Action Date |
Action |
Description |
DEC Staff |
11/22/2005 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 76034 1997 tank pull report documented DRO above Method 2 cleanup levels. Currently negotiating with AF Compliance about past UST removals to see which sites merit further investigation. |
Colin Craven |
11/22/2005 |
Site Added to Database |
|
Former Staff |
11/30/2005 |
Update or Other Action |
RECKEY has automatically been generated. |
Former Staff |
9/1/2010 |
Site Visit |
Site Visit, scoping future IRA locations |
Amanda Loomis |
12/7/2010 |
Meeting or Teleconference Held |
TPT Meeting, site discussed |
Fred Vreeman |
1/11/2011 |
Meeting or Teleconference Held |
Scoping call for SS014/17/21 |
Fred Vreeman |
2/15/2011 |
Meeting or Teleconference Held |
TPT meeting, site discussed |
Fred Vreeman |
4/4/2011 |
Document, Report, or Work plan Review - other |
FSP for SS014/16/19/21 reviewed |
Fred Vreeman |
4/19/2011 |
Meeting or Teleconference Held |
TPT meeting, site discussed |
Fred Vreeman |
5/11/2011 |
Meeting or Teleconference Held |
Traffic control plan/IRA meeting |
Fred Vreeman |
5/23/2011 |
Meeting or Teleconference Held |
TPT meeting, site discussed |
Fred Vreeman |
6/9/2011 |
Site Visit |
Site Visit to IRA location |
Fred Vreeman |
6/10/2011 |
Site Characterization Workplan Approved |
Contingent approval for SC sampling locations. |
Fred Vreeman |
6/10/2011 |
Conceptual Site Model Submitted |
CSM submitted |
Fred Vreeman |
7/1/2011 |
Document, Report, or Work plan Review - other |
Response to Comments on Interim Removal Action Work Plan receieved from USAF |
Fred Vreeman |
7/7/2011 |
Document, Report, or Work plan Review - other |
RTC on IRA workplan reviewed. |
Fred Vreeman |
7/8/2011 |
Update or Other Action |
Interim Removal Action Work Plan comment responses acceptance letter sent to USAF |
Fred Vreeman |
7/11/2011 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 76034 name: autogenerated pm edit - Galena Airport - UST 1556-2 |
Amanda Loomis |
7/15/2011 |
Update or Other Action |
Draft Final Interim Removal Action Work Plan submitted by USAF |
Fred Vreeman |
7/22/2011 |
Document, Report, or Work plan Review - other |
Additional interim removal action markups receieved from USAF |
Fred Vreeman |
7/26/2011 |
Interim Removal Action Approved |
Work Plan for interim removal action approved |
Fred Vreeman |
8/24/2011 |
Update or Other Action |
Draft Final SS014/SS017/SS021 Field Sampling Plan submitted by USAF |
Fred Vreeman |
9/2/2011 |
Offsite Soil or Groundwater Disposal Approved |
Approval to move soil to stockpile at Campion AS |
Fred Vreeman |
9/2/2011 |
Update or Other Action |
Final Interim Removal Action Work Plan received from USAF |
Fred Vreeman |
12/22/2011 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
Adminstrative action addition for grant reporting purposes.
|
Evonne Reese |
12/27/2011 |
Update or Other Action |
Draft Final Field Sampling Plan for SS014/SS017/SS021 Approved. |
Dennis Shepard |
5/16/2012 |
Document, Report, or Work plan Review - other |
DEC received a Draft Interim Removal Action Excavation Report for Sites SS005, AST1569, SS014, and SS017. |
Dennis Shepard |
5/18/2012 |
Document, Report, or Work plan Review - other |
DEC received a Draft Site Characterization Report for Sites SS014/SS017/SS021. |
Dennis Shepard |
11/20/2012 |
Document, Report, or Work plan Review - other |
DEC provided review comments for the Draft Interim Removal Action Excavation Report for Sites SS005, AST1569, SS014, and SS017. Based on the review of the removal actions, all abandoned fuel lines at SS017 should be considered future sources of release and require investigation and removal. |
Dennis Shepard |
11/21/2012 |
Document, Report, or Work plan Review - other |
DEC provided review comments for the Draft Site Characterization Report for Sites SS014/SS017/SS021. Based on review of the report, the lateral and vertical extent of contamination has not been fully delineated east of SS017.
Based on the report and review of sampling, no contamination related to the UST 1556-2 was identified above Method two cleanup levels near the former tank location. |
Dennis Shepard |
9/6/2013 |
Meeting or Teleconference Held |
A teleconference was held to discuss final resolution of comments for the SS014/SS017/SS021 Site Characterization Report. |
Dennis Shepard |
12/8/2014 |
Cleanup Complete Determination Issued |
Data was collected during a 2011 Site Characterization investigation to gain closure approval for the former UST 1556-2. The Final Site Characterization results report, Birchwood Hangar (Site SS014), Truck Fill-Stands (Site SS017), and Old Fire Station (Site SS021) recommended a cleanup complete determination for the UST 1556-2 site. The only target analytes that exceeded extent SLs collected near the former UST were the Polycyclic Aromatic Hydrocarbons (PAH) benzo(a)pyrene and dibenzo(a,h)anthracene, which were detected below Method two, table B1 cleanup levels at 0 to 2 feet bgs.
Based on a review of the environmental record and of cumulative risk calculations using the method three risk calculator, ADEC has determined that residual contaminant concentrations do not pose a cumulative human health risk. Cleanup Complete Status is appropriate. |
Dennis Shepard |
1/2/2019 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: 2017 Performance Monitoring Report for Sites CPL006, CSS002, OW024, SS014/SS017, SS016, SS022, SS025, ST009, and ST010. Parsons, December 2018. The report presents and evaluates performance monitoring data for sites managed by Parsons with an approved Cleanup Plan or Record of Decision (ROD), and an active remedy installed and operating for fiscal year 2017. |
Jamie McKellar |