Action Date |
Action |
Description |
DEC Staff |
7/17/1997 |
Update or Other Action |
Heating oil tank releases have contaminated groundwater at this site. CSRP staff reviewed the file and in a letter dated July 17, 1997 requested 1) submittal of a work plan to include sampling existing groundwater monitoring wells, 2) sampling the on-site drinking water well for contamination on a quarterly basis as requested by the Department's Drinking Water Program staff, Keven Kleweno, in his letter also of July 17, 1997, and 3) proposing and constructing additional groundwater monitoring wells so that the downgradient extent of groundwater contamination is defined. |
Eileen Olson |
9/19/1997 |
Update or Other Action |
ADEC letter sent approving "Disposal Plan for Alaskan Village Mobile Home Park" regarding stockpile soils. Plan is dated 9/19/1997 and was also received on that date. |
Eileen Olson |
10/16/1998 |
Update or Other Action |
ADEC letter in response to request for excavation and disposal of soils: Subject "Proposed regulations 18 AAC 75 and your request for approval to excavate, transport and dispose of soils at the Alaskan Village Mobile Home Park". |
Eileen Olson |
8/9/1999 |
Update or Other Action |
Sent letter requesting groundwater monitoring and additional investigation. |
Eileen Olson |
12/20/1999 |
Site Added to Database |
Diesel contamination from heating oil systems and individual tanks. |
Eileen Olson |
4/7/2000 |
Site Characterization Workplan Approved |
Received and approved a plan for investigation by Shannon and Wilson for the western portion of the property. |
Eileen Olson |
4/25/2000 |
Site Ranked Using the AHRM |
Changed ranking: checked multiple sources. Changed surface water environment to 2 from 0, as Chester Creek runs through the site. |
Eileen Olson |
5/24/2000 |
Notice of Violation |
Issued a "Notice of Violation and Pending Assumption" notifying Avanti Corp. and Pete Zamarillo that the State may take action without further notice after June 24, 2000, based on the inadequacy of response actions. |
Eileen Olson |
6/14/2000 |
Update or Other Action |
Conditional approval letter for "Work Plan for Alaskan Villages Mobile Home Park" dated and received on June 13, 2000. |
Eileen Olson |
9/18/2000 |
Update or Other Action |
Approved a work plan of the same date proposing investigation of soil and groundwater along the proposed route of a future re-routed Chester Creek, as shown on a figure attached to the work plan. Eighteen test pit locations were noted, of which approximately eight will be selected prior to work beginning on September 19, 2000. |
Eileen Olson |
9/22/2000 |
Update or Other Action |
Site visit to observe investigatory test pit excavation along the proposed realignment of Chester Creek. Diesel-contaminated soil and groundwater was discovered in the area south of the current Chester Creek alignment, which was not previously known to be contaminated. Piping was found which appears to be part of a heating fuel distribution system. |
Eileen Olson |
10/4/2000 |
Update or Other Action |
Media contact by Channel 11 TV regarding status of contamination. Interview done which aired on evening news. |
Eileen Olson |
10/6/2000 |
Meeting or Teleconference Held |
Site visit; met with consultants and representatives for prospective site developer, observed test pit excavation including discovery of contamination associated with underground fuel piping along the southern boundary of the eastern portion of the property. |
Eileen Olson |
10/12/2000 |
Meeting or Teleconference Held |
1 Hr. meeting with DOWL Engineers regarding site characterization associated with prospective occupancy of an approximately 30 acre parcel by Wal-Mart. Same day: 2-1/2 hour meeting with representative of Neeser Corp., attorney Robert Reges, and Terrasat, to discuss a proposed prospective purchaser's agreement (PPA). |
Eileen Olson |
11/22/2000 |
Update or Other Action |
ADEC letter advising prospective developer that CS Program had not received a scope of work for the 68-acre parcel that comprises the site. The scope of work was to be incorporated into the COBC under development, as an attachment. |
