jamie McKellar |
8/23/2023 |
Document, Report, or Work plan Review - other |
REPORT APPROVED: Final Remedial Process Optimization Evaluation Report, Former Galena Forward Operating Location, Alaska (Parsons, June 2023) |
Jamie McKellar |
11/15/2023 |
Site Visit |
DEC, DOT, USAF, and contractors met at the Fairbanks DEC office on May 2, 2023 for a Technical Project Team meeting. The following day a site visit and Regional Advisory Board (RAB) meeting were held in Galena. Meeting minutes for the TPT and RAB meetings were approved on November 15, 2023. |
Jamie McKellar |
4/23/2024 |
Meeting or Teleconference Held |
CS staff participated in the biannual Technical Project Team (TPT) meeting with representatives from USAF BRAC, Parsons, Jacobs/CH2M Hill, and EA Engineering. The meeting was held at the EA Engineering office in Anchorage, AK. |
Jamie McKellar |
6/27/2024 |
Document, Report, or Work plan Review - other |
DEC approved multiple data quality assessment reports for soil, soil vapor, groundwater, and sediment. Reports were submitted by Parsons and CH2M/Jacobs. Approval letter is dated 6/27/2024. |
Jamie McKellar |
7/16/2024 |
Document, Report, or Work plan Review - other |
DEC approved the Final 2023 Soil Vapor Extraction (SVE) Remediation System Annual Report. The document describes the results of the operations, monitoring, and maintenance (OM&M) activities from October 2022 through September 2023 for five SVE systems at the Former Galena Forward Operating Location. |
Tim Sharp |