Action Date |
Action |
Description |
DEC Staff |
9/7/1999 |
Underground Storage Tank Site Characterization or Assessment |
UST sampling and closure report received. |
Colin Craven |
1/31/2001 |
Update or Other Action |
Comments submitted on September 7 sampling and closure report. |
Colin Craven |
5/9/2001 |
Release Investigation |
Draft of the continued release investigation received. |
Colin Craven |
11/6/2001 |
Update or Other Action |
"Follow On Investigation" report received. Report sent to Wiegers. |
Colin Craven |
11/2/2005 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 76031 File review and generation of LUST entries specific to each tank. 2001 site investigation found high concentrations of DRO, BTEX, and chlorinated compounds. Continuing investigation under Air Force Installation Restoration Program. See the Contaminated Sites Database "Galena AFS - JP4 Fillstands" entry for current information. |
Colin Craven |
11/2/2005 |
Site Added to Database |
|
Former Staff |
11/2/2005 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
Includes removal actions conducted under the JP-4 Fillstands contaminated site (see problem statement above) and removal of the UST. |
Evonne Reese |
11/30/2005 |
Update or Other Action |
RECKEY has automatically been generated. |
Former Staff |
1/18/2011 |
Document, Report, or Work plan Review - other |
ADEC received the Draft ST009 Vapor Intrusion Workplan. |
Fred Vreeman |
2/23/2011 |
Document, Report, or Work plan Review - other |
ADEC provided review comments on the ST009 Vapor Intrusion Workplan. |
Fred Vreeman |
5/2/2011 |
Update or Other Action |
ADEC received the Air Force responce to comments from the review of Draft ST009 Vapor Intrusion Workplan. |
Fred Vreeman |
7/19/2011 |
Document, Report, or Work plan Review - other |
ADEC approved the revised draft ST009 Vapor Intrusion Workplan. |
Fred Vreeman |
5/3/2012 |
Document, Report, or Work plan Review - other |
DEC recieved a Draft Site Characterization Report that addresses UST 1572. |
Fred Vreeman |
9/28/2012 |
Document, Report, or Work plan Review - other |
DEC provided review comments for the Draft Site Characterization results report. |
Dennis Shepard |
5/29/2013 |
Document, Report, or Work plan Review - other |
DEC received a Response to comments and a Draft Final Site Characterization results report. |
Dennis Shepard |
6/14/2013 |
Document, Report, or Work plan Review - other |
DEC provided comments for the Draft Final Site Characterization results report. |
Dennis Shepard |
6/14/2013 |
Document, Report, or Work plan Review - other |
DEC provided comments for the Draft Final Site Characterization results report. |
Dennis Shepard |
10/8/2013 |
Site Characterization Report Approved |
DEC approved the Site Characterization results report for JP-4 Fill-stands, 1572 Liquid Fuel Pump Station, 3,000-gallon UST (Former UST 1572), and 2,000-gallon UST (Former UST 1572-2) (Site ST009), Former Galena Forward Operating Location (FOL), Alaska. |
Dennis Shepard |
9/18/2014 |
Site Characterization Report Approved |
DEC Approved the Supplemental Site Characterization Investigation Results Report, JP-4 Fill-stands, 1572 Liquid Fuel Pump Station, 3,000-gallon UST (Former UST 1572), and 2,000-gallon UST (Former UST 1572-2) (Site ST009), Former Galena Forward Operating Location (FOL), Alaska. |
Monte Garroutte |
10/26/2016 |
Meeting or Teleconference Held |
A restoration Advisory board meeting was held in Galena Alaska to discuss the general and specific status of site investigations and cleanup at Galena. |
Dennis Shepard |
8/8/2018 |
Site Visit |
DEC conducted a site visit at the Former Forward Operating Location in Galena, AK on August 8-9, 2018. A photo log is available in DEC's electronic file. |
Jamie McKellar |
10/29/2018 |
Site Visit |
On October 23, 2018, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit with inspections of each site was conducted the following day (10/24/2018) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
1/2/2019 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: 2017 Performance Monitoring Report for Sites CPL006, CSS002, OW024, SS014/SS017, SS016, SS022, SS025, ST009, and ST010. Parsons, December 2018. The report presents and evaluates performance monitoring data for sites managed by Parsons with an approved Cleanup Plan or Record of Decision (ROD), and an active remedy installed and operating for fiscal year 2017. |
Jamie McKellar |
4/5/2019 |
Site Visit |
On April 2, 2019, DEC staff participated in a Technical Project Team meeting with representatives from USAF, Parsons, CH2M, and ADOT. The TPT meeting was held at the Fairbanks DEC office. On April 3-4, 2019, DEC staff traveled to Galena to participate in meetings with the City Mayor & RAB chair to discuss community concerns about site cleanup; a Proposed Plan meeting for Site DP023, and a community regional advisory board (RAB) meeting to discuss fieldwork completed during the 2018 field season and upcoming 2019 fieldwork. Site visits were also conducted. |
Jamie McKellar |
10/23/2019 |
Meeting or Teleconference Held |
On October 22, 2019, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit was conducted the following day (10/23/2019) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
8/23/2023 |
Document, Report, or Work plan Review - other |
REPORT APPROVED: Final Remedial Process Optimization Evaluation Report, Former Galena Forward Operating Location, Alaska (Parsons, June 2023) |
Jamie McKellar |
11/15/2023 |
Site Visit |
DEC, DOT, USAF, and contractors met at the Fairbanks DEC office on May 2, 2023 for a Technical Project Team meeting. The following day a site visit and Regional Advisory Board (RAB) meeting were held in Galena. Meeting minutes for the TPT and RAB meetings were approved on November 15, 2023. |
Jamie McKellar |
4/23/2024 |
Meeting or Teleconference Held |
CS staff participated in the biannual Technical Project Team (TPT) meeting with representatives from USAF BRAC, Parsons, Jacobs/CH2M Hill, and EA Engineering. The meeting was held at the EA Engineering office in Anchorage, AK. |
Jamie McKellar |
6/27/2024 |
Document, Report, or Work plan Review - other |
DEC approved multiple data quality assessment reports for soil, soil vapor, groundwater, and sediment. Reports were submitted by Parsons and CH2M/Jacobs. Approval letter is dated 6/27/2024. |
Jamie McKellar |