Eileen Olson |
11/24/2000 |
Update or Other Action |
Staff prepared and submitted to the AGO a "Referral of Informal Cost Recovery" memo for this site. |
Eileen Olson |
12/20/2000 |
Update or Other Action |
Received "Scope of Work
Investigation and Remediation of Alaskan Village Mobile Home Park" dated same. |
Eileen Olson |
12/21/2000 |
Update or Other Action |
ADEC letter approving “Scope of Work, Investigation and Remediation of Alaskan Village Mobile Home Park". |
Eileen Olson |
4/5/2001 |
Update or Other Action |
Conditionally approved “Work Plan, Release Investigation of Alaskan Village Mobile Home Park” and “Work Plan, Design Investigation for Remediation System at Alaskan Village Mobile Home Park,” both prepared by Terrasat and dated March 27, 2001 |
Eileen Olson |
4/30/2001 |
Update or Other Action |
Received “Work Plan, Release Investigation of Alaskan Village Mobile Home Park” and “Work Plan, Design Investigation for Remediation System at Alaskan Village Mobile Home Park,” both dated March 27th, 2001, and “Environmental Investigation and Remediation Status Report” dated January 18, 2001. |
Eileen Olson |
7/20/2001 |
Update or Other Action |
Received workplan dated 7/20/2001 |
Eileen Olson |
8/7/2001 |
Update or Other Action |
ADEC letter: Approval of “Work Plan, Release Investigation of Alaskan Village Mobile Home Park” |
Eileen Olson |
10/2/2001 |
Update or Other Action |
ADEC letter: Approval of “Work Plan for Alaskan Village: Stockpile Sampling” |
Eileen Olson |
11/6/2001 |
Update or Other Action |
ADEC letter prepared at request of MOA Planning Dept. which is considering western portion of site for a school site, subject: "Status of western portion of Alaskan Village Mobile Home Park property" |
Eileen Olson |
1/8/2002 |
Update or Other Action |
ADEC received report on January 9, 2002 "Underground Storage Tank Removals at Lots 79, 35, 25 and 44, Alaskan Village Mobile Home Park...January 8, 2002." |
Eileen Olson |
2/12/2002 |
Update or Other Action |
ADEC received report on 2/14/2002 "Remediation and Removal of Waste Oil Contaminated Soil at the Alaskan Village Mobile Home Park, Volume I - Summary Report...February 12, 2002." |
Eileen Olson |
2/13/2002 |
Update or Other Action |
ADEC received report on 2/14/2002 by TERRASAT "Supplemental Release Investigation and Remedial Action of Two Former UST Sites...February 13, 2002." |
Eileen Olson |
3/4/2002 |
Update or Other Action |
ADEC received "Ground Water Investigation, Remediation and Monitoring at Alaskan Village Mobile Home Park" dated March 4, 2002 and received March 8, 2002. |
Eileen Olson |
3/4/2002 |
Update or Other Action |
Sent letter acknowledging partial completion of site work on the east portion of the property; that is, 122 of the 131 heating oil tanks identified either did not have soil contamination or the soil contamination was cleaned up to the most stringent 18 AAC 75. 341 method two migration-to-groundwater-pathway cleanup level. Also acknowledged that 156 of 157 surface stained areas had been cleaned up to the migration-to-groundwater-pathway levels in 18 AAC 75.341, Tables B-1 and B-2. RP has not submitted a report for cleanup of contamination associated with underground fuel pipelines and the remaining contamination associated with the former heating oil tank sites and the single stained area that exceeded cleanup levels for PCE. |
Eileen Olson |
3/8/2002 |
Update or Other Action |
ADEC received TERRASAT report "Investigation and Removal of the Heating Oil Distribution Pipeline at the Alaskan Village Mobile Home Park" dated and received March 8, 2002. |
Eileen Olson |
5/7/2002 |
Update or Other Action |
ADEC received letter report on May 8, 2002 "Re: March 2002 Monitoring Well Sampling at Alaskan Village Mobile Home Park" dated May 7, 2002. |
Eileen Olson |
5/8/2002 |
Update or Other Action |
East property (42 of about 68 acres): granted NFRAP status and Record of Decision (ROD) for SOILS only |
Eileen Olson |
6/10/2002 |
Update or Other Action |
ADEC received "Environmental Investigation and Remediation Status Report, Western Section of the Alaskan Village Mobile Home Park" dated June 10, 2002 and received June 11, 2002. |
