Site Report: USCG Aviation Hill Bldg 21, AreaB&C
Site Name: | USCG Aviation Hill Bldg 21, AreaB&C |
---|---|
Address: | Aviation Hill, Kodiak, AK 99619 |
File Number: | 2601.38.053 |
Hazard ID: | 2101 |
Status: | Active |
Staff: | Curtis Dunkin, 9072693053 curtis.dunkin@alaska.gov |
Latitude: | 57.789227 |
Longitude: | -152.409284 |
Horizontal Datum: | NAD83 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Excavated 2,400 cubic yards of 9,200 ppm DRO contaminated soil and GRO up to 250 ppm. Last staff assigned was Patrick-Riley.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
8/9/1995 | Preliminary Assessment Approved | (Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). Reviewed a phase 1 site assessment. | Kent Patrick-Riley |
8/17/1995 | Update or Other Action | (Old R:Base Action Code = RECN - Site Reconnaissance (CS)). Site reconnaissance. | Kent Patrick-Riley |
9/9/1995 | Site Characterization Report Approved | (Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). Staff received and reviewed document "Site Characterization" by VRCA and Woodward Clyde. Report noted that diesel contamination is widespread throughout the gravel pad and tundra. Three fuel systems are suspect. ADEC commented that poor sample selection and limited laboratory data make any conclusions difficult to draw. Report recommends additional investigation/cleanup. ADEC concurs. | Kent Patrick-Riley |
9/9/1995 | Update or Other Action | (Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Reviewed a remedial action plan. | Kent Patrick-Riley |
9/18/1995 | Update or Other Action | (Old R:Base Action Code = RECN - Site Reconnaissance (CS)). Site reconnaissance. | Kent Patrick-Riley |
9/18/1995 | Update or Other Action | (Old R:Base Action Code = RAU - Remedial Actions Underway (General)). Remedial action underway. | Kent Patrick-Riley |
11/9/1995 | Site Added to Database | Site added to database. | Kent Patrick-Riley |
11/28/1995 | Site Ranked Using the AHRM | Site ranked. Score = 79. | Kent Patrick-Riley |
7/10/2002 | Update or Other Action | Reviewed Phase 4 Corrective Action Soil Removal report. Requested additional infromation in Aviation Hill project to fill in gaps in our files. | Donald Seagren |
12/18/2002 | Update or Other Action | Reviewed analytical data and approved transport of approximately 2100 tons of heating fuel contaminated soil to USR Kodiak facility for thermal remediation. | Donald Seagren |
1/29/2003 | Update or Other Action | Reviewed post treatment report for 1111.38 tons of petroleum contaminated soils. Approved disposal in accordance with USR-Kodiak operations permit. Also disposal not allowed in environmentally sensitive or wetlands area. | Donald Seagren |
6/21/2004 | Update or Other Action | File number assigned and entered into the Fileroom DB and CS DB. | Alyce Hughey |
4/18/2008 | Exposure Tracking Model Ranking | Initial ranking with ETM completed. | Jeff Brownlee |
9/15/2016 | Site Visit | ADEC Contaminated Sites program staff conducted site visits and inspections of the contaminated sites which are located on the USCG Base Kodiak between September 15-16, 2016. | Curtis Dunkin |
8/22/2019 | Site Visit | ADEC traveled to the USCG Base Station, Kodiak and participated in two full days (August 21-22, 2019) of site inspections and technical project team meetings with representatives from the EPA, USCG, and their respective contracted technical support. | Curtis Dunkin |
7/22/2020 | Meeting or Teleconference Held | ADEC participated in annual project prioritization meetings on July 21 and 22 with representatives from the US Coast Guard, the Environmental Protection Agency, and respective contracted project technical support and implementation teams. The purpose of the annual meetings are for stakeholders to provide respective site status updates, conduct technical planning and site prioritization, and scheduling for implementation of projects through the current and upcoming fiscal years. | Curtis Dunkin |
9/13/2022 | Meeting or Teleconference Held | ADEC participated in two full days of annual project delivery team meetings with representatives from the USCG, EPA, and their respective contracted technical support staff. | Curtis Dunkin |
Contaminant Information
Name | Level Description | Media | Comments |
---|
Control Type
Type | Details |
---|
Requirements
Description | Details |
---|
There are no documents for this site report.