Action Date |
Action |
Description |
DEC Staff |
5/25/1995 |
Update or Other Action |
UPD action added by Shannon and Wilson, Inc., on 02/19/1997 based on Relative Risk Evaluation Worksheet dated 5/25/95. Tank Improvement is actual action, no appropriate action code available. |
S&W-Miner |
11/14/1996 |
Site Added to Database |
Site added by Shannon and Wilson. |
S&W-Miner |
4/15/2000 |
Long Term Monitoring Established |
Monitoring established by OU A ROD. |
Jason Weigle |
4/15/2000 |
Record of Decision |
The Record of Decision for this site was signed this date. |
Elim Yoon |
5/8/2001 |
Update or Other Action |
Status changed to Non-Qualifying. |
Elim Yoon |
10/10/2003 |
Record of Decision |
OU A ROD Amendment was signed on this date; site removed from OU A ROD for regulation under 18 AAC 75. OU A ROD decisions are still in place. |
Sami Goldman |
3/17/2004 |
Institutional Control Record Established |
Interim conveyance document contains an equitable servitude that restricts residential land use as well as the domestic use of groundwater. Site is also located in the downtown excavation notification zone. |
Jason Weigle |
8/30/2004 |
Conditional Closure Approved |
Site undergoing monitoring; located in downtown GW and dig restriction area |
Jason Weigle |
10/19/2004 |
GIS Position Updated |
Latitude and Longitude was derived using ArcGIS with either High Resolution Aerial Photography from the Navy with an up to 3 meters error, or line maps used in investigations combined with road layers, +/-25 feet accuracy. Metadata is as follows: Updated NAD 1983 State Plane Alaska 10 FIPS 5010 Feet; Projection: Lambert Conformal Conic; False Easting: 3280833.333333; False Northing: 0.000000; Central Meridian: -176.000000; Standard Parallel 1: 51.833333; Standard Parallel 2: 53.833333; Latitude of Origin: 51.000000; GCS North American 1983. |
Jason Weigle |
11/19/2004 |
Update or Other Action |
Draft Final Cleanup Report, 19 Sites submitted to Department for Review. |
Jason Weigle |
12/10/2004 |
Update or Other Action |
Review of Draft Final Cleanup Report, 19 sites completed; comments were submitted to the Navy. The document was incomplete as submitted; Navy will revise and resubmit. |
Jason Weigle |
3/7/2005 |
Update or Other Action |
Added MRTS data, derived from ADNR and USGS range, township, and section data overlaid on lat/lon coordinates derived previously. Accuracy is equivalent to the lat/lon coordinates. MRTS information depicts the center point of range fans and target areas; actual target areas or fans may overlap several sections. |
Jason Weigle |
4/13/2005 |
Update or Other Action |
Completed review of the Final Clean-up Report, 19 Sites. Comments submitted. |
Jason Weigle |
3/20/2006 |
Update or Other Action |
Final 2005 Institutional Control Primary Site Inspection Report received on this date. No IC problems noted at this site. |
Jason Weigle |
4/5/2006 |
Update or Other Action |
File number 2501.38.003.01 assigned on this date. |
Jason Weigle |
12/18/2006 |
Update or Other Action |
Received Draft 2006 Institutional Control Primary Site Inspection Report that details the results of annual Institutional Control (IC) inspections to determine the effectiveness of IC's selected in the OUA Record of Decision. |
Guy Warren |
12/27/2006 |
Update or Other Action |
Submitted comment letter to the Navy on the Draft Institutional Control Primary Site Inspection Report. Comments focused on the adequacy of the excavation notification program, the effectiveness of the ordnance awareness program, and visitor notification of ICs. |
Guy Warren |
3/13/2007 |
Update or Other Action |
Received the Final 2006 Institutional Control Primary Site Inspection Report. Several Department comments will be addressed through revisions of the Institutional Control Management Plan planned for 2007. The remaining comments were addressed and additional recomendations to increase efforts to notify island visitors of ICs (including the ordnance awareness education program) were included in the final document. |
Guy Warren |
2/16/2011 |
Document, Report, or Work plan Review - other |
The draft 2010 IC Site Inspection Report was received on January 11, 2011 and DEC sent comments on February 16, 2011. There were no observed problems with ICs at this site. |
Meghan Dooley |
5/12/2011 |
Document, Report, or Work plan Review - other |
The Final 2010 IC Site Inspection Report was received by ADEC. ICs appear to be functioning as intended at this site. |
Meghan Dooley |
9/26/2013 |
Site Reopened |
Site reopened in order to change the status to Non-Qualifying since this site is a duplicate of Hazard ID 3386, Adak Amulet Housing Well AMW-709. All future site updates will be applied to the Hazard ID 3386 record. |
Evonne Reese |
9/26/2013 |
Update or Other Action |
Site status has been changed to Non-Qualifying since this site record is a duplicate of Hazard ID 3386, Adak Amulet Housing Well AMW-709. |
Evonne Reese |