Eileen Olson |
7/18/2002 |
Update or Other Action |
ADEC received letter report "Re: June 13, 2002 Remedial Action of Former UST Site on Lot 126 of the Alaskan Village Mobile Home Park" dated July 18, 2002 and received July 30, 2002. |
Eileen Olson |
8/9/2002 |
Update or Other Action |
East portion (42 of about 68 acres): ADEC granted NFRAP Status for groundwater and soil with notification that the Department will advise the RP if a deed notice is required. Although NFRAP status was already granted for soil only in a letter dated 5/8/2002, the letter acknowledges that additional soil cleanup of surficial spills in the East portion of the site was completed and reported in a report dated June 13, 2002. |
Eileen Olson |
8/15/2002 |
Update or Other Action |
ADEC received "Work Plan for Ground Water Remediation, Alaskan Village Mobile Home Park" dated 8/15/2002 and prepared by TERRASAT, Inc. |
Eileen Olson |
8/27/2002 |
Update or Other Action |
East property (42 of about 68 acres): letter sent stating that deed notice is not required based on site specific conditions, the fact that remaining soil contamination is in the smear zone, and the east property has a covenant restricting digging within 1.5 feet of groundwater. |
Eileen Olson |
9/6/2002 |
Meeting or Teleconference Held |
Meeting w/Terrasat to discuss cleanup requirements for groundwater and soils on west property. |
Eileen Olson |
9/16/2002 |
Update or Other Action |
Call from MOA regarding NFRAP versus NFA for western portion of property. Emailed Terrasat regarding discussion and requested status report with respect to installation of monitoring wells and ongoing contaminated soil cleanup |
Eileen Olson |
9/27/2002 |
Update or Other Action |
Email in response to request for review of a proposal for a shortened groundwater monitoring period for the west side of the property. DEC stated that baseline information regarding contaminant levels in the groundwater and remaining soil is not known so that the Department cannot fully evaluate whether the system proposed by TERRASAT will be effective. |
Eileen Olson |
12/13/2002 |
Update or Other Action |
DEC rec'd work plan of same date "Work Plan for Ground Water Remediation, Alaskan Village Mobile Home Park" |
Eileen Olson |
12/16/2002 |
Update or Other Action |
Received three submittals by TERRASAT: "Remediation and Removal of Waste Oil Contaminated Soil, Western Section of the Alaskan Village Mobile Home Park" dated December 12, 2002; "Investigation and Removal of the Heating Oil Distribution Pipeline, Western Section of the Alaskan Village Mobile Home Park, Volume I - Summary Report and Volume II - Appendix A, Analytical Reports from Pipeline and Excavation Sampling...December 13, 2002"; and "Ground Water Investigation and Monitoring, Western Section of the Alaskan Village Mobile Home Park...December 14, 2002". |
Eileen Olson |
12/16/2002 |
Update or Other Action |
Letter sent after holding peer review to review workplan/report that reported results from newly installed groundwater monitoring wells. Letter requests completion of groundwater contaminant characterization before remediation (oxygen diffusion) system is installed. |
Eileen Olson |
12/19/2002 |
Update or Other Action |
DEC rec'd "Work Plan for Monitoring Wells, Release Investigation of West Side of Alaskan Village Mobile Home Park". |
Eileen Olson |
1/3/2003 |
Update or Other Action |
NFRAP and ROD issued for western portion of property only; characterization of off-property contamination not complete but separate NFRAP granted to facilitate planning by the Municipality of Anchorage as the proposed location of a new middle school. |
Eileen Olson |
1/7/2003 |
Update or Other Action |
DEC rec'd letter dated 1/7/2003 from Muldoon Community Improvement, LLC (MCI) notifying the Department that MCI is the owner of the land described as Tract Three (3) of the Alaskan Village Subdivision, Resubdivision of Tract A of the Alaskan Village Subdivision. MCI further requested that the NFRAP letter dated 1/3/2003 be reissued to reflect the correction. |
Eileen Olson |
5/23/2003 |
Update or Other Action |
