Site Report: GVEA North Pole Power Plant
Site Name: | GVEA North Pole Power Plant |
---|---|
Address: | 1100 H & H Lane, Inside Mapco Refinery, North Pole, AK 99705 |
File Number: | 103.38.003 |
Hazard ID: | 2318 |
Status: | Active |
Staff: | Jim Fish, 9074512117 james.fish@alaska.gov |
Latitude: | 64.735398 |
Longitude: | -147.349855 |
Horizontal Datum: | NAD27 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
GVEA-sampled soils beneath one decommissioned tank showed elevated levels of diesel range organics (DRO) at 1-3 feet below grade. Vertical and horizontal extent of soil contamination unknown. Groundwater impact unknown. Class C water well present on site. GVEA wishes to decommission tanks into smaller facility. See cross-reference C-plans file number 103.17.002.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
9/12/1994 | Update or Other Action | (Old R:Base Action Code = RPL2 - Site Information Request Letter). Requested that GVEA conduct comprehensive site assessment to determine extent of soil and GW contamination. ADEC would not accept encapsulation without verifying no risk or impact to groundwater and knowledge of full extent of soil contamination. | Cindy Thomas |
9/26/1994 | Site Added to Database | GVEA North Pole Power plant. File# 103.38.003. | Cindy Thomas |
10/26/1994 | Site Ranked Using the AHRM | Initial ranking. | Former Staff |
10/31/1994 | Update or Other Action | (Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Received and reviewed soil boring data conducted by S&W for GVEA. Report included GVEA's request to encapsulate soils. ADEC conditionally approved cleanup action, based on: 1. That a plan be submitted to ADEC for approval. 2. That encapsulation include the entire area inside the ring wall. 3. That the site is not eligable for NFA based on current levels. 4. That ADEC can reopen the case and require cleanup if new information shows contamination. | Cindy Thomas |
10/31/1994 | Update or Other Action | (Old R:Base Action Code = SA2R - Phase II SA Review (CS)). Received and reviewed soil boring data conducted by S&W for GVEA. No appreciable soil contamination noted below 3 feet, or in the saturated zone. Historic MW data shows no impact in GW down gradient from GVEA tanks. GVEA proposed encapsulation of existing soils based on non-leachablity inferences. GVEA assumes entire upper three feet of soil column is contaminated. | Ben Thomas |
1/19/1995 | Update or Other Action | SITE SUMMARY: Old Tank farm within Mapco refinery plant being decommissioned. ADEC agreed to consider an encapsulation plan for contaminated soils under the first (northernmost) tank foot print. Plan has not yet been submitted. Extent of contamination identified under the first tank, but not the other three. ADEC requested additional information on site conditions of the rest of the facility. GW impact unconfirmed. | Cindy Thomas |
7/10/2002 | GIS Position Updated | Changed the Latitude, Longitude, Method Accuracy, Accuracy and Unit fields. | Heather Goldman |
6/2/2008 | Update or Other Action | Site transferred from Frechione to Farris | Ann Farris |
7/3/2008 | Exposure Tracking Model Ranking | Initial ranking with ETM completed. | Ann Farris |
12/15/2014 | Update or Other Action | Staff name changed from Cardona to DeRuyter. | Evonne Reese |
5/30/2018 | Meeting or Teleconference Held | Met with GVEA staff and consultant to discuss historic site assessments and status of monitoring on various properties | Jim Fish |
5/31/2018 | Update or Other Action | Sent scanned NP Power Plant facility sketch to GVEA staff | Jim Fish |
6/1/2018 | Update or Other Action | Sent additional scanned documents (subsurface sampling report, 1994 correspondence, site sketch) to GVEA staff | Jim Fish |
8/28/2019 | Update or Other Action | Received site map of soil borings and encapsulation area from RP | Jim Fish |
9/10/2019 | Update or Other Action | Received soil boring map from 2016 Phase II (purchased property from FHR). | Jim Fish |
Contaminant Information
Name | Level Description | Media | Comments |
---|
Control Type
Type | Details |
---|
Requirements
Description | Details |
---|
There are no documents for this site report.