| Action Date |
Action |
Description |
DEC Staff |
| 1/1/1990 |
Update or Other Action |
FFCA of 1990 governs RCRA sites including this one. Also considered a petroleum/SAERA site. |
Former Staff |
| 1/1/1994 |
Update or Other Action |
Site included under State-Navy two-party SAERA agreement for petroleum sites. |
Former Staff |
| 10/14/1994 |
Site Added to Database |
VOCs, SVOCs, and metals suspected. |
Former Staff |
| 2/23/1996 |
Site Ranked Using the AHRM |
Site ranked. Score = 2. |
Scott Pexton |
| 3/14/1997 |
Update or Other Action |
UPD action added by Shannon and Wilson on 3/14/97, based on Relative Risk Evaluation Worksheet (not dated). RCRA Closure is current phase listed on worksheet. No pathways nor receptors are identified. |
S&W-Miner |
| 5/1/1998 |
Proposed Plan |
Site included in Proposed Plan for OU-A. |
Christina Goff |
| 9/1/1999 |
Update or Other Action |
Site included in OU-A ROD and recommended for limited soil removal. |
Kevin Oates |
| 4/15/2000 |
Record of Decision |
The Record of Decision for this site was signed this date. |
Elim Yoon |
| 12/28/2001 |
Institutional Control Record Established |
nstitutional Control Established. Includes Equitable Servitude for: Commercial/Industrial Land Use Restrictions, Excavation permit required for areas with Soil Excavation Restrictions, and requirements for Inspections and Reporting. See document “Adak Island Institutional Control Management Plan, Final Edition, December 2001, Prepared by: Engineering Field Activity, Northwest.” |
Elim Yoon |
| 8/19/2003 |
Site Number Identifier Changed |
Changed Workplan from X1 to X9 to reflect presence of hazardous substances. |
Beatrice Egbejimba |
| 6/4/2004 |
Update or Other Action |
Limited soil removal recommended in ROD has been delayed because site is an active fueling facility. |
Jason Weigle |
| 10/19/2004 |
GIS Position Updated |
Latitude and Longitude was derived using ArcGIS with either High Resolution Aerial Photography from the Navy with an up to 3 meters error, or line maps used in investigations combined with road layers, +/-25 feet accuracy. Metadata is as follows: Updated NAD 1983 State Plane Alaska 10 FIPS 5010 Feet; Projection: Lambert Conformal Conic; False Easting: 3280833.333333; False Northing: 0.000000; Central Meridian: -176.000000; Standard Parallel 1: 51.833333; Standard Parallel 2: 53.833333; Latitude of Origin: 51.000000; GCS North American 1983. |
Jason Weigle |
| 2/9/2005 |
Update or Other Action |
Interim conveyance document contains an equitable servitude that restricts residential land use as well as the domestic use of groundwater. Site is also located in the downtown excavation notification zone. |
Jason Weigle |
| 3/7/2005 |
Update or Other Action |
Added MRTS data, derived from ADNR and USGS range, township, and section data overlaid on lat/lon coordinates derived previously. Accuracy is equivalent to the lat/lon coordinates. MRTS information depicts the center point of range fans and target areas; actual target areas or fans may overlap several sections. |
Jason Weigle |
| 3/8/2005 |
Update or Other Action |
Added legal description for site. |
Jason Weigle |
| 6/16/2005 |
Update or Other Action |
Draft Close Out Report for Partial Delisting submitted for review on this date. Delisting does not impact petroleum work recommended for this site. |
Jason Weigle |
| 8/16/2005 |
Update or Other Action |
Comments on Draft Close Out Report for Partial Delisting submitted to Navy on this date. |
Jason Weigle |
| 1/5/2006 |
Update or Other Action |
Changed site status to inactive due to the fact that work cannot be performed at this site as it is the location of the current fueling facility for the City of Adak. The Navy is investigating beginning work sometime in FY08 if conditions allow. |
Jason Weigle |
| 3/20/2006 |
Update or Other Action |
Final 2005 Institutional Control Primary Site Inspection Report received on this date. No IC problems noted at this site. |
Jason Weigle |
| 4/5/2006 |
Update or Other Action |
File number 2501.38.002.01 assigned on this date. |
Jason Weigle |
| 12/18/2006 |
Update or Other Action |
Received Draft 2006 Institutional Control Primary Site Inspection Report that details the results of annual Institutional Control (IC) inspections to determine the effectiveness of IC's selected in the OUA Record of Decision. |
Guy Warren |
| 12/27/2006 |
Update or Other Action |
Submitted comment letter to the Navy on the Draft Institutional Control Primary Site Inspection Report. Comments focused on the adequacy of the excavation notification program, the effectiveness of the ordnance awareness program, and visitor notification of ICs. |
Guy Warren |
| 1/29/2007 |
Update or Other Action |
