Action Date |
Action |
Description |
DEC Staff |
7/13/1995 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 77964 DRO contamination. |
Bill Petrik |
7/13/1995 |
Site Added to Database |
|
Former Staff |
7/26/1995 |
Leaking Underground Storage Tank Corrective Action Underway |
On 7/21/95 ADEC approved of contaminated soils to be disposed of at the Anchorage Regional Landfill. On 7/26/95, 38.13 tons of contaminated soil was disposed of. Composite sampling indicated the concentration was less than 1,000 mg/kg. MOA authorization letter and landfill receipts are in Appendix D of the S&S Engineering report "Underground Storage Tank Removal and Release Investigation" dated July 1995. |
Tim Stevens |
7/26/1995 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
I entered this backdated action on 7/19/07 based on the fact that contaminated soil was excavated and disposed of this date at the Anchorage Regional Landfill. |
Bill Janes |
12/23/1996 |
Update or Other Action |
Received a copy of the S&S Engineering report "National Bank of Alaska; Lot 4A; Tract A2; Alaska Mutual Subdivision; 1500 West Benson Blvd., Anchorage". |
Lynne Bush |
4/23/2003 |
Update or Other Action |
Site initially entered on the CSP Database and ranked using the AHRM by Elizabeth Stergiou. |
Elizabeth Stergiou |
6/28/2005 |
Underground Storage Tank Site Characterization or Assessment |
Reviewed a copy of the S&S Engineering "National Bank of Alaska, 1500 West Benson, Initial Water Samples" dated September 1995, received by the department on 10/20/95. Two monitoring wells were installed: MW1 to the southwest (30 feet) and MW2 to the south (100 feet) of the UST. They were sampled on 9/26/95 and had 0.277 mg/l DRO in MW1 and 0.202 mg/l DRO in MW2. Groundwater was encountered at 8 feet below ground surface. Soil samples were collected near the soil/water interface, MW1 had 39.5 mg/kg DRO and MW2 has 37.2 mg/kg DRO. |
Robert Weimer |
3/14/2006 |
Update or Other Action |
Staff changed from Sundet to Petrik. |
Bill Petrik |
11/27/2006 |
Update or Other Action |
Site data transferred from the CSP to the LUST DB. Formerly file number 2100.38.070. Updated erroneous latitude and longitude using TopoZone Pro. Latitude and longitude data gathered from TopoZone Pro Hi-Res Urban Aerial Photo, Large Size Map, 1:2,952 Scale, No Topo Base Map, NAD 83 in conjunction with Anchorage Area Atlas and figure S&S Engineering "Contaminated Site Located at 1500 West Benson (National Bank of Alaska)" dated 8/1/95. High degree of confidence in accuracy of coordinates. They could only be improved using an on-site GPS. |
Bill Petrik |
11/29/2006 |
Update or Other Action |
File number reassigned from 2100.38.070 to 2100.26.316. |
Aggie Blandford |
11/30/2006 |
Update or Other Action |
RECKEY has automatically been generated. |
Former Staff |
4/7/2008 |
Exposure Tracking Model Ranking |
Initial ranking. |
Bill Petrik |
5/4/2011 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 77964 Former 700 Gallon Diesel Emergency Generator UST. |
Bill O'Connell |
5/17/2011 |
Cleanup Complete Determination Issued |
The Alaska Department of Environmental Conservation, Contaminated Sites Program (ADEC) has completed a review of the environmental records associated with National Bank of Alaska-Benson, located at 1500 West Benson Blvd. in Anchorage, Alaska. Based on the information provided to date, it has been determined that the contaminant concentrations remaining on site do not pose an unacceptable risk to human health or the environment and no further remedial action will be required as long as the site is in compliance with established institutional controls (ICs).
|
Bill O'Connell |
5/17/2011 |
Institutional Control Record Established |
Institutional Controls established and entered into the database. |
Bill O'Connell |
7/5/2011 |
Document, Report, or Work plan Review - other |
Work plan approved for decommissioning of two monitoring wells |
Bill O'Connell |
8/5/2011 |
Update or Other Action |
Report detailing the decommissioning of the two onsite monitoring wells received by ADEC. |
Bill O'Connell |
2/8/2012 |
Institutional Control Compliance Review |
IC review conducted, staff named changed from O'Connell to IC Unit, reminder system updated to follow up with RP in five years regarding site conditions. |
Evonne Reese |
9/6/2016 |
Institutional Control Compliance Review |
IC compliance review conducted. Scheduled to send IC reminder letter in near future. |
Nathan Maxwell |
9/7/2016 |
Institutional Control Update |
Sent IC reminder letter to the responsible party on this date. |
Nathan Maxwell |
6/20/2018 |
Institutional Control Compliance Review |
IC compliance review conducted. Closure/IC Details updated. Reminder system already set for follow-up in 2021. |
Kristin Thompson |
4/1/2019 |
Institutional Control Record Removed |
|
Jamie Grant |