Approved plan to remediate groundwater via oxygenation and monitor wells on adjacent property. Contamination originated on site. |
Eileen Olson |
5/23/2003 |
Update or Other Action |
Approved work plan for groundwater remediation in the far southwest corner of the property and on adjacent property at 1515 Patterson Street. The remediation method will be active oxygen diffusion through the aquifer. |
Eileen Olson |
9/24/2003 |
Update or Other Action |
Approved proposal to decommission 4 monitoring wells associated with offsite groundwater characterization. Two additional wells are approved for decommissioning in Dec. 2003. There are sufficient remaining wells to monitor groundwater conditions. |
Eileen Olson |
7/26/2004 |
Update or Other Action |
Approved plan to decommission monitoring wells at 1515 Patterson. |
Eileen Olson |
8/24/2004 |
Update or Other Action |
Approved site closures for three properties adjacent to property. |
Eileen Olson |
8/31/2004 |
Institutional Control Record Established |
Institutional Controls established and entered into the database. |
Eileen Olson |
8/31/2004 |
Cleanup Complete Determination Issued |
NFRAP granted for property at 1515 Patterson impacted by off-site contaminant source at Alaskan Village, approval to decommission 7 wells on property |
Jim Frechione |
7/14/2005 |
Update or Other Action |
Rec'd letter from attorney for former Alaskan Village owner requesting a meeting regarding owned property exclusion provisions of past insurance and requesting a meeting. |
Eileen Olson |
1/11/2006 |
Update or Other Action |
Rec'd email from attorney Robert Reges advising DEC staff of schedule for testifying in Juneau at some point during the first half of May 2006. (Parties settled prior to trial). |
Eileen Olson |
9/17/2007 |
Exposure Tracking Model Ranking |
Intitial Ranking Complete for Source Area: 73000 (Autogenerated Action) |
|
9/14/2012 |
Update or Other Action |
Staff changed from Eileen Olson to IC Unit. |
Kristin Thompson |
2/25/2013 |
Update or Other Action |
Staff name changed from IC Unit to Olson in order to update the site record. |
Evonne Reese |
5/15/2015 |
Document, Report, or Work plan Review - other |
ADEC letter of this date conditionally approving "Potential Contaminated Soil & Water Management Work Plan, May 2015" plan by BGES for Tracts 8 & 9 of the Alaska Village Subdivision, located within the boundaries of the Alaskan Village Mobile Home Park (Former) site. Subsurface work to be done on the tracts by Cook Inlet Housing Authority includes installing a geothermal heat pump system and a storm drain. |
Eileen Olson |
6/30/2015 |
Update or Other Action |
Consultant TERRASAT notified ADEC that contamination was encountered during excavation for a storm drain on the western portion of Tract 8, Alaska Village Subdivision and requested approval to transport impacted soil to Alaska Soil Recycling for thermal treatment based on knowledge of areawide contamination and remaining smear zone. |
Eileen Olson |
6/30/2015 |
Offsite Soil or Groundwater Disposal Approved |
Approved off-site transport and remediation of soil from Creek View Plaza, Tract 8, western portion (a parcel within the boundaries of the former Alaskan Village Mobile Home Park). Consultant TERRASAT notified ADEC that contamination was encountered during excavation for a storm drain on the western portion of Tract 8 and requested approval to transport impacted soil to Alaska Soil Recycling for thermal treatment based on knowledge of areawide contamination and remaining smear zone. 350.4 tons of impacted soil was transported to ASR. |
Eileen Olson |
1/22/2016 |
Update or Other Action |
Signed & returned form to Alaska Soil Recycling acknowledging that 350.4 tons of petroleum-contaminated soil received on 6/30/2015 from Tract 8, Creek View Plaza was handed in accordance with ASR's approved facility operations plan such that the soil is covered by the bonding requirements of that operations plan and there is no further remedial action required by the responsible party for the soil. |
Eileen Olson |
6/14/2018 |
Institutional Control Compliance Review |
IC compliance review conducted. Staff changed from Eileen Olson to IC Unit. |
Kristin Thompson |