Received Draft "Remedial Action Closure at Four Petroleum Sites, Former Naval Air Facility, Adak, Alaska, Tango Pad, SA-77, SA-82, and ASR-8" report. The report details the results of remedial activities that were conducted at these four sites during the 2006 Field Season. |
Guy Warren |
| 2/26/2007 |
Update or Other Action |
Submitted comment letter on the Draft Remedial Closure Report. Comments focused primarily on other sites detailed in this report. One confirmation sample from this area exceeds the Method Two cleanup level. |
Guy Warren |
| 3/13/2007 |
Update or Other Action |
Received the Final 2006 Institutional Control Primary Site Inspection Report. Several Department comments will be addressed through revisions of the Institutional Control Management Plan planned for 2007. The remaining comments were addressed and additional recomendations to increase efforts to notify island visitors of ICs (including the ordnance awareness education program) were included in the final document. |
Guy Warren |
| 4/5/2007 |
Update or Other Action |
Received Final Remedial Action Closure repor that detailed remediation activites that oc curred in 2006 at SA-77. The Department's comments have been addressed in this report. |
Guy Warren |
| 7/16/2007 |
Conditional Closure Approved |
The Department issued a Conditional Closure determination for petroleum contamination at the SA-77 Fuel Division Drum Storage Site. Contaminated soil was excavated from the site on October 9-12, 2006. One confirmation soil sample contained 560 ppm DRO which exceeds the 18 AAC 75.341 Method Two soil cleanup level. Laboratory results for the remaining confirmation samples were below the applicable cleanup level. Due to the shallow nature of soil contamination ground water impacts are not anticipated. The remaining contamination does not pose a threat to human health, public safety, or the environment. The site is eligible for conditional closure due to the one exceedance in the confirmation samples. |
Guy Warren |
| 2/16/2011 |
Document, Report, or Work plan Review - other |
The draft 2010 IC Site Inspection Report was received on January 11, 2011 and DEC sent comments on February 16, 2011. There were no observed problems with ICs at this site. |
Meghan Dooley |
| 5/12/2011 |
Document, Report, or Work plan Review - other |
The Final 2010 IC Site Inspection Report was received by ADEC. ICs appear to be functioning as intended at this site. |
Meghan Dooley |
| 6/4/2013 |
Institutional Control Periodic Reporting |
The Final 2012 Institutional Control Site Inspection Report was received. There were no observed changes to land use and no indications of groundwater use or excavation activities. Signs were present. ICs appear to be functioning as intended. |
Meghan Dooley |
| 9/10/2014 |
Institutional Control Periodic Reporting |
The Final 2013 Institutional Control Site Inspection Report was received. There were no observed changes to land use and no indications of groundwater use or excavation activities. Signs were present. ICs appear to be functioning as intended. IC inspection frequency has been reduced to every 4 or 6 years (to coincide with the 5-year review). |
Guy Warren |
| 3/16/2015 |
Update or Other Action |
Received Final 2014 Institutional Controls Site Inspection Report, OUA and OUB of the former Adak Naval Complex. All IC’s appear to be functioning as intended. Review of contaminants remaining in place indicate maximum concentration remaining is 560 ppm DRO. Navy is petitioning to remove IC requirement to the site based on recent updates to ADEC closure criteria. The request is under consideration. |
Guy Warren |
| 10/14/2016 |
Cleanup Complete Determination Issued |
Submit Cleanup Complete Determination letter to US Navy for SA-77. At the request of the Navy ADEC conducted a review of site data to determine if it was appropriate to remove IC's from this site. Following excavation in 2006 one confirmation sample contained 560 ppm DRO at 2.5 ft BGS. Based on a lack of IC issues over the last 10 years, no ground water impacts, and low lever of remaining soil contamination it has been determined that removal of IC's is appropriate for this site. |
Guy Warren |
| 10/14/2016 |
Institutional Control Record Removed |
Institutional Controls have been removed. |
Guy Warren |
| 3/11/2024 |
ANCSA Program Eligible |
This site meets the criteria for the EPA Contaminated ANCSA Lands program: the site is on ANCSA conveyed land, the contamination occurred pre-ANCSA conveyance, and there is documented proof of contamination that exceeds DEC’s cleanup values in 18 AAC 75. This site will be listed as “verified” on EPA’s contaminated lands inventory. |
Brittani Mack |