Action Date |
Action |
Description |
DEC Staff |
3/8/1994 |
Update or Other Action |
Responded to NSB's Site Characterization document. Report indicates that diesel contamination is widespread around the pumphouse and fuel line. Depth of contamination not determined. ADEC concurred that the next phase could combine excavation with assessment. ADEC did not agree with report's proposal to use dirty dirt to build berm for new tank system. NSB plans to continue work this summer, pending funds.(Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). McLoone comments: samples collected limited to surface samples and only five laboratory analytical results reported up to 8,400 ppm DRO by 8100. Both GRO and RRO reported as not detected which is unusual if not suspect. |
Ben Thomas |
4/18/1994 |
Site Added to Database |
Petroleum contamination. |
Ben Thomas |
6/20/1994 |
Update or Other Action |
(Old R:Base Action Code = RPL2 - Site Information Request Letter). Sent PRP-CS Database Notification Letter to RP requesting update and more environmental information concerning contaminated site. RP received letter, but no response yet. |
Jeff Peterson |
7/6/2005 |
Update or Other Action |
Site visit conducted in 2003 found the pumphouse had been decommissioned in the 1990's. PID readings did not indicate contamination at the former pumphouse, however clean fill had apparently been brought in after the pumphouse was decommissioned. |
Bill O'Connell |
7/26/2007 |
Meeting or Teleconference Held |
ADEC staff met with representatives from NSB and their consultant to review open status village files and to propose responses to the ADEC's request for further information and characterization at this site. |
Bill O'Connell |
9/21/2007 |
Exposure Tracking Model Ranking |
|
Bill O'Connell |
10/25/2007 |
Meeting or Teleconference Held |
Meeting today with NSB and their consultant. This site remains an active fueling facility, however additional work needs to be done to characterize the nature and extent of contamination from the former fueling facility. |
Bill O'Connell |
5/6/2008 |
Update or Other Action |
Meeting with NSB and their consultant and submittal of Areawide Contaminated Sites report (dated April 2008) for Anaktuvuk Pass. Data QA/QC conducted. This report includes figures and data from the 2003 investigations. Petroleum contaminants were not detected in soil samples collected at the former pumphouse, however the area had been regraded and only surface samples were collected. Reportedly site contains large "clasts" that may make future sampling efforts also limited. |
Bill O'Connell |
12/8/2011 |
Meeting or Teleconference Held |
Meeting today to discuss site status and potential future activities at the site. Investigate summer 2012. |
Bill O'Connell |
11/14/2012 |
Meeting or Teleconference Held |
O'Connell met with NSB to discuss site status and potential future activities at the site. No excavations to date, will coordinate excavation with soils removal. |
Keather McLoone |
10/8/2015 |
Potentially Responsible Party/State Interest Letter |
Letter sent on this day with brief site history and request for additional investigation. Work plan requested by February 1, 2016. |
Joshua Barsis |
1/17/2017 |
Update or Other Action |
Letter sent to NSB on this day detailing the current status/progress of 22 active contaminated sites, including this site. |
Joshua Barsis |
11/20/2017 |
Update or Other Action |
Letter sent on this day as a follow up to the last version of this letter, dated January 17, 2017, and as a follow up to a meeting with NSB on November 17, 2017. This letter details the current status/progress of 23 active contaminated sites, including this site. |
Joshua Barsis |
11/16/2018 |
Update or Other Action |
Letter sent on this day as a follow up to the last version of this letter, dated November 20, 2017, and at the request of the North Slope Borough (NSB). This letter details the current progress of 24 active contaminated sites, including this site. |
Joshua Barsis |
12/13/2019 |
Enforcement Action |
Compliance letter sent on this day. |
Joshua Barsis |
1/31/2020 |
Document, Report, or Work plan Review - other |
Reviewed the NSB Anaktuvuk Pass Former Pumphouse Site Characterization Work Plan, dated January 29, 2020. Proposed activities consist of advancing 12 soil borings at the site to an approximate depth of 5 feet. Two soil samples are planned from each borehole; one from depth of greatest apparent contamination, and one from the termination depth of the boring. |
Joshua Barsis |
2/19/2020 |
Enforcement Action |
Notice of Violation issued to NSB on February 18, 2020. See file for more information. |
Joshua Barsis |
3/9/2022 |
Update or Other Action |
UMIAQ submitted modifications to the conditionally approved 2020 work plan. The modifications include installation or four monitoring wells and sampling of surface water if surface water is present. Modifications were approved. |
Lisa Krebs-Barsis |
6/29/2022 |
Enforcement Agreement or Order |
A compliance order by consent (COBC) was signed by the North Slope Borough and ADEC Division of SPAR. The COBC identifies corrective actions that the NSB will take to manage cleanup waste and characterize and remediate contaminated sites and spills. |
Lisa Krebs-Barsis |